DR1985:0288
Description:
- This preparatory drawing shows an oblique bird's-eye view for the north side of Fallingwater, a three-storey single-family dwelling designed as a part masonry, part cantilevered concrete slab construction. Rough quarry stone walls form a series of staggered blind screens which protect the privacy of the family sleeping quarters on the second and third floors. A broad concrete slab (later built as concrete trellis beams) serves doubly as bridge and canopy over the main entrance below.
architecture
between September 1935 and 1936
Preliminary perspective sketch for Fallingwater, Bear Run, Pennsylvania, as seen from the hill above, showing oblique view of north elevation
Actions:
DR1985:0288
Description:
- This preparatory drawing shows an oblique bird's-eye view for the north side of Fallingwater, a three-storey single-family dwelling designed as a part masonry, part cantilevered concrete slab construction. Rough quarry stone walls form a series of staggered blind screens which protect the privacy of the family sleeping quarters on the second and third floors. A broad concrete slab (later built as concrete trellis beams) serves doubly as bridge and canopy over the main entrance below.
architecture
textual records
ARCH259088
Description:
Documentation de projets divers pour Considère, Pelnard & Caquot dans un portefeuille d'Ernest Cormier, incluant des notes et calculs et tableaux, des dessins, des devis, des reprographies, des notes et calculs écrit en allemand. Comprend aussi un bloc-notes, 2 livres « Nouvelle méthode de calcul des grandes constructions continues » et « Calcul des enveloppes de révolution », 3 essais techniques en allemand, 2 revues polytechniques en allemand, et la publication « Drawing Office Instructions » de la Dominion Bridge Company (1902).
1902, 1914-1928
Documentation de projets divers à Paris pour Considère, Pelnard & Caquot
Actions:
ARCH259088
Description:
Documentation de projets divers pour Considère, Pelnard & Caquot dans un portefeuille d'Ernest Cormier, incluant des notes et calculs et tableaux, des dessins, des devis, des reprographies, des notes et calculs écrit en allemand. Comprend aussi un bloc-notes, 2 livres « Nouvelle méthode de calcul des grandes constructions continues » et « Calcul des enveloppes de révolution », 3 essais techniques en allemand, 2 revues polytechniques en allemand, et la publication « Drawing Office Instructions » de la Dominion Bridge Company (1902).
textual records
1902, 1914-1928
drawings
AP099.S1.D12.010
27 June 1963
drawings
27 June 1963
drawings
AP099.S1.D12.012
15 May 1963
Details and sections of additional reinforced steel at lines 4w and 5w
Actions:
AP099.S1.D12.012
drawings
15 May 1963
drawings
AP099.S1.D12.013
15 July 1963
Details and sections of reinforing wall between line 1 and north wall
Actions:
AP099.S1.D12.013
drawings
15 July 1963
drawings
Quantity:
3 reprographic copy(ies)
AR1996:1001:342
25 June 1963
Sections and details of reinforcement of trusses in chapel (sacristry)
Actions:
AR1996:1001:342
drawings
Quantity:
3 reprographic copy(ies)
25 June 1963
drawings
AR1996:1001:340
27 June 1963
drawings
27 June 1963
drawings
Quantity:
3 File
AP099.S1.D12.007
25 June 1963
Sections and details of reinforcement of trusses in chapel (sacristry)
Actions:
AP099.S1.D12.007
drawings
Quantity:
3 File
25 June 1963
drawings
AR1996:1001:355
15 May 1963
Details and sections of additional reinforced steel at lines 4w and 5w
Actions:
AR1996:1001:355
drawings
15 May 1963
drawings
AR1996:1001:356
15 July 1963
Details and sections of reinforing wall between line 1 and north wall
Actions:
AR1996:1001:356
drawings
15 July 1963