drawings
Quantity:
8 File
ARCH33765
drawings
Quantity:
8 File
drawings
Quantity:
10 File
ARCH39106
drawings
Quantity:
10 File
drawings
Quantity:
10 File
ARCH40355
drawings
Quantity:
10 File
drawings
Quantity:
8 File
ARCH42516
drawings
Quantity:
8 File
drawings
Quantity:
8 File
ARCH42548
drawings
Quantity:
8 File
drawings
Quantity:
9 File
ARCH43441
drawings
Quantity:
9 File
drawings
Quantity:
8 File
ARCH45193
drawings
Quantity:
8 File
Project
AP018.S1.1984.PR03
Description:
This project series document the exterior restauration work of Toronto Union Station in Toronto from 1984-1985. The office identified the project number as 8405. This project consisted of restoration to the exterior of the train station commissioned by VIA Rail Canada Inc. This work was referred to as a clean up in the project documentation. Restauration work was done to the existing exterior stonework, colannades, screens and skylights. This project was referred to as Package A in the materials, with Package B representing a project for interior work (see project series AP018.S1.1984.PR01 in this fonds). This project is recorded through drawings, photographs and textual records dating from 1984-1985. The drawings are of earlier plans for the station, prepared by architects Ross & Macdonald and some by Public Works Canada. The textual records include correspondence, conference and site reports, contract data, construction documentation, financial records, interoffice letters.
1984-1985
Toronto Union Station, Exterior Cleaning of Facades and Colonnades, Toronto (1984-1985)
Actions:
AP018.S1.1984.PR03
Description:
This project series document the exterior restauration work of Toronto Union Station in Toronto from 1984-1985. The office identified the project number as 8405. This project consisted of restoration to the exterior of the train station commissioned by VIA Rail Canada Inc. This work was referred to as a clean up in the project documentation. Restauration work was done to the existing exterior stonework, colannades, screens and skylights. This project was referred to as Package A in the materials, with Package B representing a project for interior work (see project series AP018.S1.1984.PR01 in this fonds). This project is recorded through drawings, photographs and textual records dating from 1984-1985. The drawings are of earlier plans for the station, prepared by architects Ross & Macdonald and some by Public Works Canada. The textual records include correspondence, conference and site reports, contract data, construction documentation, financial records, interoffice letters.
Project
1984-1985
drawings
Quantity:
5 File
Hangars H-13 and H-14
ARCH45150
Description:
revised sections for hangars H-13 and H-14, door pocket for hangars H-13 and H-14, section through ceiling of steam room
Hangars H-13 and H-14
Actions:
ARCH45150
Description:
revised sections for hangars H-13 and H-14, door pocket for hangars H-13 and H-14, section through ceiling of steam room
drawings
Quantity:
5 File
drawings
Quantity:
7 File
ARCH49145
Description:
floor plans and layouts, new screens, typical floor plan and electrical plan of Victoria-Square Building by Charles Grenier (Montreal), architect, 1957
Floor plans and layouts, new screens, typical floor plan and electrical plan of Victoria-Square Building
Actions:
ARCH49145
Description:
floor plans and layouts, new screens, typical floor plan and electrical plan of Victoria-Square Building by Charles Grenier (Montreal), architect, 1957
drawings
Quantity:
7 File