AP140.S2.SS7.D3.P4.4
Description:
Reel N 4: dailies for the film 'Stirling', comprising of film and magnetic sound track. Inscription on leader: Blackwood Clore model, construction.
n.d.
16mm film reel related to the film Stirling
Actions:
AP140.S2.SS7.D3.P4.4
Description:
Reel N 4: dailies for the film 'Stirling', comprising of film and magnetic sound track. Inscription on leader: Blackwood Clore model, construction.
n.d.
photographs
AP140.S2.SS1.D21.P4
Description:
views of the building site, of the exterior and interior of the completed assembly hall, and of a no longer extant model for a first scheme
1958 or after and 5 October 1962
Views of the building site, of the exterior and interior of the completed assembly hall
Actions:
AP140.S2.SS1.D21.P4
Description:
views of the building site, of the exterior and interior of the completed assembly hall, and of a no longer extant model for a first scheme
photographs
1958 or after and 5 October 1962
photographs
AP140.S2.SS1.D21.P5
Description:
views of the building site, of the exterior and interior of the completed assembly hall, and of a no longer extant model for a first scheme
1958 or after
Views of the building site, of the exterior and interior of the completed assembly hall
Actions:
AP140.S2.SS1.D21.P5
Description:
views of the building site, of the exterior and interior of the completed assembly hall, and of a no longer extant model for a first scheme
photographs
1958 or after
photographs
AP140.S2.SS1.D21.P9
Description:
views of the building site, of the exterior and interior of the completed assembly hall, and of a no longer extant model for a first scheme
1958 or after
Views of the building site, of the exterior and interior of the completed assembly hall
Actions:
AP140.S2.SS1.D21.P9
Description:
views of the building site, of the exterior and interior of the completed assembly hall, and of a no longer extant model for a first scheme
photographs
1958 or after
drawings
Quantity:
12 File
ARCH257511
Description:
floor plans, reflected ceiling plan, site plan of phasing, sections, model photographs, entry level plan, elevations, axonometric facade study
1984
Floor plans, reflected ceiling plan, site plan of phasing
Actions:
ARCH257511
Description:
floor plans, reflected ceiling plan, site plan of phasing, sections, model photographs, entry level plan, elevations, axonometric facade study
drawings
Quantity:
12 File
1984
photographs
Quantity:
20 photograph(s)
ARCH267297
Description:
This group consists of aerial views of Verdun and photographs taken on Île-des-Sœurs before construction for the development of Île St-Paul (present-day Île-des-Soeurs) in Verdun, Québec.There is also a photograph of a model for a sports center for the City of Verdun and a photograph of the model for Île-des-Sœurs by Victor Prus.
Aerial views of Verdun and photographs taken on Île-des-Sœurs before construction for the development of Île St-Paul
Actions:
ARCH267297
Description:
This group consists of aerial views of Verdun and photographs taken on Île-des-Sœurs before construction for the development of Île St-Paul (present-day Île-des-Soeurs) in Verdun, Québec.There is also a photograph of a model for a sports center for the City of Verdun and a photograph of the model for Île-des-Sœurs by Victor Prus.
photographs
Quantity:
20 photograph(s)
Project
CI005.S1.1951.PR2
Description:
Oud was one of a number of architects invited to enter the competition for the new offices of the Province of South Holland, a complex due to replace the bombed headquarters on Korte Voorhout. The design for the new site – located on the grounds of a former zoo – was required to conform to the reconstruction plan of the architect-town planner, W.M. Dudok. Oud designed a four-storey building that conformed to building requirement and located the buildings at the southwest corner of the site to accommodate the existing zoo. The governor's residence was also designed, and another two office wings were placed at right angles to the main concentration of buildings. Ultimately, to Oud's great disappointment, the jury selected a design by Peutz for its complex (Taverne et al. 2001, 453-456). Project series includes photographs of perspective drawings and of a model.
1951-1952
Competition for Zuid-Holland Provinciehuis (South Holland Local Government Headquarters), The Hague, Netherlands (1951-1952)
Actions:
CI005.S1.1951.PR2
Description:
Oud was one of a number of architects invited to enter the competition for the new offices of the Province of South Holland, a complex due to replace the bombed headquarters on Korte Voorhout. The design for the new site – located on the grounds of a former zoo – was required to conform to the reconstruction plan of the architect-town planner, W.M. Dudok. Oud designed a four-storey building that conformed to building requirement and located the buildings at the southwest corner of the site to accommodate the existing zoo. The governor's residence was also designed, and another two office wings were placed at right angles to the main concentration of buildings. Ultimately, to Oud's great disappointment, the jury selected a design by Peutz for its complex (Taverne et al. 2001, 453-456). Project series includes photographs of perspective drawings and of a model.
project
1951-1952
Project
AP178.S1.1971.PR01
Description:
This project series documents the Banco Pinto & Sotto Mayor in Oliveira de Azeméis, Portugal. While the records were held in the office’s archives this project was assigned the number 5/70. In the past the office identified the project as number 130. The office assigned the date 1971-1974 for this project. This project was a three storey bank on the corner of the main square of Oliveira de Azeméis. The building was surrounded by a courthouse and a 17th century home. It included a reception office, strong-room, changing rooms, and sanitary installations. The building was built in concrete between the years 1971 and 1974. The project series contains sketches and studies, as well as working drawings and floor plans. Textual materials include project documentation and correspondence. The photographs and slides primarily document the model and built project.
1971-1974
Banco Pinto & Sotto Mayor [Pinto & Sotto Mayor bank], Oliveira de Azeméis, Portugal (1971-1974)
Actions:
AP178.S1.1971.PR01
Description:
This project series documents the Banco Pinto & Sotto Mayor in Oliveira de Azeméis, Portugal. While the records were held in the office’s archives this project was assigned the number 5/70. In the past the office identified the project as number 130. The office assigned the date 1971-1974 for this project. This project was a three storey bank on the corner of the main square of Oliveira de Azeméis. The building was surrounded by a courthouse and a 17th century home. It included a reception office, strong-room, changing rooms, and sanitary installations. The building was built in concrete between the years 1971 and 1974. The project series contains sketches and studies, as well as working drawings and floor plans. Textual materials include project documentation and correspondence. The photographs and slides primarily document the model and built project.
Project
1971-1974
Project
AP178.S1.1959.PR01
Description:
This project series documents the design proposal for Monumento aos Calafates in Foz Douro, Porto, Portugal. While the records were held in the office’s archives this project was assigned the number 11/50. The office assigned the date 1959 to this project. Siza, Alcino Soutinho, Augusto Amaral, and the sculptor Lagoa Henriques developed this project for an open competition for the Delegação do Porto da Comissão das Comemorações do V Centenário do Infante D. Henrique in colaboration with the Escola de Belas Artes do Porto. The project was exhibited at the I Exposição Extra-escolar dos Alunos da ESBAP in 1959. The project won first prize but was not built. Documenting this project are a small number of sketches. Also included are photographic materials of the model and project site as well as a slide of a drawing.
1959
Monumento aos Calafates [Caulkers Monument], Foz do Douro, Porto, Portugal (1959)
Actions:
AP178.S1.1959.PR01
Description:
This project series documents the design proposal for Monumento aos Calafates in Foz Douro, Porto, Portugal. While the records were held in the office’s archives this project was assigned the number 11/50. The office assigned the date 1959 to this project. Siza, Alcino Soutinho, Augusto Amaral, and the sculptor Lagoa Henriques developed this project for an open competition for the Delegação do Porto da Comissão das Comemorações do V Centenário do Infante D. Henrique in colaboration with the Escola de Belas Artes do Porto. The project was exhibited at the I Exposição Extra-escolar dos Alunos da ESBAP in 1959. The project won first prize but was not built. Documenting this project are a small number of sketches. Also included are photographic materials of the model and project site as well as a slide of a drawing.
Project
1959
Sub-series
AP140.S2.SS1.D60.SD2
Description:
Sub-file documents unexecuted projects for the Tate Gallery New Museums, in London, England. These additions to the Tate Gallery (now Tate Britain) were planned in several phases, to be constructed as funding was made available. The proposals included the Museum of Modern Sculpture, the Museum of New Art and a Study Centre to be erected on the Queen Alexandra Military Hospital site, situated to the east of the main Tate Gallery building. A Children's Museum was also planned. The New Museums projects were called off in 1987. Material in this Sub-file was produced between 1979 and 1988. Sub-file contains measured and reference drawings, several conceptual and design development drawings as well as presentation drawings. Photographic materials include views of drawings and of a presentation model by Kandor Modelmakers. Sub-file also contains textual records.
1979-1988, predominant 1983-1988
Tate Gallery New Museums, London, England, United Kingdom
Actions:
AP140.S2.SS1.D60.SD2
Description:
Sub-file documents unexecuted projects for the Tate Gallery New Museums, in London, England. These additions to the Tate Gallery (now Tate Britain) were planned in several phases, to be constructed as funding was made available. The proposals included the Museum of Modern Sculpture, the Museum of New Art and a Study Centre to be erected on the Queen Alexandra Military Hospital site, situated to the east of the main Tate Gallery building. A Children's Museum was also planned. The New Museums projects were called off in 1987. Material in this Sub-file was produced between 1979 and 1988. Sub-file contains measured and reference drawings, several conceptual and design development drawings as well as presentation drawings. Photographic materials include views of drawings and of a presentation model by Kandor Modelmakers. Sub-file also contains textual records.
Sub-File 2
1979-1988, predominant 1983-1988