Project
AP022.S1.1988.PR07
Description:
File documents a 178,222 square-foot business school building comprised of administration offices, classrooms and lecture halls, consttructed (1990), University of Arizona, Tuscon, Arizona. File contains slides and design development drawings.
1988-1989
Business School, University of Arizona
Actions:
AP022.S1.1988.PR07
Description:
File documents a 178,222 square-foot business school building comprised of administration offices, classrooms and lecture halls, consttructed (1990), University of Arizona, Tuscon, Arizona. File contains slides and design development drawings.
Project
1988-1989
photographs
PH1986:0109:001-021
Description:
Photographic album comprising of 21 interior and exterior views of the classrooms and buildings of the Ecole Centrale des arts et manufactures in Paris, France.
1875
Views of École Centrale des Arts et Manufactures, Paris, France
Actions:
PH1986:0109:001-021
Description:
Photographic album comprising of 21 interior and exterior views of the classrooms and buildings of the Ecole Centrale des arts et manufactures in Paris, France.
photographs
1875
Project
AP022.S1.1972.PR05
Description:
File documents the conversion of former university dormitories to offices and classrooms (built), University of British Columbia, Vancouver, British Columbia. File contains design development drawings, working drawings, shop drawings, textual records (includes photographs).
1972-1978
Anthropology & Sociology Department Building
Actions:
AP022.S1.1972.PR05
Description:
File documents the conversion of former university dormitories to offices and classrooms (built), University of British Columbia, Vancouver, British Columbia. File contains design development drawings, working drawings, shop drawings, textual records (includes photographs).
Project
1972-1978
Realism and Illusion: Catherine Wagner Photographs the Disney Theme Parks presents a visual essay of the Disney theme parks in Anaheim, Orlando, Tokyo, and Paris. Fascinated by the importance of illusion in the design and layout of the parks, Wagner aspired “to add yet another layer of deception to this already simulated world, our world, where illusion is now more real(...)
Octagonal gallery
17 June 1997 to 28 September 1997
Realism and Illusion: Catherine Wagner Photographs the Disney Theme Parks
Actions:
Description:
Realism and Illusion: Catherine Wagner Photographs the Disney Theme Parks presents a visual essay of the Disney theme parks in Anaheim, Orlando, Tokyo, and Paris. Fascinated by the importance of illusion in the design and layout of the parks, Wagner aspired “to add yet another layer of deception to this already simulated world, our world, where illusion is now more real(...)
Octagonal gallery
Project
Museum of Glass
AP022.S1.1997.PR04
Description:
File documents a museum that contains glass workshops including a public amphitheatre, an artist studio, exhibition spaces, a permanent collection display area, a museum shop, café, library, theatre, and classrooms. The museum was constructed from 2000-2002, Tacoma, Washington State. File contains design development drawings, photographic material and textual records.
1997-2002
Museum of Glass
Actions:
AP022.S1.1997.PR04
Description:
File documents a museum that contains glass workshops including a public amphitheatre, an artist studio, exhibition spaces, a permanent collection display area, a museum shop, café, library, theatre, and classrooms. The museum was constructed from 2000-2002, Tacoma, Washington State. File contains design development drawings, photographic material and textual records.
Project
1997-2002
Project
CI005.S1.1949.PR2
Description:
Oud was commissioned to design the Tweede Vrijzinnig Christelijk Lyceum. Oud designed the school within the larger parameters of the Reconstruction Plan for Sportlaan; he presented his design to the board in 1950. Oud's design aligned with reconstruction plans, except that he designed a four- rather than a three-storey building. Oud's layout featured three blocks: one for classrooms and an auditorium, another for classrooms, and the last one for a gymnasium – this building connected to the main wing by circular stairs. Each of the three separate blocks was surrounded by a playground. The street side facades were closed in contrast to the open facades facing the playground. Oud's design also featured visual art and sculptures (Taverne et al. 2001, 533-535). Project series includes plans and photographs of facades and aerial views. , 12 drawings 11 photographs
1949-1956
Tweede Vrijzinnig Christselijk Lyceum (Second Liberal Christian Lyceum), The Hague, Netherlands (1949-1956)
Actions:
CI005.S1.1949.PR2
Description:
Oud was commissioned to design the Tweede Vrijzinnig Christelijk Lyceum. Oud designed the school within the larger parameters of the Reconstruction Plan for Sportlaan; he presented his design to the board in 1950. Oud's design aligned with reconstruction plans, except that he designed a four- rather than a three-storey building. Oud's layout featured three blocks: one for classrooms and an auditorium, another for classrooms, and the last one for a gymnasium – this building connected to the main wing by circular stairs. Each of the three separate blocks was surrounded by a playground. The street side facades were closed in contrast to the open facades facing the playground. Oud's design also featured visual art and sculptures (Taverne et al. 2001, 533-535). Project series includes plans and photographs of facades and aerial views. , 12 drawings 11 photographs
project
1949-1956
Project
Normanseal
AP144.S2.D50
Description:
File documents an unexecuted extension for Normansal School, in Seaford, East Sussex, England, United Kingdom. The extension was to be done in several phases and called for 2 new classrooms, additional private sleeping accommodations and a new design for the school kitchen. Material in this file was produced between 1963 and 1964. File contains design development drawings, presentation drawings, and textual records.
1963-1964
Normanseal
Actions:
AP144.S2.D50
Description:
File documents an unexecuted extension for Normansal School, in Seaford, East Sussex, England, United Kingdom. The extension was to be done in several phases and called for 2 new classrooms, additional private sleeping accommodations and a new design for the school kitchen. Material in this file was produced between 1963 and 1964. File contains design development drawings, presentation drawings, and textual records.
File 50
1963-1964
textual records
ARCH270761
Description:
Contains a budget/estimate for the Faculty of Education Sciences, a few sketches, a photomontage and a project description of classrooms? and service building on the campus Gipuzkoa of the Universidad de País Vasco by the architect José Manuel Abalos.
ca. 1996
A budget/estimate for the Faculty of Education Sciences
Actions:
ARCH270761
Description:
Contains a budget/estimate for the Faculty of Education Sciences, a few sketches, a photomontage and a project description of classrooms? and service building on the campus Gipuzkoa of the Universidad de País Vasco by the architect José Manuel Abalos.
textual records
ca. 1996
Project
AP206.S1.1996.PR02
Description:
This project series documents an extension to a public school in sector 7B in Chandigarh in 1996. The project consisted of a rectangular extension that held classrooms and was connected to the existing building through a square lobby. Above the ground floor, the lobby volume acted as a covered passageway to move between buildings. It is not evident whether this extension was ever built. The project is recorded through plans, elevations and sections dating from 1996.
1996
DAV public school, Chandigarh, India (1996)
Actions:
AP206.S1.1996.PR02
Description:
This project series documents an extension to a public school in sector 7B in Chandigarh in 1996. The project consisted of a rectangular extension that held classrooms and was connected to the existing building through a square lobby. Above the ground floor, the lobby volume acted as a covered passageway to move between buildings. It is not evident whether this extension was ever built. The project is recorded through plans, elevations and sections dating from 1996.
Project
1996
drawings
Quantity:
14 File
Business men's club existing conditions and layout, existing conditions of boy's and girls lockers
ARCH43409
Description:
business men's club existing conditions and layout, existing conditions of boy's and girls lockers, changes to locker rooms, existing conditions and proposed changes to main lobby and concession and toilet area, lecture hall, library and library storage, changes to classrooms
Business men's club existing conditions and layout, existing conditions of boy's and girls lockers
Actions:
ARCH43409
Description:
business men's club existing conditions and layout, existing conditions of boy's and girls lockers, changes to locker rooms, existing conditions and proposed changes to main lobby and concession and toilet area, lecture hall, library and library storage, changes to classrooms
drawings
Quantity:
14 File