drawings
Quantity:
3 File
ARCH21389
drawings
Quantity:
3 File
drawings
Quantity:
8 File
ARCH22766
Plans for steel frame by Purdy & Henderson (Montreal) Consulting Engineers
Actions:
ARCH22766
drawings
Quantity:
8 File
photographs
Quantity:
106 slide(s)
photographs
Quantity:
106 slide(s)
PH1983:0559
1959
drawings
AP046.S1.1983.PR02.004
Description:
This file includes elevations of level crossing gates for railway.
1983-1992
Sketches for level crossings in Esplanade de la Commune park, Old Port of Montreal Master Plan, Montréal, Québec
Actions:
AP046.S1.1983.PR02.004
Description:
This file includes elevations of level crossing gates for railway.
drawings
1983-1992
drawings
AP046.S1.1983.PR02.055
Description:
This file includes a sketch for Square Jacques Cartier façade and layout.
1983-1992
Sketch for Square Jacques Cartier at Esplanade de la Commune, Old Port of Montreal Master Plan, Montréal, Québec
Actions:
AP046.S1.1983.PR02.055
Description:
This file includes a sketch for Square Jacques Cartier façade and layout.
drawings
1983-1992
drawings
AP046.S1.1983.PR02.087
Description:
This file includes drawings in perspective for landscaping of pedestrian areas of Esplanade de la Commune.
1983-1992
Presentation drawings for pedestrian areas of Esplanade de la Commune, Old Port of Montreal Master Plan, Montréal, Québec
Actions:
AP046.S1.1983.PR02.087
Description:
This file includes drawings in perspective for landscaping of pedestrian areas of Esplanade de la Commune.
drawings
1983-1992
drawings
AP046.S1.1983.PR01.261
Description:
This file includes drawings list, and plans for CCA library and stair hall.
1988
Phase 4 drawings issued for construction, Canadian Centre for Architecture, Montreal, Quebec
Actions:
AP046.S1.1983.PR01.261
Description:
This file includes drawings list, and plans for CCA library and stair hall.
drawings
1988
Project
AP018.S1.1977.PR08
Description:
This project series documents the design and construction of the Bank of Montreal Central Computer Complex Two in Scarborough, Ontario from 1977-1982. The office identified the project number as 7709. The Central Computer Complex Two was built to be used by the Bank of Montreal as a data processing centre with offices for staff on site. The complex consisted of three octagonal buildings joined by tunnels and skywalks. The first building, Central Computer Complex Two (CCC2), was a three-storey data processing equipment building. The second building, Central Facilities Building (CUB), was a three-storey building devoted to shipping and receiving and employee spaces such as a library, exercise room, cafeteria and lounge, and a medical exam area. The third building, Staff Support Offices, was a four-storey building that contained employee offices. In addition, each building had a penthouse that contained mechanical and electrical equipment. A large part of the project was administered through John C. Parkin’s engineering firm, Parkin Engineers limited, with Paul Keenan acting as president. The project is recorded through drawings, photographs, presentation boards and textual records dating from 1977-1982. The majority of reprographic copies are drawings used in the construction phase of the project. The photographs show the construction of the building. The textual records include design planning notes, client and contractor correspondence, site reports, change orders, supplementary instructions, specifications, detail drawings, meeting minutes, schedules, and invoices for work completed. Box AP018.S1.1977.PR08.074 contains an index to the textual records, which was created by the office.
1977-1982
Bank of Montreal Central Computer Complex Two, Scarborough, Ontario (1977-1982)
Actions:
AP018.S1.1977.PR08
Description:
This project series documents the design and construction of the Bank of Montreal Central Computer Complex Two in Scarborough, Ontario from 1977-1982. The office identified the project number as 7709. The Central Computer Complex Two was built to be used by the Bank of Montreal as a data processing centre with offices for staff on site. The complex consisted of three octagonal buildings joined by tunnels and skywalks. The first building, Central Computer Complex Two (CCC2), was a three-storey data processing equipment building. The second building, Central Facilities Building (CUB), was a three-storey building devoted to shipping and receiving and employee spaces such as a library, exercise room, cafeteria and lounge, and a medical exam area. The third building, Staff Support Offices, was a four-storey building that contained employee offices. In addition, each building had a penthouse that contained mechanical and electrical equipment. A large part of the project was administered through John C. Parkin’s engineering firm, Parkin Engineers limited, with Paul Keenan acting as president. The project is recorded through drawings, photographs, presentation boards and textual records dating from 1977-1982. The majority of reprographic copies are drawings used in the construction phase of the project. The photographs show the construction of the building. The textual records include design planning notes, client and contractor correspondence, site reports, change orders, supplementary instructions, specifications, detail drawings, meeting minutes, schedules, and invoices for work completed. Box AP018.S1.1977.PR08.074 contains an index to the textual records, which was created by the office.
Project
1977-1982
drawings
Quantity:
12 design development drawing(s)
ARCH253077
Description:
site plans, street plans, street section and profiles (Ville de Montreal; Dancoe, Smith, Alarie, land surveyors "Express Way Site")
Site plans, street plans, street section and profiles (Ville de Montreal; Dancoe
Actions:
ARCH253077
Description:
site plans, street plans, street section and profiles (Ville de Montreal; Dancoe, Smith, Alarie, land surveyors "Express Way Site")
drawings
Quantity:
12 design development drawing(s)