Project
Westpen
AP144.S2.D101
Description:
File documents an unexecuted project for Westpen, an animal enclosure for the property at West Green House at Hartley Wintney, in Hampshire, England, and also the location for the project Greenbird (AP144.S2.D96). The pen can be adapted for several uses and its pivoting and sliding gates can be removed when not used for livestock, to be converted into a sculptured landscape for picnicking and leisure activities. Conceptual drawings include diagrammatic sketches which show the movement of animals through the pen for collecting, weighing, cleaning, and shearing. Sketches show pivoting rails, and preliminary plans are annotated with individual gate dimensions. Design development and working drawings illustrate the development of the pen components: 8 ft swing slide and cattle gates; 3 ft sheep gates; a sheep dip and footbath area; a sheep drafting and guillotine gate; and feed bins. Plans and details show the concrete apron and pre-formed gate sockets. Reprographic copies made from a consultant's drawings show the configuration of gates and hurdles. Some material in this file was published in Price-Works II' (London: Architectural Press, 1984), 72, 79. Material in this file was produced between 1977 and 1979. File contains conceptual drawings, design development drawings, model, photographic materials and textual records.
1977-1979
Westpen
Actions:
AP144.S2.D101
Description:
File documents an unexecuted project for Westpen, an animal enclosure for the property at West Green House at Hartley Wintney, in Hampshire, England, and also the location for the project Greenbird (AP144.S2.D96). The pen can be adapted for several uses and its pivoting and sliding gates can be removed when not used for livestock, to be converted into a sculptured landscape for picnicking and leisure activities. Conceptual drawings include diagrammatic sketches which show the movement of animals through the pen for collecting, weighing, cleaning, and shearing. Sketches show pivoting rails, and preliminary plans are annotated with individual gate dimensions. Design development and working drawings illustrate the development of the pen components: 8 ft swing slide and cattle gates; 3 ft sheep gates; a sheep dip and footbath area; a sheep drafting and guillotine gate; and feed bins. Plans and details show the concrete apron and pre-formed gate sockets. Reprographic copies made from a consultant's drawings show the configuration of gates and hurdles. Some material in this file was published in Price-Works II' (London: Architectural Press, 1984), 72, 79. Material in this file was produced between 1977 and 1979. File contains conceptual drawings, design development drawings, model, photographic materials and textual records.
File 101
1977-1979
Project
AP056.S1.1989.PR07
Description:
This project series documents the interiors of the Creeds store in Toronto from 1989-1990. The office identified the project number as 8926. This project consisted of renovations to the interiors of the high-end retail store located in Toronto's Manulife Centre at the corner of Bloor and Bay Streets. The store, with entrances from the mall and street, included several smaller boutiques divided by designer, a large fur storage area and work room, a fur salon, a stock room and changing rooms. A major part of this renovation was the creation of a multifunctional court space connected to the rest of the linear boutiquerie via two small staircases. This court could be used for fashion shows, presentations, season displays, and social events. The court had a circular ceiling light fixture, stone-clad piers, stained cherry wood panels and sandblasted steel details. The floors, patterned with black slate and granite, were complimentary to the boutique's concrete and black and silver glass tile floors. Also central to this project was the creation of the Christian Dior boutique at the street entrance. The project is recorded through drawings and photographs dating from 1989-1990. The drawings, mostly originals, consist of sketches, axonometric drawings, sections, plans, elevations, details and schedules. The photographs show the completed store interiors.
1989-1990
Creeds Store, Toronto (1989-1990)
Actions:
AP056.S1.1989.PR07
Description:
This project series documents the interiors of the Creeds store in Toronto from 1989-1990. The office identified the project number as 8926. This project consisted of renovations to the interiors of the high-end retail store located in Toronto's Manulife Centre at the corner of Bloor and Bay Streets. The store, with entrances from the mall and street, included several smaller boutiques divided by designer, a large fur storage area and work room, a fur salon, a stock room and changing rooms. A major part of this renovation was the creation of a multifunctional court space connected to the rest of the linear boutiquerie via two small staircases. This court could be used for fashion shows, presentations, season displays, and social events. The court had a circular ceiling light fixture, stone-clad piers, stained cherry wood panels and sandblasted steel details. The floors, patterned with black slate and granite, were complimentary to the boutique's concrete and black and silver glass tile floors. Also central to this project was the creation of the Christian Dior boutique at the street entrance. The project is recorded through drawings and photographs dating from 1989-1990. The drawings, mostly originals, consist of sketches, axonometric drawings, sections, plans, elevations, details and schedules. The photographs show the completed store interiors.
Project
1989-1990
Project
AP164.S1.2002.D11
Description:
The project series documents the public commission for a project of the hotel, clubhouse and golf course ''El Toyo'', in Almería, Spain. The promoter was Alboran Golf U.T.E. The firm identified this project as number 155. The hotel has 90 double rooms including 3 suites, storage room, and a technical space underground. The roof was designed as an ecological green space, including a running path and the club house was arranged as a pavillion. "Making use of the differences in height created by the terraces proposed for the hotels Gran Terrace with the swimming pool, the Club-House will appear as a fold in the terrain, practically a topographic accident since it will be constructed by inclined concrete slabs which generate the interior space. The roof is accessible turning itself into a viewing platform for the whole complex, a strategy which gives the club a strong landscaping character.” (ARCH270975) Abalos & Herreros worked with José Maria Ezquiaga, Ángel Jaramillo Esteban, Elena Jaramillo Sánchez, Ángel Jaramillo Sánchez, Ramón Espinosa Garcia-Bermúdez, Leopoldo Espinosa Herraiz and OMA, Agustí Obiol y Luis Moya. The team won first prize for their project. It was not built, but was approved. Documenting the project are design development, presentation and working drawings, digital and reference materials, minutes, clippings, resumes, presentation documents, and project descriptions.
2000-2005
Hotel Toyo, Almería, Spain (2002)
Actions:
AP164.S1.2002.D11
Description:
The project series documents the public commission for a project of the hotel, clubhouse and golf course ''El Toyo'', in Almería, Spain. The promoter was Alboran Golf U.T.E. The firm identified this project as number 155. The hotel has 90 double rooms including 3 suites, storage room, and a technical space underground. The roof was designed as an ecological green space, including a running path and the club house was arranged as a pavillion. "Making use of the differences in height created by the terraces proposed for the hotels Gran Terrace with the swimming pool, the Club-House will appear as a fold in the terrain, practically a topographic accident since it will be constructed by inclined concrete slabs which generate the interior space. The roof is accessible turning itself into a viewing platform for the whole complex, a strategy which gives the club a strong landscaping character.” (ARCH270975) Abalos & Herreros worked with José Maria Ezquiaga, Ángel Jaramillo Esteban, Elena Jaramillo Sánchez, Ángel Jaramillo Sánchez, Ramón Espinosa Garcia-Bermúdez, Leopoldo Espinosa Herraiz and OMA, Agustí Obiol y Luis Moya. The team won first prize for their project. It was not built, but was approved. Documenting the project are design development, presentation and working drawings, digital and reference materials, minutes, clippings, resumes, presentation documents, and project descriptions.
Project
2000-2005
Project
AP056.S1.1993.PR07
Description:
This project series documents a new building for the Fields Institute of Research in Mathematical Sciences at the University of Toronto from 1993-1995. The office identified the project number as 9318. This project consisted of a four-storey building, characterized by a rusticated limestone and red-brick exterior, located at 222 College Street. The building's layout consisted of offices, conference rooms, classrooms, resource centres, computer training facilities, a library, and the main lobby and reception. At the core was a grand atrium with a wood-lined helical staircase that ran the height of the building, a stucco fireplace and an elliptical reception desk. Designed to encourage spontaneous thought and interaction, the institute featured slate chalkboards throughout. The roof was comprised of a Douglas fir deck on metal trusses, while the interior finishes included tiles, carpet, wood, metal, stone and concrete.[1] The project is recorded through drawings, photographic materials, a presentation painting and textual records dating from 1993-1996. The drawings are mostly originals and include sketches, presentation drawings, plans, elevations, sections, details, perspectives and axonometric drawings. The photographic materials include images for presentation and research, while the textual records document completion schedules. [1] "Fields Institute Facilities." The Fields Institute for Research in Mathematical Sciences. Accessed April 29, 2019. http://www.fields.utoronto.ca/resources/fields-institute-facilities
1993-1996
The Fields Institute for Research in Mathematical Sciences, University of Toronto (1993-1995)
Actions:
AP056.S1.1993.PR07
Description:
This project series documents a new building for the Fields Institute of Research in Mathematical Sciences at the University of Toronto from 1993-1995. The office identified the project number as 9318. This project consisted of a four-storey building, characterized by a rusticated limestone and red-brick exterior, located at 222 College Street. The building's layout consisted of offices, conference rooms, classrooms, resource centres, computer training facilities, a library, and the main lobby and reception. At the core was a grand atrium with a wood-lined helical staircase that ran the height of the building, a stucco fireplace and an elliptical reception desk. Designed to encourage spontaneous thought and interaction, the institute featured slate chalkboards throughout. The roof was comprised of a Douglas fir deck on metal trusses, while the interior finishes included tiles, carpet, wood, metal, stone and concrete.[1] The project is recorded through drawings, photographic materials, a presentation painting and textual records dating from 1993-1996. The drawings are mostly originals and include sketches, presentation drawings, plans, elevations, sections, details, perspectives and axonometric drawings. The photographic materials include images for presentation and research, while the textual records document completion schedules. [1] "Fields Institute Facilities." The Fields Institute for Research in Mathematical Sciences. Accessed April 29, 2019. http://www.fields.utoronto.ca/resources/fields-institute-facilities
Project
1993-1996
Sub-series
AP178.S1.1988.PR07.SS4
Description:
This project series documents the restoration of the Castro & Melo building in Lisbon, Portugal. While the records were held in the office’s archives this project was assigned the number 58/80 N 8/9. The office assigned the date 1988-1998 for this project. The Edificio Castro e Melo was part of Bloco A and identified as building 8/9 in the reconstruction plan of Siza. The structure of the building, originally built in the18th century in order to resist earthquakes, was rebuilt in concrete. Archival research was done in order to reproduce as much as possible the original style of the building. The interior of the building was reorganized to introduce dwellings. The first and second floors were kept as they were originally for stores and storerooms. The third and fourth floors were built for offices. The fifth, sixth and seventh floors were rearranged to introduce apartments to the building. The eighth floor was used for the technical equipment of the building. In 1996, Siza received the Secil prize for this building. Drawings include studies, working drawings, mechanical drawings, and details of finishes. Textual material includes project documentation, studies, and correspondence. Photographic material include images of studies, details of the interior and exterior, as well as construction work. It is important to mention that documentation can also be found in subseries Master plans and exterior spaces (AP178.S1.1988.PR07.SS1) and Bloco A (AP178.S1.1988.PR07.SS2).
1988-1998
Edifício Castro e Melo, Bloco A, Reconstrução do Chiado [Castro & Melo building, Block A, Reconstruction of the Chiado] Lisbon, Portugal, 1988-1998
Actions:
AP178.S1.1988.PR07.SS4
Description:
This project series documents the restoration of the Castro & Melo building in Lisbon, Portugal. While the records were held in the office’s archives this project was assigned the number 58/80 N 8/9. The office assigned the date 1988-1998 for this project. The Edificio Castro e Melo was part of Bloco A and identified as building 8/9 in the reconstruction plan of Siza. The structure of the building, originally built in the18th century in order to resist earthquakes, was rebuilt in concrete. Archival research was done in order to reproduce as much as possible the original style of the building. The interior of the building was reorganized to introduce dwellings. The first and second floors were kept as they were originally for stores and storerooms. The third and fourth floors were built for offices. The fifth, sixth and seventh floors were rearranged to introduce apartments to the building. The eighth floor was used for the technical equipment of the building. In 1996, Siza received the Secil prize for this building. Drawings include studies, working drawings, mechanical drawings, and details of finishes. Textual material includes project documentation, studies, and correspondence. Photographic material include images of studies, details of the interior and exterior, as well as construction work. It is important to mention that documentation can also be found in subseries Master plans and exterior spaces (AP178.S1.1988.PR07.SS1) and Bloco A (AP178.S1.1988.PR07.SS2).
Project
1988-1998
Project
AP056.S1.1988.PR08
Description:
This project series documents the Dome Productions offices and studio in Toronto from 1988-1989. The office identified the project number as 8804. This project consisted of a two-level office and studio area inside Toronto's SkyDome for the production company that was owned by The Sports Network (TSN). The main purpose of this space was to broadcast sports live from the stadium, but offices for producing, accounting, and marketing were also included. The two floors followed the curved shape of the stadium and were connected to one another by staircases. Visitors entered via large, glass doors into the reception area on the lower level, where they could move to the main lounge with its curved cappuccino bar, integrated into the main staircase. The lower level also held equipment rooms, fan rooms, editing areas, storage and offices. The upper level included two announcing booths, video editing suites, production spaces and conference rooms. The walls were composed of painted gypsum board but granite touches throughout stayed true to the concrete look of the stadium. Aluminum, steel, wood and sandblasted glass were also featured heavily throughout. The project is recorded through drawings and photographs dating from 1988-1989. The drawings are mostly originals and include sketches, presentation drawings, plans, details, elevations, sections, axonometric drawings, and structural drawings. The photographs show the finished interiors of the project.
1988-1989
Dome Productions Offices and Studios, Toronto (1988-1989)
Actions:
AP056.S1.1988.PR08
Description:
This project series documents the Dome Productions offices and studio in Toronto from 1988-1989. The office identified the project number as 8804. This project consisted of a two-level office and studio area inside Toronto's SkyDome for the production company that was owned by The Sports Network (TSN). The main purpose of this space was to broadcast sports live from the stadium, but offices for producing, accounting, and marketing were also included. The two floors followed the curved shape of the stadium and were connected to one another by staircases. Visitors entered via large, glass doors into the reception area on the lower level, where they could move to the main lounge with its curved cappuccino bar, integrated into the main staircase. The lower level also held equipment rooms, fan rooms, editing areas, storage and offices. The upper level included two announcing booths, video editing suites, production spaces and conference rooms. The walls were composed of painted gypsum board but granite touches throughout stayed true to the concrete look of the stadium. Aluminum, steel, wood and sandblasted glass were also featured heavily throughout. The project is recorded through drawings and photographs dating from 1988-1989. The drawings are mostly originals and include sketches, presentation drawings, plans, details, elevations, sections, axonometric drawings, and structural drawings. The photographs show the finished interiors of the project.
Project
1988-1989
ARCH256350
Description:
"Pavillon des Nations Unies à l'Expo 67 ......... Le drapeau des Nations Unies et ceux des 122 membres de l'organisation entourent le bâtiment circulaire construit en béton, en acier et en verre du pavillon des Nations-Unies. Un théâtre intérieur permet de voir des films sur les principaux problèmes du monde [d']aujourd'hui. / United Nations Pavilion at Expo 67 ...... Above the circular pavilion of the United Nations, built of concrete, steel and glass, the 122 flags of member nations gently swell in the breezes of the St. Lawrence River."--Description.
1967
View of the Pavilion on the United Nations, Expo 67, Montréal, Québec
Actions:
ARCH256350
Description:
"Pavillon des Nations Unies à l'Expo 67 ......... Le drapeau des Nations Unies et ceux des 122 membres de l'organisation entourent le bâtiment circulaire construit en béton, en acier et en verre du pavillon des Nations-Unies. Un théâtre intérieur permet de voir des films sur les principaux problèmes du monde [d']aujourd'hui. / United Nations Pavilion at Expo 67 ...... Above the circular pavilion of the United Nations, built of concrete, steel and glass, the 122 flags of member nations gently swell in the breezes of the St. Lawrence River."--Description.
textual records
DR2012:0012:102:031
Description:
File containing documents in English (predominant) and French, including correspondence, notes, drafts of contracts, and copies of the following reports: - Preliminary report for Schokbeton Quebec Inc. Application to the Department of Industry Program for the Advancement of Industrial Technology (1967, Melvin Charney and Janos Baracs); - The potential of precast concrete constructio in new school design (1967, Melvin Charney); - Les possibilites[sic] de la construction en beton[sic] prefabrique[sic] dans la conception nouvelle des ecoles[sic] (1967, Melvin Charney). Original folder inscribed in graphite: SCHOKBETON / PAIT 1967
1964-1970
Correspondence, notes, drafts of contracts, and reports related on construction technologies
Actions:
DR2012:0012:102:031
Description:
File containing documents in English (predominant) and French, including correspondence, notes, drafts of contracts, and copies of the following reports: - Preliminary report for Schokbeton Quebec Inc. Application to the Department of Industry Program for the Advancement of Industrial Technology (1967, Melvin Charney and Janos Baracs); - The potential of precast concrete constructio in new school design (1967, Melvin Charney); - Les possibilites[sic] de la construction en beton[sic] prefabrique[sic] dans la conception nouvelle des ecoles[sic] (1967, Melvin Charney). Original folder inscribed in graphite: SCHOKBETON / PAIT 1967
textual records
1964-1970
Project
AP018.S1.1958.PR03
Description:
This project series documents the design and construction of Toronto City Hall and Civic Square in Toronto from 1958-1965. The office identified the project number as 5867. The design of Toronto's New City Hall, built next to its older counterpart, was realized through an international architectural competition that attracted more than 500 entries from around the world. Eventually, a unanimous jury chose Finnish architect Viljo Revell's design, cementing the age of modernist architecture in Toronto. However, the rules stated that if the winning architect was not part of the Ontario Association of Architects, they were required to partner with a local firm. In this way, John B. Parkin Associates was chosen as the associate architects for this project. The design was comprised of a concrete dome house, which contained the city council chambers, surrounded by two curved office towers, all perched on top of a podium, with a public square to the south, known as Nathan Phillips Square. The buildings were 816,000 square feet in size, the west tower having 18 office floors and the east tower with 25. The project is recorded through drawings, a mounted presentation photograph of the project and textual records dating from 1958-1966. The drawings are mostly reprographic copies, which include plans, elevations, sections, details and perspectives. The textual records consist of a competition synopsis book, a book of submission materials for the competition, and correspondence between Parkin and Revell.
1958-1966
Toronto City Hall and Civic Square, Toronto (1958)
Actions:
AP018.S1.1958.PR03
Description:
This project series documents the design and construction of Toronto City Hall and Civic Square in Toronto from 1958-1965. The office identified the project number as 5867. The design of Toronto's New City Hall, built next to its older counterpart, was realized through an international architectural competition that attracted more than 500 entries from around the world. Eventually, a unanimous jury chose Finnish architect Viljo Revell's design, cementing the age of modernist architecture in Toronto. However, the rules stated that if the winning architect was not part of the Ontario Association of Architects, they were required to partner with a local firm. In this way, John B. Parkin Associates was chosen as the associate architects for this project. The design was comprised of a concrete dome house, which contained the city council chambers, surrounded by two curved office towers, all perched on top of a podium, with a public square to the south, known as Nathan Phillips Square. The buildings were 816,000 square feet in size, the west tower having 18 office floors and the east tower with 25. The project is recorded through drawings, a mounted presentation photograph of the project and textual records dating from 1958-1966. The drawings are mostly reprographic copies, which include plans, elevations, sections, details and perspectives. The textual records consist of a competition synopsis book, a book of submission materials for the competition, and correspondence between Parkin and Revell.
Project
1958-1966
drawings
Quantity:
7 drawing(s)
DR1995:0166:001-007
Description:
Presentation drawings for Oldham Pub, including plans, sections, elevations, details, measured sketches, and site plan. The project for Oldham Pub includes a public pub, bar-related facilities, and boarding facilities such as sitting rooms, bedrooms, and a common kitchen and dining area. Materials and construction details for the interior are indicated on a detailed plan and section of the cocktail bar. The exterior of the pub is shown to be constructed of brick with concrete banding. A long covered colonnade at the front provides a sheltered entrance. A housing complex, garden, shops, and parking, are adjacent to the pub.
Presentation drawings for Oldham Pub, including plans
Actions:
DR1995:0166:001-007
Description:
Presentation drawings for Oldham Pub, including plans, sections, elevations, details, measured sketches, and site plan. The project for Oldham Pub includes a public pub, bar-related facilities, and boarding facilities such as sitting rooms, bedrooms, and a common kitchen and dining area. Materials and construction details for the interior are indicated on a detailed plan and section of the cocktail bar. The exterior of the pub is shown to be constructed of brick with concrete banding. A long covered colonnade at the front provides a sheltered entrance. A housing complex, garden, shops, and parking, are adjacent to the pub.
drawings
Quantity:
7 drawing(s)