PH1980:0909:010
between 1865 and 1875
View of arches, door, and Arabic calligraphy facing south of the Court of the Myrtles, Alhambra, Granada, Spain
Actions:
PH1980:0909:010
Plan for a masonry impost for a door for the Tour de la Tempérance for Notre-Dame de Montréal
AR1996:1001:149
architecture
1826-1829
Plan for a masonry impost for a door for the Tour de la Tempérance for Notre-Dame de Montréal
Actions:
AR1996:1001:149
architecture
View of the Apostles' Door, Cathedral Vieja (also known as Seu Vella), Lerida, Catelonia, Spain
PH1986:0389:010
ca. 1871
View of the Apostles' Door, Cathedral Vieja (also known as Seu Vella), Lerida, Catelonia, Spain
Actions:
PH1986:0389:010
DR1974:0002:024:064-065
architecture
printed 1846 ?
Project for a Galerie de zoologie, 1846: Elevation for the vestibule door and elevation and plan for the vestibule windows
Actions:
DR1974:0002:024:064-065
architecture
photographs
Entrance door, outside, with teeth and half-eye, from the series The David and Gladys Wright House
PH2024:0010:013
2014 (printed 2024)
Entrance door, outside, with teeth and half-eye, from the series The David and Gladys Wright House
Actions:
PH2024:0010:013
photographs
2014 (printed 2024)
photographs
View of a column showing a dwarapala [door guardian], Meenakshi Temple, Madurai (now Madura), India
PH1980:0009:003
architecture, sculpture
between 1867 and 1869
View of a column showing a dwarapala [door guardian], Meenakshi Temple, Madurai (now Madura), India
Actions:
PH1980:0009:003
photographs
between 1867 and 1869
architecture, sculpture
drawings
DR1986:0767:304
architecture
printed after 1889
Monadnock and Kearsarge Buildings, Chicago: Plan and sections for prismatic sidewalk lights with plan for the vent door
Actions:
DR1986:0767:304
drawings
printed after 1889
architecture
drawings
Quantity:
5 File
ARCH21276
drawings
Quantity:
5 File
drawings
Quantity:
14 design development drawing(s)
DR1995:0194:001-014
drawings
Quantity:
14 design development drawing(s)
drawings
AP140.S2.SS1.D31.P28
Floor plans and details for structure, including reinforced concrete lift tower, schedule for door finish
Actions:
AP140.S2.SS1.D31.P28
drawings