PH1985:0249
Description:
- The elevation of this factory has alternating rows of raised and sunken bricks. The columns between each window are formed of spiraled bricks and the corners of the factory are curved.
architecture
1984
Detail of the brickwork on the lateral façade of Zigarettenfabrik Reemtsma [Reemtsma Cigarette Factory], Wandsbeck, Hamburg, Germany
Actions:
PH1985:0249
Description:
- The elevation of this factory has alternating rows of raised and sunken bricks. The columns between each window are formed of spiraled bricks and the corners of the factory are curved.
architecture
PH1985:0250
Description:
- The elevation of this factory has alternating rows of raised and sunken bricks. The columns between each window are formed of spiraled bricks and the corners of the factory are curved.
architecture
1984
Detail of the brickwork on a corner of Zigarettenfabrik Reemtsma [Reemtsma Cigarette Factory], Wandsbek, Hamburg, Germany
Actions:
PH1985:0250
Description:
- The elevation of this factory has alternating rows of raised and sunken bricks. The columns between each window are formed of spiraled bricks and the corners of the factory are curved.
architecture
PH1985:0251
Description:
- The elevation of this factory has alternating rows of raised and sunken bricks. The columns between each window are formed of spiraled bricks and the corners of the factory are curved.
architecture
1984
View of the principal and lateral façades of Zigarettenfabrik Reemtsma [Reemtsma Cigarette Factory], Wandsbek, Hamburg, Germany
Actions:
PH1985:0251
Description:
- The elevation of this factory has alternating rows of raised and sunken bricks. The columns between each window are formed of spiraled bricks and the corners of the factory are curved.
architecture
drawings
Quantity:
19 File
ARCH30857
Description:
sketches of handball courts, boiler room, floor plans, elevator layouts, stack foundation, lab layout, exterior elevations, east wall elevation and section, coal storage, columns
Sketches of handball courts, boiler room, floor plans, elevator layouts, stack foundation
Actions:
ARCH30857
Description:
sketches of handball courts, boiler room, floor plans, elevator layouts, stack foundation, lab layout, exterior elevations, east wall elevation and section, coal storage, columns
drawings
Quantity:
19 File
drawings
Quantity:
8 publication drawing(s)
AP140.S2.SS1.D29.P3
Description:
floor plans, elevations, a cross section, bird's-eye plan obliques, plan obliques for details of the external junction of columns and beams, and a diagram for the structural concept
1966 and before
Floor plans, elevations, a cross section, bird's-eye plan obliques
Actions:
AP140.S2.SS1.D29.P3
Description:
floor plans, elevations, a cross section, bird's-eye plan obliques, plan obliques for details of the external junction of columns and beams, and a diagram for the structural concept
drawings
Quantity:
8 publication drawing(s)
1966 and before
drawings
DR2012:0012:020
Description:
Consists of axonometric drawings, plans and sketches for the CCA garden. Material was originally housed in a tube labelled "CCA Garden: Sculpture Columns - Studies 1987-1988. Preliminary Presentation Drawings".
1987-1988
Axonometric drawings, plans and sketches for the CCA garden
Actions:
DR2012:0012:020
Description:
Consists of axonometric drawings, plans and sketches for the CCA garden. Material was originally housed in a tube labelled "CCA Garden: Sculpture Columns - Studies 1987-1988. Preliminary Presentation Drawings".
drawings
1987-1988
DR1988:0437:054
Description:
- This etching for a fireworks construction or macchina is in the form of a garden pavilion. The columns of the first storey of the pavilion are decorated with garlands, and garlands and drapes are hung in all the openings.
temporary architecture
printed 1782
Etching of Palazzi's design for the "seconda macchina" of 1782
Actions:
DR1988:0437:054
Description:
- This etching for a fireworks construction or macchina is in the form of a garden pavilion. The columns of the first storey of the pavilion are decorated with garlands, and garlands and drapes are hung in all the openings.
temporary architecture
drawings
Quantity:
10 File
ARCH79950
Description:
lower level plan, upper level plan, elevations, wall section, stair section, schedule of contracts, isometrics and details of columns, beams and roof construction (includes drafted drawings signed A. Erickson)
1973
Lower level plan, upper level plan, elevations, wall section
Actions:
ARCH79950
Description:
lower level plan, upper level plan, elevations, wall section, stair section, schedule of contracts, isometrics and details of columns, beams and roof construction (includes drafted drawings signed A. Erickson)
drawings
Quantity:
10 File
1973
drawings
AP154.S1.1973.PR01.SS2.035
Description:
Thirty-two drawings numbered 1, BD1, C114, LP205, S11-S12, and SK1 through SK205 with significant gaps. Drawings include section thru elevator core, section thru stair, spandrel heights, street elevations, section at lobby steps, partial plans, expansion joints (record of observation), special mullions at 1st floor (General Bronze Corporation), column schedule center core, loading platform and bumper, building model, lighting plan, fire exit signs, building elevations along north sides of E. 51st and 54th Streets (George A. Fuller Company), Four Seasons Restaurant--chain barrier details, ceiling revision (9th fl.), construction plan, rev'd bumper guard, front stair const., architectural symbols and abbreviations, truck entrance and loading dock, and window unit.
1955-1963
Copies of drawings for the Seagram Building, 375 Park Avenue, New York, N.Y.
Actions:
AP154.S1.1973.PR01.SS2.035
Description:
Thirty-two drawings numbered 1, BD1, C114, LP205, S11-S12, and SK1 through SK205 with significant gaps. Drawings include section thru elevator core, section thru stair, spandrel heights, street elevations, section at lobby steps, partial plans, expansion joints (record of observation), special mullions at 1st floor (General Bronze Corporation), column schedule center core, loading platform and bumper, building model, lighting plan, fire exit signs, building elevations along north sides of E. 51st and 54th Streets (George A. Fuller Company), Four Seasons Restaurant--chain barrier details, ceiling revision (9th fl.), construction plan, rev'd bumper guard, front stair const., architectural symbols and abbreviations, truck entrance and loading dock, and window unit.
drawings
1955-1963
archives
Level of archival description:
Fonds
AP196
Synopsis:
Studio Gang Ford Calumet Environmental Center project records, 2003-2012, documents the design process for the Ford Calumet Environmental Center in Chicago, United-States. The records represent both phases during the competition and the full-term design, after the firm won the project. The records consist of born-digital material, sketches and drawings, textual records, photographs and seven models.
2003-2011
Studio Gang Ford Calumet Environmental Center project records
Actions:
AP196
Synopsis:
Studio Gang Ford Calumet Environmental Center project records, 2003-2012, documents the design process for the Ford Calumet Environmental Center in Chicago, United-States. The records represent both phases during the competition and the full-term design, after the firm won the project. The records consist of born-digital material, sketches and drawings, textual records, photographs and seven models.
archives
Level of archival description:
Fonds
2003-2011