dessins
Quantité:
6 File
ARCH43029
dessins
Quantité:
6 File
dessins
Quantité:
14 File
ARCH43599
dessins
Quantité:
14 File
dessins
Quantité:
3 File
ARCH45354
dessins
Quantité:
3 File
dessins
Quantité:
18 File
ARCH45792
dessins
Quantité:
18 File
dessins
Quantité:
5 File
ARCH46768
dessins
Quantité:
5 File
dessins
ARCH47995
dessins
dessins
Quantité:
8 File
ARCH48062
dessins
Quantité:
8 File
dessins
Quantité:
3 File
ARCH48097
dessins
Quantité:
3 File
dessins
Quantité:
9 File
ARCH50021
dessins
Quantité:
9 File
Projet
AP018.S1.1984.PR03
Description:
This project series document the exterior restauration work of Toronto Union Station in Toronto from 1984-1985. The office identified the project number as 8405. This project consisted of restoration to the exterior of the train station commissioned by VIA Rail Canada Inc. This work was referred to as a clean up in the project documentation. Restauration work was done to the existing exterior stonework, colannades, screens and skylights. This project was referred to as Package A in the materials, with Package B representing a project for interior work (see project series AP018.S1.1984.PR01 in this fonds). This project is recorded through drawings, photographs and textual records dating from 1984-1985. The drawings are of earlier plans for the station, prepared by architects Ross & Macdonald and some by Public Works Canada. The textual records include correspondence, conference and site reports, contract data, construction documentation, financial records, interoffice letters.
1984-1985
Toronto Union Station, Exterior Cleaning of Facades and Colonnades, Toronto (1984-1985)
Actions:
AP018.S1.1984.PR03
Description:
This project series document the exterior restauration work of Toronto Union Station in Toronto from 1984-1985. The office identified the project number as 8405. This project consisted of restoration to the exterior of the train station commissioned by VIA Rail Canada Inc. This work was referred to as a clean up in the project documentation. Restauration work was done to the existing exterior stonework, colannades, screens and skylights. This project was referred to as Package A in the materials, with Package B representing a project for interior work (see project series AP018.S1.1984.PR01 in this fonds). This project is recorded through drawings, photographs and textual records dating from 1984-1985. The drawings are of earlier plans for the station, prepared by architects Ross & Macdonald and some by Public Works Canada. The textual records include correspondence, conference and site reports, contract data, construction documentation, financial records, interoffice letters.
Project
1984-1985