textual records
Quantity:
13 textual record(s)
CCM Design Acoustique
ARCH267567
Description:
This group consists of a letter from consultants in architectural acoustics and noise control that includes recommendations and a memorandum about the acoustics of the Palais des Congrès de Montréal.
April - July 1980
CCM Design Acoustique
Actions:
ARCH267567
Description:
This group consists of a letter from consultants in architectural acoustics and noise control that includes recommendations and a memorandum about the acoustics of the Palais des Congrès de Montréal.
textual records
Quantity:
13 textual record(s)
April - July 1980
drawings
AP178.S1.1988.PR07.SS9.023.1
Description:
Original file title : Edificio No 4 Zona sinistrada do Chiado - sistemas electricos (Sotecnica) This file includes details of the control and security cables, CCTV system, and supply switchboard.
February 1998- June 1999
Electrical drawings, Recuperaçäo do Edifício dos Grandes Armazéns, Bloco C, Reconstrução do Chiado, Lisbon (folder 1 of 2)
Actions:
AP178.S1.1988.PR07.SS9.023.1
Description:
Original file title : Edificio No 4 Zona sinistrada do Chiado - sistemas electricos (Sotecnica) This file includes details of the control and security cables, CCTV system, and supply switchboard.
drawings
February 1998- June 1999
drawings
AP140.S2.SS1.D70.P124
Description:
Plans, elevations, sections and details for second Abando Passenger Interchange project, including for Renfe railway station control room and offices, cladding, lounge and tourist advice centre, cinema and restaurant
circa 1974-1999
Plans, elevations, sections and details for second Abando Passenger Interchange project, Abando Passenger Interchange, Bilbao, Spain
Actions:
AP140.S2.SS1.D70.P124
Description:
Plans, elevations, sections and details for second Abando Passenger Interchange project, including for Renfe railway station control room and offices, cladding, lounge and tourist advice centre, cinema and restaurant
drawings
circa 1974-1999
drawings
AP140.S2.SS1.D70.P130
Description:
site plans, plans, sections and details for second Abando Passenger Interchange project, including for Renfe railway station control room, garden, spine, bus station, service cores, parking garage and roof
circa 1974-1999
Site plans, plans, sections and details for second Abando Passenger Interchange projectz, Abando Passenger Interchange, Bilbao, Spain
Actions:
AP140.S2.SS1.D70.P130
Description:
site plans, plans, sections and details for second Abando Passenger Interchange project, including for Renfe railway station control room, garden, spine, bus station, service cores, parking garage and roof
drawings
circa 1974-1999
drawings, textual records
AP018.S1.1974.PR25.003
Description:
This is a box containing program records, cost control records, foundation and framing plans, specifications, correspondence with the project engineers, design coordination records, inspection reports and their drawings, and kitchen consultancy records.
1875-1982
Project documentation, Royal Ottawa Regional Rehabilitation Centre, Ottawa Health Sciences Centre, Ottawa, Ontario
Actions:
AP018.S1.1974.PR25.003
Description:
This is a box containing program records, cost control records, foundation and framing plans, specifications, correspondence with the project engineers, design coordination records, inspection reports and their drawings, and kitchen consultancy records.
drawings, textual records
1875-1982
drawings, textual records
AP018.S1.1982.PR19.042
Description:
This is a box containing cost control records, the project scope, detail drawings, schedules, consultant correspondence, correspondence with the Canadian government, interoffice letters, detail planning and contractor records, specifications and progress reports.
1983-1984
Project documentation, Hôtel de la Délégation, Algiers, Algeria
Actions:
AP018.S1.1982.PR19.042
Description:
This is a box containing cost control records, the project scope, detail drawings, schedules, consultant correspondence, correspondence with the Canadian government, interoffice letters, detail planning and contractor records, specifications and progress reports.
drawings, textual records
1983-1984
articles
Dan Handel, Francesco Garutti, Émilie Retailleau, carpet, hotel, megastructure, hospitality, Assaf Evron
13 September 2021
A deliberate bombardment of the senses
Dan Handel interviewed by Francesco Garutti and Émilie Retailleau on the strategies behind the deployment of carpets in the deep spaces of hospitality
Actions:
Project
AP056.S1.1995.PR03
Description:
This project series documents a competition entry for the University of Waterloo Centre for Environmental Sciences and Engineering in Waterloo, Ontario in 1995. The office identified the project number as 9502. This project consisted of a proposal to create a new, environmentally sustainable campus building within the scope of the University's master plan. The integrated complex would consist of the five-storey Research Laboratories building and the four-storey Earth Sciences office building, interconnected by the three-storey Interior Street. Corridors in the Research Laboratories building would separate visitors from the rigorously controlled environments of the labs and act as a hub of student activity. Glazed walls would allow visibility into the labs from the corridor. The office building, with a café and museum at its ground level, would have loft-like offices with operable windows for more eco-friendly temperature control. Other ecological features were proposed including a breathing, green wall, the use of local, sustainable materials and a bio-reactor plant, among others. This proposal was never built. The project is recorded through drawings, presentation paintings, a model and some accompanying textual records dating from on or around 1995. The drawings are predominantly original sketches and presentation drawings.
1995
University of Waterloo Centre for Environmental Sciences and Engineering Competition, Waterloo, Ontario (1995)
Actions:
AP056.S1.1995.PR03
Description:
This project series documents a competition entry for the University of Waterloo Centre for Environmental Sciences and Engineering in Waterloo, Ontario in 1995. The office identified the project number as 9502. This project consisted of a proposal to create a new, environmentally sustainable campus building within the scope of the University's master plan. The integrated complex would consist of the five-storey Research Laboratories building and the four-storey Earth Sciences office building, interconnected by the three-storey Interior Street. Corridors in the Research Laboratories building would separate visitors from the rigorously controlled environments of the labs and act as a hub of student activity. Glazed walls would allow visibility into the labs from the corridor. The office building, with a café and museum at its ground level, would have loft-like offices with operable windows for more eco-friendly temperature control. Other ecological features were proposed including a breathing, green wall, the use of local, sustainable materials and a bio-reactor plant, among others. This proposal was never built. The project is recorded through drawings, presentation paintings, a model and some accompanying textual records dating from on or around 1995. The drawings are predominantly original sketches and presentation drawings.
Project
1995
Project
Save the Mountain
AP027.S1.D12
Description:
Long-range plan to preserve and expand Mount Royal Park. Definition and recognition of the logical boundaries of the mountain park area are called for by the Save the Mountain Committee. The plan would establish the right of city to acquire all properties within the designated areas as they become available, and would restrict construction and control building heights in the park area. This project was initiated by H. P. Daniel van Ginkel and Blanche Lemco van Ginkel on their own account. The work was executed pro bono with Michel Chevalier, Harry Mayerovitch and Hazen Sise. It was effected with the support of the Montréal Parks and Playground Association. The recommendations were accepted and embodied in a private bill by the Québec Provincial Legislature and in the bylaws of the City of Montréal.
urban planning
1960
Save the Mountain
Actions:
AP027.S1.D12
Description:
Long-range plan to preserve and expand Mount Royal Park. Definition and recognition of the logical boundaries of the mountain park area are called for by the Save the Mountain Committee. The plan would establish the right of city to acquire all properties within the designated areas as they become available, and would restrict construction and control building heights in the park area. This project was initiated by H. P. Daniel van Ginkel and Blanche Lemco van Ginkel on their own account. The work was executed pro bono with Michel Chevalier, Harry Mayerovitch and Hazen Sise. It was effected with the support of the Montréal Parks and Playground Association. The recommendations were accepted and embodied in a private bill by the Québec Provincial Legislature and in the bylaws of the City of Montréal.
File 12
1960
urban planning
drawings
AP178.S1.1988.PR07.SS9.024.2
Description:
Original file title : Edificio No 4 Zona sinistrada do Chiado - sistemas electricos (Sotecnica) This file includes details of the transformers, main distribution board rooms, fire detection system, control panel, and contract supply power distribution.
November 1997- June 1999
Electrical drawings, Recuperaçäo do Edifício dos Grandes Armazéns, Bloco C, Reconstrução do Chiado, Lisbon (folder 2 of 2)
Actions:
AP178.S1.1988.PR07.SS9.024.2
Description:
Original file title : Edificio No 4 Zona sinistrada do Chiado - sistemas electricos (Sotecnica) This file includes details of the transformers, main distribution board rooms, fire detection system, control panel, and contract supply power distribution.
drawings
November 1997- June 1999