Project
AP022.S1.1973.PR11
Description:
File documents a community planning project (not built) for Burke Mountain, Coquitlam, British Columbia. File contains reference drawings and design development drawings.
[after 1972]
Burke Mountain Community Project
Actions:
AP022.S1.1973.PR11
Description:
File documents a community planning project (not built) for Burke Mountain, Coquitlam, British Columbia. File contains reference drawings and design development drawings.
Project
[after 1972]
Project
155 Spring Street
AP143.S4.D185
Description:
File documents an unexecuted project for an office building at 155 Spring Street, probably in New York City, New York. Material in this file was produced in 1981. File contains working drawings.
1981
155 Spring Street
Actions:
AP143.S4.D185
Description:
File documents an unexecuted project for an office building at 155 Spring Street, probably in New York City, New York. Material in this file was produced in 1981. File contains working drawings.
File 185
1981
Project
AP027.S1.D33
Description:
The material in this project series contains racist language. Please take care when viewing this material and seek help from trusted sources if needed. This project series documents a study on the relocation of the First Nations community of South Indian Lake in Manitoba. The community was relocated due to planned flooding that would be caused by the diversion of the Churchill River for a hydroelectric development. Part of the hydro project included works on Nelson River which would flood the area around the southeast shore of Southern Indian Lake. The study assessed the relocation site for the community and included a proposed plan which outlined economic, social, and educational programmes to be integrated along with the physical development of the region. The proposed plan was not implemented.
urban planning
1966-1968
South Indian Lake, Manitoba (1966-1968)
Actions:
AP027.S1.D33
Description:
The material in this project series contains racist language. Please take care when viewing this material and seek help from trusted sources if needed. This project series documents a study on the relocation of the First Nations community of South Indian Lake in Manitoba. The community was relocated due to planned flooding that would be caused by the diversion of the Churchill River for a hydroelectric development. Part of the hydro project included works on Nelson River which would flood the area around the southeast shore of Southern Indian Lake. The study assessed the relocation site for the community and included a proposed plan which outlined economic, social, and educational programmes to be integrated along with the physical development of the region. The proposed plan was not implemented.
File 33
1966-1968
urban planning
Project
AP143.S4.D60
Description:
File documents the unexectued project for the Progressive Corporation Office Building in Cleveland, Ohio. Material in this file was produced in 1978 and 1986 (predominant 1986). File contains conceptual drawing, design development drawings, presentation drawings, presentation panels, reference drawings, models, and textual records.
1978-1986, predominant 1986
Progressive Corporation Office Building
Actions:
AP143.S4.D60
Description:
File documents the unexectued project for the Progressive Corporation Office Building in Cleveland, Ohio. Material in this file was produced in 1978 and 1986 (predominant 1986). File contains conceptual drawing, design development drawings, presentation drawings, presentation panels, reference drawings, models, and textual records.
File 60
1978-1986, predominant 1986
articles
Escalation of Commitment
Escalation of Commitment
Shane Reiner-Roth traces the development of Los Angeles's freeway infrastructure
Actions:
Keep Safe
textual records
ARCH254059
Description:
development proposal
n.d.
St-Basile-le-Grand - Public Report #1, 1977
Actions:
ARCH254059
Description:
development proposal
textual records
n.d.
textual records
ARCH253506
Description:
memorandums, theme development
1963
Canadian World Exhibit - Corporation Chevalier 1963
Actions:
ARCH253506
Description:
memorandums, theme development
textual records
1963
Led by architect Farida Abu-Bakare and her team at WXY, participants will work in small groups with tools that represent community priorities, municipal frameworks, and spatial trade-offs to collectively map Montréal, and test the possibilities that arise when different forms of knowledge come together.
31 October 2026, 1pm to 4pm
Community Capital: What We Build Together
Actions:
Description:
Led by architect Farida Abu-Bakare and her team at WXY, participants will work in small groups with tools that represent community priorities, municipal frameworks, and spatial trade-offs to collectively map Montréal, and test the possibilities that arise when different forms of knowledge come together.
Sub-series
AP154.S1.1967.PR01.SS2
Description:
Subseries AP154.S1.1967.PR01.SS2, Twin Parks West. Sites R5-7, 10-12, 6, 8, Bronx, New York, N.Y. (1969) documents four executed buildings in the area sometimes referred to as Twin Parks Southwest. At Site 8, 167 small apartments for the elderly were built in buildings of 5 to 19 floors. The other three sites all include larger apartments for families. Site 6 contains 84 middle-income units, some of them split-level, in 11-storey buildings. Site 5-7 contains 99 appartments in10-storey buildings. Site 10-12 contains 136 apartments, a day care center and parking in 17-storey buildings.The project was developed by the New York State Urban Development Corporation. The series contains drawings that constitute a "design manual" submission and architectural and structural drawings.
1969-1971
Twin Parks West. Sites R5-7, 10-12, 6, 8, Bronx, New York, N.Y. (1969)
Actions:
AP154.S1.1967.PR01.SS2
Description:
Subseries AP154.S1.1967.PR01.SS2, Twin Parks West. Sites R5-7, 10-12, 6, 8, Bronx, New York, N.Y. (1969) documents four executed buildings in the area sometimes referred to as Twin Parks Southwest. At Site 8, 167 small apartments for the elderly were built in buildings of 5 to 19 floors. The other three sites all include larger apartments for families. Site 6 contains 84 middle-income units, some of them split-level, in 11-storey buildings. Site 5-7 contains 99 appartments in10-storey buildings. Site 10-12 contains 136 apartments, a day care center and parking in 17-storey buildings.The project was developed by the New York State Urban Development Corporation. The series contains drawings that constitute a "design manual" submission and architectural and structural drawings.
Project
1969-1971
Project
AP022.S1.2002.PR02
Description:
File documents a high-rise residential building, [Vancouver, British Columbia?] File contains design development drawings.
circa 2002
Residential Tower for Concord Pacific
Actions:
AP022.S1.2002.PR02
Description:
File documents a high-rise residential building, [Vancouver, British Columbia?] File contains design development drawings.
Project
circa 2002