photographs
DR1983:1137
architecture
negative exposed between 1954 and 1984
Photograph of a model for the Giraffe House for the Montréal Zoo, Montréal, Québec
Actions:
DR1983:1137
photographs
negative exposed between 1954 and 1984
architecture
drawings
DR1991:0060:007
Description:
A design development drawing of arcades "A" and "B". Drawing number GA-9/16.
21 January 1988
The juxtaposition of arcades A and B as a grid, CCA garden, Montréal, Québec
Actions:
DR1991:0060:007
Description:
A design development drawing of arcades "A" and "B". Drawing number GA-9/16.
drawings
21 January 1988
drawings
DR1991:0060:008
Description:
A design development drawing of arcades "A" and "B". Drawing number GA-9/17.
21 January 1988
The juxtaposition of arcades A and B as a grid, CCA garden, Montréal, Québec
Actions:
DR1991:0060:008
Description:
A design development drawing of arcades "A" and "B". Drawing number GA-9/17.
drawings
21 January 1988
textual records
ARCH266291
1966
A detailed list for the hardware for the James Lyng School, in Montréal, Québec
Actions:
ARCH266291
textual records
1966
Project
AP013.S1.D312
Description:
File documents an unexecuted project for a commercial and office building in Québec, Québec. Material in this file was produced in 1948. File contains index cards, survey drawings, preliminary and design development drawings, working and detail drawings, mechanical drawings, and textual documents.
1948
Quebec City Motor Truck Branch House
Actions:
AP013.S1.D312
Description:
File documents an unexecuted project for a commercial and office building in Québec, Québec. Material in this file was produced in 1948. File contains index cards, survey drawings, preliminary and design development drawings, working and detail drawings, mechanical drawings, and textual documents.
Project
1948
photographs
Album de photographies relatives au pont-tunnel Louis-Hippolyte-Lafontaine, Boucherville, Québec
ARCH193306
Description:
Cribs, employees, official visits; tunnel section built in place for 1500 ft.; end closed; removed cofferdam, flooded; floating the caissons, flooding progress, dikes, plug blasts, putting ballast in, pre-stress cables, scows, divers; Hydro Québec dredges, scows, cable and anchors (32,000 tons each), anchors, suspensions cables, divers, sand jetting equipment. Also: Design Program for Placing of Elements, Data on Engineering.
entre mai et septembre 1964
Album de photographies relatives au pont-tunnel Louis-Hippolyte-Lafontaine, Boucherville, Québec
Actions:
ARCH193306
Description:
Cribs, employees, official visits; tunnel section built in place for 1500 ft.; end closed; removed cofferdam, flooded; floating the caissons, flooding progress, dikes, plug blasts, putting ballast in, pre-stress cables, scows, divers; Hydro Québec dredges, scows, cable and anchors (32,000 tons each), anchors, suspensions cables, divers, sand jetting equipment. Also: Design Program for Placing of Elements, Data on Engineering.
photographs
entre mai et septembre 1964
photographs
Album de photographies relatives au pont-tunnel Louis-Hippolyte-Lafontaine, Boucherville, Québec
ARCH193307
Description:
Cribs, employees, official visits; tunnel section built in place for 1500 ft.; end closed; removed cofferdam, flooded; floating the caissons, flooding progress, dikes, plug blasts, putting ballast in, pre-stress cables, scows, divers; Hydro Québec dredges, scows, cable and anchors (32,000 tons each), anchors, suspensions cables, divers, sand jetting equipment. Also: Design Program for Placing of Elements, Data on Engineering.
entre octobre 1964 à mai 1965
Album de photographies relatives au pont-tunnel Louis-Hippolyte-Lafontaine, Boucherville, Québec
Actions:
ARCH193307
Description:
Cribs, employees, official visits; tunnel section built in place for 1500 ft.; end closed; removed cofferdam, flooded; floating the caissons, flooding progress, dikes, plug blasts, putting ballast in, pre-stress cables, scows, divers; Hydro Québec dredges, scows, cable and anchors (32,000 tons each), anchors, suspensions cables, divers, sand jetting equipment. Also: Design Program for Placing of Elements, Data on Engineering.
photographs
entre octobre 1964 à mai 1965
photographs
Album de photographies relatives au pont-tunnel Louis-Hippolyte-Lafontaine, Boucherville, Québec
ARCH193308
Description:
Cribs, employees, official visits; tunnel section built in place for 1500 ft.; end closed; removed cofferdam, flooded; floating the caissons, flooding progress, dikes, plug blasts, putting ballast in, pre-stress cables, scows, divers; Hydro Québec dredges, scows, cable and anchors (32,000 tons each), anchors, suspensions cables, divers, sand jetting equipment. Also: Design Program for Placing of Elements, Data on Engineering.
entre janvier et août 1965
Album de photographies relatives au pont-tunnel Louis-Hippolyte-Lafontaine, Boucherville, Québec
Actions:
ARCH193308
Description:
Cribs, employees, official visits; tunnel section built in place for 1500 ft.; end closed; removed cofferdam, flooded; floating the caissons, flooding progress, dikes, plug blasts, putting ballast in, pre-stress cables, scows, divers; Hydro Québec dredges, scows, cable and anchors (32,000 tons each), anchors, suspensions cables, divers, sand jetting equipment. Also: Design Program for Placing of Elements, Data on Engineering.
photographs
entre janvier et août 1965
photographs
Album de photographies relatives au pont-tunnel Louis-Hippolyte-Lafontaine, Boucherville, Québec
ARCH193309
Description:
Cribs, employees, official visits; tunnel section built in place for 1500 ft.; end closed; removed cofferdam, flooded; floating the caissons, flooding progress, dikes, plug blasts, putting ballast in, pre-stress cables, scows, divers; Hydro Québec dredges, scows, cable and anchors (32,000 tons each), anchors, suspensions cables, divers, sand jetting equipment. Also: Design Program for Placing of Elements, Data on Engineering.
mai 1965
Album de photographies relatives au pont-tunnel Louis-Hippolyte-Lafontaine, Boucherville, Québec
Actions:
ARCH193309
Description:
Cribs, employees, official visits; tunnel section built in place for 1500 ft.; end closed; removed cofferdam, flooded; floating the caissons, flooding progress, dikes, plug blasts, putting ballast in, pre-stress cables, scows, divers; Hydro Québec dredges, scows, cable and anchors (32,000 tons each), anchors, suspensions cables, divers, sand jetting equipment. Also: Design Program for Placing of Elements, Data on Engineering.
photographs
mai 1965
photographs
Album de photographies relatives au pont-tunnel Louis-Hippolyte-Lafontaine, Boucherville, Québec
ARCH193310
Description:
Cribs, employees, official visits; tunnel section built in place for 1500 ft.; end closed; removed cofferdam, flooded; floating the caissons, flooding progress, dikes, plug blasts, putting ballast in, pre-stress cables, scows, divers; Hydro Québec dredges, scows, cable and anchors (32,000 tons each), anchors, suspensions cables, divers, sand jetting equipment. Also: Design Program for Placing of Elements, Data on Engineering.
entre mai et juin 1965
Album de photographies relatives au pont-tunnel Louis-Hippolyte-Lafontaine, Boucherville, Québec
Actions:
ARCH193310
Description:
Cribs, employees, official visits; tunnel section built in place for 1500 ft.; end closed; removed cofferdam, flooded; floating the caissons, flooding progress, dikes, plug blasts, putting ballast in, pre-stress cables, scows, divers; Hydro Québec dredges, scows, cable and anchors (32,000 tons each), anchors, suspensions cables, divers, sand jetting equipment. Also: Design Program for Placing of Elements, Data on Engineering.
photographs
entre mai et juin 1965