Série(s)
Architectural projects
AP164.S1
Description:
This series documents the architectural projects of Ábalos&Herreros from 1986 to 2006 and represents over 150 projects, including exhibitions. The firm worked on a wide variety of projects from commercial and residential structures to libraries and sewage treatment plants. The firm's design process was research oriented and involved conversations between Ábalos and Herreros, office collaborators, artists who partook in the projects, as well as other architects. Several projects found in this series were developed in collaboration with other architects including: José Manuel Ábalos; Salvador Pérez Arroyo; Filippo Costi; Ángel Jaramillo Esteban; Javier Fresneda; Eduardo Horta; Martín Marciano; Ángel Jaramillo Sánchez; Renata Sentkiewicz; and Héctor Vigliecca. Most projects were designed for the city of Madrid and the Community of Madrid. Projects were also developed for other sites in Spain, including the Canary Islands, as well as for sites in Portugal, Germany, the United States, and Brazil. Ábalos & Herreros often created new projects from the firm's existing work. The firm also identified their projects numerically. These identification numbers are documented at the project series level for each project. Among the materials documenting the firm's projects are conceptual, design development, presentation, and working drawings, as well as panels. There are also several CAD drawings and prints of born digital drawings. Documenting the firms conceptual process are collages and photomontages. Photographic materials included in this series depict project sites and built projects. Also included are a variety of research reference materials, correspondence, project documentation, and project submissions. Although creating models was not a common practice for the firm, there are a few project series which include models.
1953-2009
Architectural projects
Actions:
AP164.S1
Description:
This series documents the architectural projects of Ábalos&Herreros from 1986 to 2006 and represents over 150 projects, including exhibitions. The firm worked on a wide variety of projects from commercial and residential structures to libraries and sewage treatment plants. The firm's design process was research oriented and involved conversations between Ábalos and Herreros, office collaborators, artists who partook in the projects, as well as other architects. Several projects found in this series were developed in collaboration with other architects including: José Manuel Ábalos; Salvador Pérez Arroyo; Filippo Costi; Ángel Jaramillo Esteban; Javier Fresneda; Eduardo Horta; Martín Marciano; Ángel Jaramillo Sánchez; Renata Sentkiewicz; and Héctor Vigliecca. Most projects were designed for the city of Madrid and the Community of Madrid. Projects were also developed for other sites in Spain, including the Canary Islands, as well as for sites in Portugal, Germany, the United States, and Brazil. Ábalos & Herreros often created new projects from the firm's existing work. The firm also identified their projects numerically. These identification numbers are documented at the project series level for each project. Among the materials documenting the firm's projects are conceptual, design development, presentation, and working drawings, as well as panels. There are also several CAD drawings and prints of born digital drawings. Documenting the firms conceptual process are collages and photomontages. Photographic materials included in this series depict project sites and built projects. Also included are a variety of research reference materials, correspondence, project documentation, and project submissions. Although creating models was not a common practice for the firm, there are a few project series which include models.
Series
1953-2009
Projet
AP018.S1.1981.PR07
Description:
This project series documents an office building located at 1500 Don Mills Road in North York, Ontario from 1981-1982. The office identified the project number as 8107. This project consisted of a twelve storey office building, approximately 286,939 square feet in size. The design also included basement parking and a mechanical penthouse. This was to be a second office building to the one already located at that address. In 1976, Parkin Architects Planners began work on two phases of development for the property at 1500 Don Mills for their client Marathon Realty. Phase I consisted of an office building. This project, a second office building, was planned for Phase II, along with a parking structure. It is not clear from the materials in this project series whether the building was ever constructed. The project is recorded through drawings and textual records dating from 1981-1982. The drawings show site plans, typical floor plans and area calculations. The textual records consist of documents dealing with the rezoning of the property.
1981-1982
Office Building, Phase II, 1500 Don Mills Road, North York, Ontario (1981)
Actions:
AP018.S1.1981.PR07
Description:
This project series documents an office building located at 1500 Don Mills Road in North York, Ontario from 1981-1982. The office identified the project number as 8107. This project consisted of a twelve storey office building, approximately 286,939 square feet in size. The design also included basement parking and a mechanical penthouse. This was to be a second office building to the one already located at that address. In 1976, Parkin Architects Planners began work on two phases of development for the property at 1500 Don Mills for their client Marathon Realty. Phase I consisted of an office building. This project, a second office building, was planned for Phase II, along with a parking structure. It is not clear from the materials in this project series whether the building was ever constructed. The project is recorded through drawings and textual records dating from 1981-1982. The drawings show site plans, typical floor plans and area calculations. The textual records consist of documents dealing with the rezoning of the property.
Project
1981-1982
Projet
AP180.S1.1994.PR04
Description:
This project series documents an unrealized project for a settlement of vacation houses in Buggerru, Italy. Riva worked on this project in 1994. The project is recorded through various studies, including site studies, and design development drawings, including site plans, floor plans, exterior elevations, and sections.
1994
Case per vacanze [Vacation houses], Buggerru, Italy (1994)
Actions:
AP180.S1.1994.PR04
Description:
This project series documents an unrealized project for a settlement of vacation houses in Buggerru, Italy. Riva worked on this project in 1994. The project is recorded through various studies, including site studies, and design development drawings, including site plans, floor plans, exterior elevations, and sections.
Project
1994
Projet
AP180.S1.1999.PR03
Description:
This project series documents Riva's design for the Sala Consiliare, the council chamber of Milan's city hall in Palazzo Marino, Italy. Riva worked on this project in 1999. The project is recorded through studies and design development drawings, including floor plans, sections, elevations, and furnishing details.
1999
Sala Consiliare [Council Chamber], Milan, Italy (1999)
Actions:
AP180.S1.1999.PR03
Description:
This project series documents Riva's design for the Sala Consiliare, the council chamber of Milan's city hall in Palazzo Marino, Italy. Riva worked on this project in 1999. The project is recorded through studies and design development drawings, including floor plans, sections, elevations, and furnishing details.
Project
1999
Projet
AP180.S1.1971.PR02
Description:
This project series documents the Case Zazzu, built one-storey vacation houses in Stintino, Italy. Riva worked on this project in 1973. The project series contains design development drawings and presentation drawings. These drawings include sections, exterior elevations, floor plans, and furnishing details.
1960-1971
Case Zazzu [Zazzu houses], Stintino, Italy (1971)
Actions:
AP180.S1.1971.PR02
Description:
This project series documents the Case Zazzu, built one-storey vacation houses in Stintino, Italy. Riva worked on this project in 1973. The project series contains design development drawings and presentation drawings. These drawings include sections, exterior elevations, floor plans, and furnishing details.
Project
1960-1971
Projet
AP180.S1.1970.PR03
Description:
This project series documents an unrealized project for the renovation of the Complesso dell'Agnello, a three-storey hotel in Taino. Riva worked on this project in 1970. The project is recorded through studies and sketches of exterior elevations. The project series also contains exterior and interior elevations, floor plans, and sections.
1970
Risistemazione del complesso dell'Agnello [Renovations for the Agnello Complex], Taino, Italy (1970)
Actions:
AP180.S1.1970.PR03
Description:
This project series documents an unrealized project for the renovation of the Complesso dell'Agnello, a three-storey hotel in Taino. Riva worked on this project in 1970. The project is recorded through studies and sketches of exterior elevations. The project series also contains exterior and interior elevations, floor plans, and sections.
Project
1970
À cette conférence Mellon, Rahul Mehrotra présente ses idées sur Mumbai et décrit comment il en est arrivé dans son travail à faire plusieurs choix critiques afin d’exprimer le pluralisme dynamique de l’Inde.
5 décembre 2013
Rahul Mehrotra : « Working in Mumbai »
Actions:
Description:
À cette conférence Mellon, Rahul Mehrotra présente ses idées sur Mumbai et décrit comment il en est arrivé dans son travail à faire plusieurs choix critiques afin d’exprimer le pluralisme dynamique de l’Inde.
Projet
AP075.S1.2008.PR02
Description:
Project series documents Cornelia Hahn Oberlander's project for the Inuvik School, later known as East Three School, in Inuvik, Northwest Territories. The project consisted in the landscape design and a playground design for the new school replacing the Sir Alexander MacKenzie elementary school and the Samuel Herne Secondary School. Oberlander worked on this project from 2008 to 2012 with architects Pin/Taylor. During her design process, Oberlander consulted the teachers, parents, staff and students on ways to express their culture in the landscape design. She also had to adapt her design to the extreme climate of the region. Oberlander located the play court at the angle of the two buildings of the elementary school and the secondary school, to shelter it from the wind, and allowing small children to play outside. The plant selection was made by "harvesting local site and surrounding area for plant material" [1] and was also inspired by traditional cuisine. The project was completed in 2012. The project series also includes some documents related to a project possibly unrealized of the Jim Koe Park also in Inuvik, near the school. The project series contains design development drawings and working drawings, such as planting plans, irrigation plans, grading plans, landscape sections, and site plans. The drawings also includes sets of building plans used as reference. The project is also documented through correspondence, including with architects, suppliers, and consultants, specifications, scope of work, schematic design and design reports from architectural firm, minutes of meetings, and research material. Source: [1] Herrington, Susan. Cornelia Hahn Oberlander: Making the Modern Landscape, University of Virginia Press, 2014, 304 pages, p. 197.
1999-2014
Inuvik School, Inuvik, Northwest Territories (2008)
Actions:
AP075.S1.2008.PR02
Description:
Project series documents Cornelia Hahn Oberlander's project for the Inuvik School, later known as East Three School, in Inuvik, Northwest Territories. The project consisted in the landscape design and a playground design for the new school replacing the Sir Alexander MacKenzie elementary school and the Samuel Herne Secondary School. Oberlander worked on this project from 2008 to 2012 with architects Pin/Taylor. During her design process, Oberlander consulted the teachers, parents, staff and students on ways to express their culture in the landscape design. She also had to adapt her design to the extreme climate of the region. Oberlander located the play court at the angle of the two buildings of the elementary school and the secondary school, to shelter it from the wind, and allowing small children to play outside. The plant selection was made by "harvesting local site and surrounding area for plant material" [1] and was also inspired by traditional cuisine. The project was completed in 2012. The project series also includes some documents related to a project possibly unrealized of the Jim Koe Park also in Inuvik, near the school. The project series contains design development drawings and working drawings, such as planting plans, irrigation plans, grading plans, landscape sections, and site plans. The drawings also includes sets of building plans used as reference. The project is also documented through correspondence, including with architects, suppliers, and consultants, specifications, scope of work, schematic design and design reports from architectural firm, minutes of meetings, and research material. Source: [1] Herrington, Susan. Cornelia Hahn Oberlander: Making the Modern Landscape, University of Virginia Press, 2014, 304 pages, p. 197.
Project
1999-2014
articles
Tisser modernité et tradition
Abigail Duke présente l’architecture d’Arc Frank Mbanefo
Actions:
Projet
AP180.S1.1990.PR01
Description:
This project series documents the unrealized Casa per Vittorio Matino, which appears to be a one-storey private residence in Otranto, Italy. Riva worked on this project in 1990. It contains design development drawings, such as site plans, floor plans, exterior and interior elevations, sections, and furnishing details.
1990
Casa per Vittorio Matino [House for Vittorio Matino], Otranto, Italy (1990)
Actions:
AP180.S1.1990.PR01
Description:
This project series documents the unrealized Casa per Vittorio Matino, which appears to be a one-storey private residence in Otranto, Italy. Riva worked on this project in 1990. It contains design development drawings, such as site plans, floor plans, exterior and interior elevations, sections, and furnishing details.
Project
1990