ARCH285561
c. 1958
ARCH285790
Description:
Drawing number 5867-S11
1965
Pool, elevated walk and stairs details for Toronto City Hall and Civic Square, Toronto
Actions:
ARCH285790
Description:
Drawing number 5867-S11
ARCH285795
circa 1958
photographies
PH1999:0138
architecture
1999
View of hallway with wood panelled walls and clock, Toronto-Dominion Centre, Toronto, Canada
Actions:
PH1999:0138
photographies
1999
architecture
documents textuels
AP018.S1.1958.PR03.008
circa 1958
documents textuels
circa 1958
Projet
AP018.S1.1979.PR07
Description:
This project series documents an addition made to the press hall of the Toronto Sun building in downtown Toronto in 1979. The office identified the project number as 7907. From 1973-1975, Parkin Architects Planners designed and constructed the Toronto Sun press plant and office building at 333 King Street East. This project consisted of adding 7 new presses to press line no. 2 in that building, which in turn required construction of a new mezzanine at the perimeter of the presses. The drawings consist largely of reprographic copies of details and floor plans. The textual records include correspondence, conference reports, site reports, financial records, supplementary instructions, change orders and interoffice letters.
1976-1982
The Toronto Sun Publishing Limited, Press Plant and Office Building, Press Line No. 2 Addition, Toronto (1979)
Actions:
AP018.S1.1979.PR07
Description:
This project series documents an addition made to the press hall of the Toronto Sun building in downtown Toronto in 1979. The office identified the project number as 7907. From 1973-1975, Parkin Architects Planners designed and constructed the Toronto Sun press plant and office building at 333 King Street East. This project consisted of adding 7 new presses to press line no. 2 in that building, which in turn required construction of a new mezzanine at the perimeter of the presses. The drawings consist largely of reprographic copies of details and floor plans. The textual records include correspondence, conference reports, site reports, financial records, supplementary instructions, change orders and interoffice letters.
Project
1976-1982
dessins, documents textuels
AP018.S1.1974.PR09.003
Description:
This is a box containing sketches, details, colour schedule including colour samples, specifications, change orders, inspection reports, correspondence, documentation on furnishings, minutes of meeting for site meetings, documentation for trees and plants, and notebooks.
1978-1980
Working files, sketches, details, and project documentation, Toronto Humane Society, New Building, Toronto
Actions:
AP018.S1.1974.PR09.003
Description:
This is a box containing sketches, details, colour schedule including colour samples, specifications, change orders, inspection reports, correspondence, documentation on furnishings, minutes of meeting for site meetings, documentation for trees and plants, and notebooks.
dessins, documents textuels
1978-1980
dessins
AP018.S1.1978.PR09.010
circa 1978
Plans and old jail details, Toronto Humane Society, Renovation Old Don Jail, Toronto
Actions:
AP018.S1.1978.PR09.010
dessins
circa 1978
Projet
AP056.S1.1995.PR05
Description:
This project series documents the Pavilions Condominiums, later referred to as the H2O Condominiums, in Toronto from 1995-1999. The office identified the project number as 9505. This project consisted of the design of four large condo buildings located on the shoreline of Lake Ontario at 500 Queens Quay West. The first two buildings, with an exterior of concrete, red brick and glass, were completed and occupied in the spring of 1999. The two eleven-storey towers were connected in a U-shape by a smaller building, creating a courtyard at their centre. Two more towers were scheduled for completion in 2001, but they were never built. The project is recorded through drawings dating from 1995-1997. The drawings are mostly originals and include sketches, presentation drawings, plans, elevations, sections, perspectives and details. There are also some reprographic copies of watercolour paintings in the materials.
1995-1997
The Pavilions Condominiums, Toronto (1995-1999)
Actions:
AP056.S1.1995.PR05
Description:
This project series documents the Pavilions Condominiums, later referred to as the H2O Condominiums, in Toronto from 1995-1999. The office identified the project number as 9505. This project consisted of the design of four large condo buildings located on the shoreline of Lake Ontario at 500 Queens Quay West. The first two buildings, with an exterior of concrete, red brick and glass, were completed and occupied in the spring of 1999. The two eleven-storey towers were connected in a U-shape by a smaller building, creating a courtyard at their centre. Two more towers were scheduled for completion in 2001, but they were never built. The project is recorded through drawings dating from 1995-1997. The drawings are mostly originals and include sketches, presentation drawings, plans, elevations, sections, perspectives and details. There are also some reprographic copies of watercolour paintings in the materials.
Project
1995-1997
Projet
AP140.S2.SS1.D83
Description:
File documents an unsuccessful competition entry for the Ballet Opera House, in Toronto, Ontario, Canada. Material in this file was produced between 1979 and 1988. File contains reference drawings, design development and presentation drawings. File also contains photographic materials, including views of a presentation model by photographer Fiona Spalding-Smith, as well as textual records.
1979-1988
Ballet Opera House Competition, Toronto, Ontario
Actions:
AP140.S2.SS1.D83
Description:
File documents an unsuccessful competition entry for the Ballet Opera House, in Toronto, Ontario, Canada. Material in this file was produced between 1979 and 1988. File contains reference drawings, design development and presentation drawings. File also contains photographic materials, including views of a presentation model by photographer Fiona Spalding-Smith, as well as textual records.
File 83
1979-1988