photographies
ARCH193310
Description:
Cribs, employees, official visits; tunnel section built in place for 1500 ft.; end closed; removed cofferdam, flooded; floating the caissons, flooding progress, dikes, plug blasts, putting ballast in, pre-stress cables, scows, divers; Hydro Québec dredges, scows, cable and anchors (32,000 tons each), anchors, suspensions cables, divers, sand jetting equipment. Also: Design Program for Placing of Elements, Data on Engineering.
entre mai et juin 1965
Album de photographies relatives au pont-tunnel Louis-Hippolyte-Lafontaine, Boucherville, Québec
Actions:
ARCH193310
Description:
Cribs, employees, official visits; tunnel section built in place for 1500 ft.; end closed; removed cofferdam, flooded; floating the caissons, flooding progress, dikes, plug blasts, putting ballast in, pre-stress cables, scows, divers; Hydro Québec dredges, scows, cable and anchors (32,000 tons each), anchors, suspensions cables, divers, sand jetting equipment. Also: Design Program for Placing of Elements, Data on Engineering.
photographies
entre mai et juin 1965
photographies
ARCH193311
Description:
Cribs, employees, official visits; tunnel section built in place for 1500 ft.; end closed; removed cofferdam, flooded; floating the caissons, flooding progress, dikes, plug blasts, putting ballast in, pre-stress cables, scows, divers; Hydro Québec dredges, scows, cable and anchors (32,000 tons each), anchors, suspensions cables, divers, sand jetting equipment. Also: Design Program for Placing of Elements, Data on Engineering.
entre juillet et septembre 1965
Album de photographies relatives au pont-tunnel Louis-Hippolyte-Lafontaine, Boucherville, Québec
Actions:
ARCH193311
Description:
Cribs, employees, official visits; tunnel section built in place for 1500 ft.; end closed; removed cofferdam, flooded; floating the caissons, flooding progress, dikes, plug blasts, putting ballast in, pre-stress cables, scows, divers; Hydro Québec dredges, scows, cable and anchors (32,000 tons each), anchors, suspensions cables, divers, sand jetting equipment. Also: Design Program for Placing of Elements, Data on Engineering.
photographies
entre juillet et septembre 1965
photographies
ARCH193312
Description:
Cribs, employees, official visits; tunnel section built in place for 1500 ft.; end closed; removed cofferdam, flooded; floating the caissons, flooding progress, dikes, plug blasts, putting ballast in, pre-stress cables, scows, divers; Hydro Québec dredges, scows, cable and anchors (32,000 tons each), anchors, suspensions cables, divers, sand jetting equipment. Also: Design Program for Placing of Elements, Data on Engineering.
entre septembre et décembre 1965
Album de photographies relatives au pont-tunnel Louis-Hippolyte-Lafontaine, Boucherville, Québec
Actions:
ARCH193312
Description:
Cribs, employees, official visits; tunnel section built in place for 1500 ft.; end closed; removed cofferdam, flooded; floating the caissons, flooding progress, dikes, plug blasts, putting ballast in, pre-stress cables, scows, divers; Hydro Québec dredges, scows, cable and anchors (32,000 tons each), anchors, suspensions cables, divers, sand jetting equipment. Also: Design Program for Placing of Elements, Data on Engineering.
photographies
entre septembre et décembre 1965
Projet
AP013.S1.D601
Description:
This project series is made up of four drawings for a house designed for Mrs. G.A. Ross Jr. in Mont-Royal, Québec. It is not known if the project was executed.
circa 1939
House for Mrs. G.A. Ross Jr., Ville de Mont-Royal, Québec, Canada (approximately 1939)
Actions:
AP013.S1.D601
Description:
This project series is made up of four drawings for a house designed for Mrs. G.A. Ross Jr. in Mont-Royal, Québec. It is not known if the project was executed.
Project
circa 1939
dessins
DR1991:0060:064
Description:
A design development drawing of the future site of the CCA garden. Drawing number GA-4.
September 1987
A plan for the integration of the garden and landscape design, CCA garden, Montréal, Québec
Actions:
DR1991:0060:064
Description:
A design development drawing of the future site of the CCA garden. Drawing number GA-4.
dessins
September 1987
dessins
DR1991:0060:071
Description:
A design development drawing of the CCA garden, showing the front of Shaughnessy House. Drawing number GA-16.
15 February 1988
Details of the perimeter walls on the north of the site, CCA garden, Montréal, Québec
Actions:
DR1991:0060:071
Description:
A design development drawing of the CCA garden, showing the front of Shaughnessy House. Drawing number GA-16.
dessins
15 February 1988
dessins
ARCH265330
Description:
Plan of a proposed office for J.M.K of the Imperial Tobacco Company of Canada.
Plan of a proposed office for the Imperial Tobacco Company of Canada, in Montréal, Québec
Actions:
ARCH265330
Description:
Plan of a proposed office for J.M.K of the Imperial Tobacco Company of Canada.
dessins
dessins
Quantité:
3 reprographic copy(ies)
ARCH265638
dessins
Quantité:
3 reprographic copy(ies)
ARCH255848
1967
Mine tailings, Murdockville, Québec, from the series The Forms of Canadian Industrial Architecture
PH2025:0002:026
Description:
1984 (printed 2024)
Mine tailings, Murdockville, Québec, from the series The Forms of Canadian Industrial Architecture
Actions:
PH2025:0002:026
Description: