Série(s)
AP179.S2
Description:
Series 2, Witte Arts Center, Green Bay, Wisconsin, 2000 – 2002, documents the development of a project (unrealized) by Office d’A in response to a real estate brief for a floor of artists’ studios supported by a street level gallery in Green Bay, Wisconsin. The design for the Witte Arts Center addresses functional architectural concerns like light and circulation through elements such as suspended skylights and an open-air staircase. For the staircase in particular, corbelled brick patterning around the interior stairs creates a distortion of the building’s façade nicknamed “the smile.” The series consists of sketches, drawings and reprographic copies from the pre-design to design development phases of the project, a model, and photographic materials. Textual records in the series include correspondence, meeting notes and vendor catalogues. Digital material consists of CAD drawings, 3D models and renderings, images of the model and drawings, correspondence and other documents.
2000 - 2002
Witte Arts Center, Green Bay, Wisconsin (2000 - 2002)
Actions:
AP179.S2
Description:
Series 2, Witte Arts Center, Green Bay, Wisconsin, 2000 – 2002, documents the development of a project (unrealized) by Office d’A in response to a real estate brief for a floor of artists’ studios supported by a street level gallery in Green Bay, Wisconsin. The design for the Witte Arts Center addresses functional architectural concerns like light and circulation through elements such as suspended skylights and an open-air staircase. For the staircase in particular, corbelled brick patterning around the interior stairs creates a distortion of the building’s façade nicknamed “the smile.” The series consists of sketches, drawings and reprographic copies from the pre-design to design development phases of the project, a model, and photographic materials. Textual records in the series include correspondence, meeting notes and vendor catalogues. Digital material consists of CAD drawings, 3D models and renderings, images of the model and drawings, correspondence and other documents.
Series
2000 - 2002
Projet
AP144.S2.D39
Description:
File documents an unexecuted proposal for a one-storey farmhouse located in Trucklehill, near Wraxall Park, Wiltshire, England. Interior is organized around a large central living room, and the need for passageways is eliminated. Material from an adjacent barn, slated for demolition, was to be used for the lower structure of the house, and installed by local labour, while the prefabricated aluminum superstructure was to be constructed off site (Cedric Price-Works II). Plans for the installation of a central heating system in an existing residential structure are also part of the file and relate to the project by client and possibly geographical location. However this residence is not part of the site plan. Presentation drawings were published in Price, Cedric. 'Cedric Price-Works II' (London: Architectural Press, 1984), 52. Material in this file was produced between 1961 and 1962. File contains presentation drawings, reference drawings, and textual records.
1921, 1961-1962
Farmhouse at Truckle Hill, Wiltshire
Actions:
AP144.S2.D39
Description:
File documents an unexecuted proposal for a one-storey farmhouse located in Trucklehill, near Wraxall Park, Wiltshire, England. Interior is organized around a large central living room, and the need for passageways is eliminated. Material from an adjacent barn, slated for demolition, was to be used for the lower structure of the house, and installed by local labour, while the prefabricated aluminum superstructure was to be constructed off site (Cedric Price-Works II). Plans for the installation of a central heating system in an existing residential structure are also part of the file and relate to the project by client and possibly geographical location. However this residence is not part of the site plan. Presentation drawings were published in Price, Cedric. 'Cedric Price-Works II' (London: Architectural Press, 1984), 52. Material in this file was produced between 1961 and 1962. File contains presentation drawings, reference drawings, and textual records.
File 39
1921, 1961-1962
Projet
Auditorium, Claverton Bath
AP144.S2.D41
Description:
File documents an unexecuted project for a domed auditorium at Claverton in Bath, England, for the American Museum in Britain. Adapted from Buckmister Fuller's design for the Radome it was to serve as a multipurpose auditorium and exhibition space. The 250-seat auditorium was enclosed by a double dome construction which could be raised and lowered by hydraulic jacks. Design development sketches and perspective studies show various layouts for seating, and diagrams contain directions for erecting the stage and positioning the dome. A section shows the major components: the dome, both lowered and raised; the location of the hydraulic jacks, screens, and baffles; and the seating layout. Two interior perspectives show the dome both raised and lowered. Material in this file was produced between 1962 and 1964. Some perspective diagrams in the file are attributed to M. Haxworth. File contains design development drawings, photographic materials, and textual records.
1962-1964
Auditorium, Claverton Bath
Actions:
AP144.S2.D41
Description:
File documents an unexecuted project for a domed auditorium at Claverton in Bath, England, for the American Museum in Britain. Adapted from Buckmister Fuller's design for the Radome it was to serve as a multipurpose auditorium and exhibition space. The 250-seat auditorium was enclosed by a double dome construction which could be raised and lowered by hydraulic jacks. Design development sketches and perspective studies show various layouts for seating, and diagrams contain directions for erecting the stage and positioning the dome. A section shows the major components: the dome, both lowered and raised; the location of the hydraulic jacks, screens, and baffles; and the seating layout. Two interior perspectives show the dome both raised and lowered. Material in this file was produced between 1962 and 1964. Some perspective diagrams in the file are attributed to M. Haxworth. File contains design development drawings, photographic materials, and textual records.
File 41
1962-1964
Projet
AP018.S1.1984.PR03
Description:
This project series document the exterior restauration work of Toronto Union Station in Toronto from 1984-1985. The office identified the project number as 8405. This project consisted of restoration to the exterior of the train station commissioned by VIA Rail Canada Inc. This work was referred to as a clean up in the project documentation. Restauration work was done to the existing exterior stonework, colannades, screens and skylights. This project was referred to as Package A in the materials, with Package B representing a project for interior work (see project series AP018.S1.1984.PR01 in this fonds). This project is recorded through drawings, photographs and textual records dating from 1984-1985. The drawings are of earlier plans for the station, prepared by architects Ross & Macdonald and some by Public Works Canada. The textual records include correspondence, conference and site reports, contract data, construction documentation, financial records, interoffice letters.
1984-1985
Toronto Union Station, Exterior Cleaning of Facades and Colonnades, Toronto (1984-1985)
Actions:
AP018.S1.1984.PR03
Description:
This project series document the exterior restauration work of Toronto Union Station in Toronto from 1984-1985. The office identified the project number as 8405. This project consisted of restoration to the exterior of the train station commissioned by VIA Rail Canada Inc. This work was referred to as a clean up in the project documentation. Restauration work was done to the existing exterior stonework, colannades, screens and skylights. This project was referred to as Package A in the materials, with Package B representing a project for interior work (see project series AP018.S1.1984.PR01 in this fonds). This project is recorded through drawings, photographs and textual records dating from 1984-1985. The drawings are of earlier plans for the station, prepared by architects Ross & Macdonald and some by Public Works Canada. The textual records include correspondence, conference and site reports, contract data, construction documentation, financial records, interoffice letters.
Project
1984-1985
Projet
AP018.S1.1962.PR02
Description:
This project series documents the Bata Limited office building in Toronto from 1962-1965. The office identified the project number as 6243. This project consisted of a three-storey office building for the shoe company, Bata Limited, located at the corners of Eglington Avenue and Don Mills Road. The building consisted of a basement with mechanical equipment and storage, a first floor with waiting room, cafeteria, kitchen and conference rooms, and second and third floors with general office space. This pavilion style building had 27 tree-like columns lining the outside that the top two storeys rested upon. The interior had similar columns to carry the design inside the building. This project was celebrated as an iconic example of modern architecture in Canada. It has since been demolished. The project is recorded through construction drawings, which are mostly reprographic copies, dating from 1963-1964.
1963-1964
Bata Limited Office Building, Don Mills, Ontario (1962-1965)
Actions:
AP018.S1.1962.PR02
Description:
This project series documents the Bata Limited office building in Toronto from 1962-1965. The office identified the project number as 6243. This project consisted of a three-storey office building for the shoe company, Bata Limited, located at the corners of Eglington Avenue and Don Mills Road. The building consisted of a basement with mechanical equipment and storage, a first floor with waiting room, cafeteria, kitchen and conference rooms, and second and third floors with general office space. This pavilion style building had 27 tree-like columns lining the outside that the top two storeys rested upon. The interior had similar columns to carry the design inside the building. This project was celebrated as an iconic example of modern architecture in Canada. It has since been demolished. The project is recorded through construction drawings, which are mostly reprographic copies, dating from 1963-1964.
Project
1963-1964
photographies
ARCH268880
Description:
Contains photographic materials on 6 projects by Abalos & Herreros: - Paseo marítimo Torrevieja, AP164.S1.1999.D3 (4 slides: aerial views of the port); - Centro universitario en Mérida, AP164.S1.1999.D4 (39 slides: interior/exterior, close-up of structure, plans, model, and construction views); - Estación Zaragoza, AP164.S1.1999.D5 (59 slides: views of plans, model and presentation drawings); - El mirador: torre mixta en la bahía de Algeciras, AP164.S1.1999.D10 (58 slides: views of model, landscape, plans and maps); - Jardines Valdemingómez, AP164.S1.2000.D4 (53 slides: interior/exterior views, plans, and model); - Museo de la Banla? de Algendras? y el estrecho de Gibraltar (31 slides: plans).
between 1999 and 2001
Ring binder with photographic materials related to six projects by Abalos & Herreros
Actions:
ARCH268880
Description:
Contains photographic materials on 6 projects by Abalos & Herreros: - Paseo marítimo Torrevieja, AP164.S1.1999.D3 (4 slides: aerial views of the port); - Centro universitario en Mérida, AP164.S1.1999.D4 (39 slides: interior/exterior, close-up of structure, plans, model, and construction views); - Estación Zaragoza, AP164.S1.1999.D5 (59 slides: views of plans, model and presentation drawings); - El mirador: torre mixta en la bahía de Algeciras, AP164.S1.1999.D10 (58 slides: views of model, landscape, plans and maps); - Jardines Valdemingómez, AP164.S1.2000.D4 (53 slides: interior/exterior views, plans, and model); - Museo de la Banla? de Algendras? y el estrecho de Gibraltar (31 slides: plans).
photographies
between 1999 and 2001
dessins, documents textuels
DR1995:0252:1800-1929
Description:
includes loose textual records and 3 folders containing, correspondence, drawings, brochures, promotional material for Inter-Action Centre, minutes of meetings, progress chart, defects lists, estimates, office memoranda, views of interior and exterior of building, finishes schedule, regulations, time sheets, schedules, specifications, check list, and meeting notes
Loose textual records and 3 folders containing, correspondence
Actions:
DR1995:0252:1800-1929
Description:
includes loose textual records and 3 folders containing, correspondence, drawings, brochures, promotional material for Inter-Action Centre, minutes of meetings, progress chart, defects lists, estimates, office memoranda, views of interior and exterior of building, finishes schedule, regulations, time sheets, schedules, specifications, check list, and meeting notes
dessins, documents textuels
Projet
AP056.S1.1989.PR02
Description:
This project series documents interior design for Main Street of Hasbro Headquarters in Pawtucket, Rhode Island from 1989-1991. The office identified the project number as 8902. This project consisted of the interiors of the company's headquarters for an area of the building known as Main Street. This was the first in a series of projects that the firm would complete for the headquarters. The 300,000 square foot building was predominantly one-storey and located on the block between Saratoga, Grand, London and Newport Avenues. The three projects were known as Main Street, Phase 2A and Phase 2B. Phase 1 was completed in 1986 by Barton Myers Associates with Shirley Blumberg as partner-in-charge. These subsequent projects by KPMB were also headed by Shirley Blumberg and continued the initial style she had established in Phase 1. These projects saw the conversion of a historic brick and masonry mill into the company's new offices. The office structure was inspired by the layout of a Greek town, with a main street running through it. Main Street was a wide corridor which spanned the length of the building, acting as a central artery for activity. The corridor was flooded with natural light from the original saw tooth skylights on the ceiling and lantern-like offices lined the sides. Small rooms were positioned in the corridor, including the main conference room with a large curved wall, a reception area and two smaller conference rooms. Maple screens, translucent glass and steel were the prominent materials used for Main Street. The project is recorded through drawings dating from 1987-1988. These are mostly original drawings and include sketches, plans, sections, elevations, perspectives, details, and furniture drawings. Many of the plans focus on the design of the executive bathroom.
1989-1992
Hasbro Headquarters Main Street, Pawtucket, Rhode Island (1989-1991)
Actions:
AP056.S1.1989.PR02
Description:
This project series documents interior design for Main Street of Hasbro Headquarters in Pawtucket, Rhode Island from 1989-1991. The office identified the project number as 8902. This project consisted of the interiors of the company's headquarters for an area of the building known as Main Street. This was the first in a series of projects that the firm would complete for the headquarters. The 300,000 square foot building was predominantly one-storey and located on the block between Saratoga, Grand, London and Newport Avenues. The three projects were known as Main Street, Phase 2A and Phase 2B. Phase 1 was completed in 1986 by Barton Myers Associates with Shirley Blumberg as partner-in-charge. These subsequent projects by KPMB were also headed by Shirley Blumberg and continued the initial style she had established in Phase 1. These projects saw the conversion of a historic brick and masonry mill into the company's new offices. The office structure was inspired by the layout of a Greek town, with a main street running through it. Main Street was a wide corridor which spanned the length of the building, acting as a central artery for activity. The corridor was flooded with natural light from the original saw tooth skylights on the ceiling and lantern-like offices lined the sides. Small rooms were positioned in the corridor, including the main conference room with a large curved wall, a reception area and two smaller conference rooms. Maple screens, translucent glass and steel were the prominent materials used for Main Street. The project is recorded through drawings dating from 1987-1988. These are mostly original drawings and include sketches, plans, sections, elevations, perspectives, details, and furniture drawings. Many of the plans focus on the design of the executive bathroom.
Project
1989-1992
Sous-série
AP178.S1.2002.PR05.SS1
Description:
This project subseries documents the Parque de Vidago Complexo Termal e Hotel Palace in Vidago, Portugal. While the records were held in the office’s archives this project was assigned the number 49/00. The office assigned the date 2002 to this project. The project consisted of major renovations to update and modernize the Vidago Palace Hotel, originally opened in 1910, and the addition of a new thermal spa. Architects José Pedro Lopes Vieira and Diogo Rosa Lã were responsible for the interior decoration of the Palace Hotel, while Siza designed the Spa. The full or partial demolition of some parts of the hotel and nearby buildings was necessary to maintain the original character of the resort. In contrast to the historic hotel, the new spa was contemporary and minimalist with marble interiors. It included pools, Turkish baths, treatment and relaxation rooms, a gym, bars and meditation area. This project subseries is documented through drawings, photographic materials, study models and textual records dating from 2002-2012. These materials primarily document the spa but documentation for the surrounding site, Palace Hotel, Fonte Salus (spring), gatehouse and Serralves exhibition space is also included. The drawings are largely reprographic copies of printed CAD drawings and include sketches, studies, plans, details, sections, elevations, demolition drawings and mechanical, electrical and structural drawings. The textual records include correspondence, meeting minutes, studies, building programs, furniture and spa equipment documentation, budgets and contracts. A large amount of documentation on various electrical, structural and mechanical systems is also included. The photographic materials are mostly printed digital photos showing buildings across the site, pre and post construction work and reference images. There are also a number of photos, postcards and brochures showing historical images of the hotel.
2002-2012
Parque de Vidago, Complexo Termal e Hotel Palace [Vidago Palace Hotel and Spa], Vidago, Portugal (2002)
Actions:
AP178.S1.2002.PR05.SS1
Description:
This project subseries documents the Parque de Vidago Complexo Termal e Hotel Palace in Vidago, Portugal. While the records were held in the office’s archives this project was assigned the number 49/00. The office assigned the date 2002 to this project. The project consisted of major renovations to update and modernize the Vidago Palace Hotel, originally opened in 1910, and the addition of a new thermal spa. Architects José Pedro Lopes Vieira and Diogo Rosa Lã were responsible for the interior decoration of the Palace Hotel, while Siza designed the Spa. The full or partial demolition of some parts of the hotel and nearby buildings was necessary to maintain the original character of the resort. In contrast to the historic hotel, the new spa was contemporary and minimalist with marble interiors. It included pools, Turkish baths, treatment and relaxation rooms, a gym, bars and meditation area. This project subseries is documented through drawings, photographic materials, study models and textual records dating from 2002-2012. These materials primarily document the spa but documentation for the surrounding site, Palace Hotel, Fonte Salus (spring), gatehouse and Serralves exhibition space is also included. The drawings are largely reprographic copies of printed CAD drawings and include sketches, studies, plans, details, sections, elevations, demolition drawings and mechanical, electrical and structural drawings. The textual records include correspondence, meeting minutes, studies, building programs, furniture and spa equipment documentation, budgets and contracts. A large amount of documentation on various electrical, structural and mechanical systems is also included. The photographic materials are mostly printed digital photos showing buildings across the site, pre and post construction work and reference images. There are also a number of photos, postcards and brochures showing historical images of the hotel.
Project
2002-2012
dessins
Quantité:
25 File
ARCH46555
Description:
staff cafeteria, light fixture for Saskatchewan room, kitchen layouts, partial basement plan, banquette and chair for Cascade room, interior perspectives of Nova Scotia room, bathrooms, private dining rooms and beauty parlour, bathroom arrangements, telephone booths, bedroom floor plans, section through laundry area, elevator machinery room, T.C.A. office
Saskatchewan room, Cascade room, Nova Scotia room
Actions:
ARCH46555
Description:
staff cafeteria, light fixture for Saskatchewan room, kitchen layouts, partial basement plan, banquette and chair for Cascade room, interior perspectives of Nova Scotia room, bathrooms, private dining rooms and beauty parlour, bathroom arrangements, telephone booths, bedroom floor plans, section through laundry area, elevator machinery room, T.C.A. office
dessins
Quantité:
25 File