Projet
AP018.S1.1977.PR09
Description:
This project series documents the long term planning for the Bank of Montreal Central Computer Complex Two in Scarborough, Ontario from 1977-1997. The office identified the project number as 7710. This master plan, spanning the length of 20 years, outlined 4 phases of construction for the complex. The plan called for the construction of three buildings starting in 1977, with the addition of more buildings on the site over the following two decades. The proposal showed that each new building was to be joined to existing buildings by tunnels at each level. However, only three buildings were ever constructed on this site. The project is recorded through textual records and drawings dating from 1977-1978. The textual records consist of meeting minutes, consultant correspondence and site reports.
1977-1978
Bank of Montreal Central Computer Complex Two Master Plan, Scarborough, Ontario (1977-1997)
Actions:
AP018.S1.1977.PR09
Description:
This project series documents the long term planning for the Bank of Montreal Central Computer Complex Two in Scarborough, Ontario from 1977-1997. The office identified the project number as 7710. This master plan, spanning the length of 20 years, outlined 4 phases of construction for the complex. The plan called for the construction of three buildings starting in 1977, with the addition of more buildings on the site over the following two decades. The proposal showed that each new building was to be joined to existing buildings by tunnels at each level. However, only three buildings were ever constructed on this site. The project is recorded through textual records and drawings dating from 1977-1978. The textual records consist of meeting minutes, consultant correspondence and site reports.
Project
1977-1978
Projet
AP018.S1.1977.PR10
Description:
This project series documents interior refurbishments to the Ontario Association of Architects headquarters in Toronto from 1977-1978. The office identified the project number as 7711. This project consisted of changes to the carpeting, drapes and furniture in the building's lounge. However, this project was cancelled by the client due to the possibility of expanding the lounge in the near future. The headquarters had been designed by John C. Parkin's previous firm, John B. Parkin Associates, in the 1950s and was located at 50 Park Road. The project is recorded through correspondence and cost planning records dating from 1977-1978.
1977-1978
Ontario Association of Architects, Interior Refurbishment, Toronto (1977-1978)
Actions:
AP018.S1.1977.PR10
Description:
This project series documents interior refurbishments to the Ontario Association of Architects headquarters in Toronto from 1977-1978. The office identified the project number as 7711. This project consisted of changes to the carpeting, drapes and furniture in the building's lounge. However, this project was cancelled by the client due to the possibility of expanding the lounge in the near future. The headquarters had been designed by John C. Parkin's previous firm, John B. Parkin Associates, in the 1950s and was located at 50 Park Road. The project is recorded through correspondence and cost planning records dating from 1977-1978.
Project
1977-1978
Projet
AP018.S1.1978.PR01
Description:
This project series documents the design and construction of printing facilities for the Edmonton Sun in Edmonton, Alberta in 1978. The office identified the project number as 7801. The Edmonton Sun printing facility was commissioned by its parent company, The Toronto Sun Publishing Limited. This project consisted of a one-storey business process area connected to a three-storey service core. In the service core, the first level consisted of a truck dock, shipping and receiving, roll storage, ink room, washrooms, reel room and mail room. The second floor was designed for the press deck, a specialized area for actions relating to placing the plates on the printing press. The third floor was designated for mechanical services and bulk storage. This project also described future expansions of the facility to include more roll storage, more press lines, a larger mail room and connections to a future publishing office. This project is recorded through drawings and textual records dating from 1978-1979. All of the drawings are arranged within the textual materials and consist mostly of reprographic copies. The textual records include correspondence, conference reports, interoffice letters, specifications, the project proposal, and schedules.
1978-1979
The Toronto Sun Publishing Limited, Edmonton Sun Plant Facility, Edmonton, Alberta (1978)
Actions:
AP018.S1.1978.PR01
Description:
This project series documents the design and construction of printing facilities for the Edmonton Sun in Edmonton, Alberta in 1978. The office identified the project number as 7801. The Edmonton Sun printing facility was commissioned by its parent company, The Toronto Sun Publishing Limited. This project consisted of a one-storey business process area connected to a three-storey service core. In the service core, the first level consisted of a truck dock, shipping and receiving, roll storage, ink room, washrooms, reel room and mail room. The second floor was designed for the press deck, a specialized area for actions relating to placing the plates on the printing press. The third floor was designated for mechanical services and bulk storage. This project also described future expansions of the facility to include more roll storage, more press lines, a larger mail room and connections to a future publishing office. This project is recorded through drawings and textual records dating from 1978-1979. All of the drawings are arranged within the textual materials and consist mostly of reprographic copies. The textual records include correspondence, conference reports, interoffice letters, specifications, the project proposal, and schedules.
Project
1978-1979
Projet
AP018.S1.1980.PR01
Description:
This project series documents a parking structure designed for an office complex located at 1500 Don Mills Road in North York, Ontario from 1980-1982. The office identified the project number as 8001. The project consisted of a ten-storey parking garage that could fit 1,997 vehicles. In 1976, Parkin Architects Planners began work on two phases of development for a property located at 1500 Don Mills for their client Marathon Realty. Phase I consisted of an office building. The parking structure, was planned for Phase II, along with a second office building. It is not clear from the materials in this project series whether the structure was ever built. The project is recorded through drawings and textual records dating from 1980-1982. The drawings include site plans, typical level plans, and studies. The textual records include a project proposal, correspondence, financial records, and a conference report.
1980-1982
Parking Structure, 1500 Don Mills Road, North York, Ontario (1980)
Actions:
AP018.S1.1980.PR01
Description:
This project series documents a parking structure designed for an office complex located at 1500 Don Mills Road in North York, Ontario from 1980-1982. The office identified the project number as 8001. The project consisted of a ten-storey parking garage that could fit 1,997 vehicles. In 1976, Parkin Architects Planners began work on two phases of development for a property located at 1500 Don Mills for their client Marathon Realty. Phase I consisted of an office building. The parking structure, was planned for Phase II, along with a second office building. It is not clear from the materials in this project series whether the structure was ever built. The project is recorded through drawings and textual records dating from 1980-1982. The drawings include site plans, typical level plans, and studies. The textual records include a project proposal, correspondence, financial records, and a conference report.
Project
1980-1982
Projet
AP018.S1.1978.PR06
Description:
This project series documents the conceptual site planning for easterly and westerly auxilary lands on the University of Ottawa campus for the Ottawa Health Sciences Centre from 1978-1979. The office identified the project number as 7808. The Ottawa Heath Sciences Complex, a vast hospital network encompassing institutions across the city, hired Parkin Architects Planners in 1971 to design and construct University of Ottawa buildings within the network. These campus buildings were located in the Alta Vista neighbourhood and are referred to as the Health Sciences Centre. This project consists of the conceptual site planning for that Centre. The project is recorded through drawings and textual records consisting of proposal packages, correspondence, conference reports, and detail planning dating from 1973-1979.
1973-1982
Ottawa Health Sciences Centre, Conceptual Site Planning Easterly and Westerly Auxiliary Lands, Ottawa, Ontario (1978-1979)
Actions:
AP018.S1.1978.PR06
Description:
This project series documents the conceptual site planning for easterly and westerly auxilary lands on the University of Ottawa campus for the Ottawa Health Sciences Centre from 1978-1979. The office identified the project number as 7808. The Ottawa Heath Sciences Complex, a vast hospital network encompassing institutions across the city, hired Parkin Architects Planners in 1971 to design and construct University of Ottawa buildings within the network. These campus buildings were located in the Alta Vista neighbourhood and are referred to as the Health Sciences Centre. This project consists of the conceptual site planning for that Centre. The project is recorded through drawings and textual records consisting of proposal packages, correspondence, conference reports, and detail planning dating from 1973-1979.
Project
1973-1982
Projet
AP018.S1.1972.PR14
Description:
This project series documents studies for the medical clinic building at the Etobicoke General Hospital site in Etobicoke, Ontario from 1972-1973. The office identified the project number as 7219. At the same time that Parkin Architects Planners was constructing the Etobicoke General Hospital, they began working on this project, an adjacent medical clinic that would be attached to the hospital via tunnel. This project proposed an 80 suite medical centre to be built to the south-west of the hospital. However, eventually the location of the building was moved and the project was given a new project number by the office. The building was eventually constructed under the new project number which is also documented in this fonds (see project series AP018.S1.1974.PR22 for these records). The project is recorded through drawings and textual records dating from 1972-1973. The majority of drawings are reprographic copies that show site plans, parking studies, floor plans and elevations. Textual records include questionnaires administered to the tenants (doctors and medical departments) regarding their unique office needs.
1972-1973
Etobicoke General Hospital, Medical Office Building, Etobicoke, Ontario (1972-1973)
Actions:
AP018.S1.1972.PR14
Description:
This project series documents studies for the medical clinic building at the Etobicoke General Hospital site in Etobicoke, Ontario from 1972-1973. The office identified the project number as 7219. At the same time that Parkin Architects Planners was constructing the Etobicoke General Hospital, they began working on this project, an adjacent medical clinic that would be attached to the hospital via tunnel. This project proposed an 80 suite medical centre to be built to the south-west of the hospital. However, eventually the location of the building was moved and the project was given a new project number by the office. The building was eventually constructed under the new project number which is also documented in this fonds (see project series AP018.S1.1974.PR22 for these records). The project is recorded through drawings and textual records dating from 1972-1973. The majority of drawings are reprographic copies that show site plans, parking studies, floor plans and elevations. Textual records include questionnaires administered to the tenants (doctors and medical departments) regarding their unique office needs.
Project
1972-1973
dessins
DR1987:0017
ingénierie
first half of the 19th century
Elevation and plan for a suspension bridge over the Cecina River, Tuscany
Actions:
DR1987:0017
dessins
first half of the 19th century
ingénierie
Projet
AP018.S1.1979.PR12
Description:
This project series documents additions and alterations made to the offices of law firm Davies, Ward and Beck on the 47th floor of Commerce Court in Toronto from 1979-1981. The office identified the project number as 7912. This project consisted of a new coffee room, changes to doors, revisions of power and telephone outlets, and revisions of the air exhaust system in the conference room, among others. This project is also referred to as Expansion to 48th Floor in the documentation, although the revisions mentioned were largely implemented on the 47th floor. It is likely that the expansion to the 48th floor planning began under this project number but was fully realized under a future project number (project series AP018.S1.1981.PR04 in this fonds). The project is recorded through drawings and textual records dating from 1979-1983. The majority of the drawings are reprographic copies of as built and construction drawings that are arranged within the textual documentation. The textual records include correspondence and meeting minutes with contractors, financial records, change orders, supplementary instructions and mechanical specifications.
1979-1983
Offices of Davies, Ward and Beck, Additions and Alterations, 47th Floor Commerce Court, Toronto (1979-1981)
Actions:
AP018.S1.1979.PR12
Description:
This project series documents additions and alterations made to the offices of law firm Davies, Ward and Beck on the 47th floor of Commerce Court in Toronto from 1979-1981. The office identified the project number as 7912. This project consisted of a new coffee room, changes to doors, revisions of power and telephone outlets, and revisions of the air exhaust system in the conference room, among others. This project is also referred to as Expansion to 48th Floor in the documentation, although the revisions mentioned were largely implemented on the 47th floor. It is likely that the expansion to the 48th floor planning began under this project number but was fully realized under a future project number (project series AP018.S1.1981.PR04 in this fonds). The project is recorded through drawings and textual records dating from 1979-1983. The majority of the drawings are reprographic copies of as built and construction drawings that are arranged within the textual documentation. The textual records include correspondence and meeting minutes with contractors, financial records, change orders, supplementary instructions and mechanical specifications.
Project
1979-1983
Projet
AP018.S1.1982.PR12
Description:
The project series documents a feasibility study for new offices of the Canadian Red Cross Society at the corner of Jarvis Street and Wellesley Street, in Toronto, Ontario. The office identified the project number as 8213. The project is recorded through textual records such as correspondence, site survey, and project management plan, dated between 1982-1983.
1982-1983
Canadian Red Cross Society, Feasibility Study, Toronto (1982-1983)
Actions:
AP018.S1.1982.PR12
Description:
The project series documents a feasibility study for new offices of the Canadian Red Cross Society at the corner of Jarvis Street and Wellesley Street, in Toronto, Ontario. The office identified the project number as 8213. The project is recorded through textual records such as correspondence, site survey, and project management plan, dated between 1982-1983.
Project
1982-1983
Projet
AP018.S1.1978.PR15
Description:
This project series documents the interior design of the Bank of Montreal Central Computer Complex Two in Scarborough, Ontario from 1978-1980. The office identified the project number as 7827. The project consists of the research, planning, and design of the interiors of the complex. The project is recorded through textual records and drawings dating from 1978-1980. The drawings show interior layouts and details, while the textual records contain schedules, inventories, correspondence, budgets, reports, tender packages, and detail research and planning records. Box AP018.S1.1978.PR15.001 contains an index to the textual records, which was created by the office.
1978-1980
Bank of Montreal Central Computer Complex Two, Interior Design Coordination, Scarborough, Ontario (1978-1980)
Actions:
AP018.S1.1978.PR15
Description:
This project series documents the interior design of the Bank of Montreal Central Computer Complex Two in Scarborough, Ontario from 1978-1980. The office identified the project number as 7827. The project consists of the research, planning, and design of the interiors of the complex. The project is recorded through textual records and drawings dating from 1978-1980. The drawings show interior layouts and details, while the textual records contain schedules, inventories, correspondence, budgets, reports, tender packages, and detail research and planning records. Box AP018.S1.1978.PR15.001 contains an index to the textual records, which was created by the office.
Project
1978-1980