dessins
AP178.S1.1988.PR07.SS9.012.2
Description:
Original file title : Edificio no 4. Zona Sinistrada do Chiado. projecto de execução. Revisão 13 nov. 1996. This file includes working drawings of the canopy, courtyard handrails, joints, interior openings, stairs, and acoustic panels.
November 13, 1996
Revised working drawings, Recuperaçäo do Edifício dos Grandes Armazéns, Bloco C, Reconstrução do Chiado, Lisbon (folder 2 of 4)
Actions:
AP178.S1.1988.PR07.SS9.012.2
Description:
Original file title : Edificio no 4. Zona Sinistrada do Chiado. projecto de execução. Revisão 13 nov. 1996. This file includes working drawings of the canopy, courtyard handrails, joints, interior openings, stairs, and acoustic panels.
dessins
November 13, 1996
dessins
Quantité:
24 design development drawing(s)
DR1995:0236:030-053
Description:
diagrammatic interior elevations, diagrammatic plans showing layouts, site plans, some showing development stages, future expansion, and services, circulation plan, zoning plan, plan of acoustic and visual barriers, diagrammatic section, and axonometric view of site
Diagrammatic interior elevations, diagrammatic plans showing layouts
Actions:
DR1995:0236:030-053
Description:
diagrammatic interior elevations, diagrammatic plans showing layouts, site plans, some showing development stages, future expansion, and services, circulation plan, zoning plan, plan of acoustic and visual barriers, diagrammatic section, and axonometric view of site
dessins
Quantité:
24 design development drawing(s)
dessins
Quantité:
16 working drawing(s)
ARCH185999
Description:
Church - details of louvres, skylight, ambulatory floor, decorative acoustic walls, handrails at entrances, communion rail, kitchen table, lantern dome, stair railings, bell tower, baptistery, wood screen and partition, sacristy closets, sound chamber, wood screen returns, baptistery flooring design
Church - details of louvres, skylight, ambulatory floor
Actions:
ARCH185999
Description:
Church - details of louvres, skylight, ambulatory floor, decorative acoustic walls, handrails at entrances, communion rail, kitchen table, lantern dome, stair railings, bell tower, baptistery, wood screen and partition, sacristy closets, sound chamber, wood screen returns, baptistery flooring design
dessins
Quantité:
16 working drawing(s)
documents textuels
ARCH255929
Description:
15 files - correspondence concerning Department of External Affairs, audio-visual, consultants; transmittals, submittal data, shop drawing transmittals, electrical, HVAC, fire alarms, water treatment submittal, surveys, soils, kitchen, specifications, plumbing, insulation, interiors, accessories, schedules, paint and flooring samples, doors and anchorage, acoustic ceiling
1986-1988
Correspondence concerning Department of External Affairs, audio-visual, consultants, transmittals
Actions:
ARCH255929
Description:
15 files - correspondence concerning Department of External Affairs, audio-visual, consultants; transmittals, submittal data, shop drawing transmittals, electrical, HVAC, fire alarms, water treatment submittal, surveys, soils, kitchen, specifications, plumbing, insulation, interiors, accessories, schedules, paint and flooring samples, doors and anchorage, acoustic ceiling
documents textuels
1986-1988
Projet
AP207.S1.1966.PR01
Description:
This project series documents the sound performance "Tunnel Sonoro." It was created in 1966, when Pettena was experimenting with music and worked with musicians. "Tunnel Sonoro" was one of the results of his collaborations with musicians. This project consists of a sound performance during which a performer, entirely dressed in a metallic bodysuit, crosses a narrow tunnel "in which, by scrapping against the surfaces, their body 'played' the environment, imitating the sound of the wind [...]." [1] The performance was conceived for the (Musica Elettronica Viva), a live acoustic and electronic improvisational group from Rome. The project series contains a project description in Italian and in English, a reproduction of a publication from the Biennale di Firenze describing the project, and drawings of the tunnel and the metallic bodysuit. Source: [1] Marco Scotini, editor. Non-conscious architecture: Gianni Pettena, Sternberg Press, 2018, 235 pages. p. 98.
circa 1966-2018
Tunnel Sonoro [Sound Tunnel] (1966)
Actions:
AP207.S1.1966.PR01
Description:
This project series documents the sound performance "Tunnel Sonoro." It was created in 1966, when Pettena was experimenting with music and worked with musicians. "Tunnel Sonoro" was one of the results of his collaborations with musicians. This project consists of a sound performance during which a performer, entirely dressed in a metallic bodysuit, crosses a narrow tunnel "in which, by scrapping against the surfaces, their body 'played' the environment, imitating the sound of the wind [...]." [1] The performance was conceived for the (Musica Elettronica Viva), a live acoustic and electronic improvisational group from Rome. The project series contains a project description in Italian and in English, a reproduction of a publication from the Biennale di Firenze describing the project, and drawings of the tunnel and the metallic bodysuit. Source: [1] Marco Scotini, editor. Non-conscious architecture: Gianni Pettena, Sternberg Press, 2018, 235 pages. p. 98.
Project
circa 1966-2018
dessins
Quantité:
15 presentation drawing(s)
DR1995:0188:430-444
Description:
presentation drawings and some design development drawings for Camden Town proposal, including flow chart of design process, diagrammatic plans of units and typical uses with annotations, key plan, sections, and axonometric of grid with thermal and acoustic modulators, axonometric drawings and plans of screen wall and chair and table units, and axonometric drawings of exterior view
Presentation drawings and some design development drawings for Camden Town proposal
Actions:
DR1995:0188:430-444
Description:
presentation drawings and some design development drawings for Camden Town proposal, including flow chart of design process, diagrammatic plans of units and typical uses with annotations, key plan, sections, and axonometric of grid with thermal and acoustic modulators, axonometric drawings and plans of screen wall and chair and table units, and axonometric drawings of exterior view
dessins
Quantité:
15 presentation drawing(s)
dessins
Quantité:
29 working drawing(s)
ARCH186020
Description:
Rectory - floor plans, elevations, cross section, main entrance details, window and door details, kitchen details, brick arch re-inforcing, acoustic tile and light fixture layouts, vestibule wall details, dining room cupboards, rear balcony, furniture layout, alternative entrance details, ground floor alterations, stair stringer details, revised kitchen cabinet arrangement, typical floor tile pattern, front door, shelving, counter unit, revised storage cupboards, partial floor plans
Rectory - floor plans, elevations, cross section, details
Actions:
ARCH186020
Description:
Rectory - floor plans, elevations, cross section, main entrance details, window and door details, kitchen details, brick arch re-inforcing, acoustic tile and light fixture layouts, vestibule wall details, dining room cupboards, rear balcony, furniture layout, alternative entrance details, ground floor alterations, stair stringer details, revised kitchen cabinet arrangement, typical floor tile pattern, front door, shelving, counter unit, revised storage cupboards, partial floor plans
dessins
Quantité:
29 working drawing(s)
DR1992:0004
Description:
- This drawing is similar to several drawings for Museum for a Small City in groups DR1990:0030:001-031 and DR1994:0007:001 - DR1994:0007:098 R/V. The angle and attachment of the acoustic ceiling in drawing DR1992:0004 is evident in two elevations for the museum (DR1994:0007:050 and DR1994:0007:051) and in several interior perspectives for the auditorium (DR1994:0007:088 - DR1994:0007:095).
architecture
ca. 1942
Sketch elevation for a theatre with suspended acoustic ceiling
Actions:
DR1992:0004
Description:
- This drawing is similar to several drawings for Museum for a Small City in groups DR1990:0030:001-031 and DR1994:0007:001 - DR1994:0007:098 R/V. The angle and attachment of the acoustic ceiling in drawing DR1992:0004 is evident in two elevations for the museum (DR1994:0007:050 and DR1994:0007:051) and in several interior perspectives for the auditorium (DR1994:0007:088 - DR1994:0007:095).
architecture
Projet
AP018.S1.1979.PR02
Description:
This project series documents renovations to the restaurant, lobby, and offices at the Art Gallery of Ontario (AGO) in Toronto in 1979. The office identified the project number as 7902. The project consisted of renovations to the existing AGO Grange Court Restaurant and its kitchen including an increased seating capacity, additional shelving, acoustic improvements, and a larger waiting area. Although this project title, found in the materials, reflects only restaurant renovations, the project also consisted of renovations to the education offices and gallery lobby. Beginning in 1969, Parkin’s firm was hired as the head architects for the AGO’s massive expansion program that would span more than a decade. This is one project relating to the expansion of the art gallery. It should be noted that while AGO project contracts were originally given to John B. Parkin Associates, John C. Parkin continued the project under his new firm, Parkin Architects Planners, after parting ways with partner John B. Parkin in 1971. The project is recorded through restaurant drawings, restaurant photographs, and textual records dating from 1978-1980. The textual records consist of progress billing invoices for the restaurant and education offices, client correspondence, and a stipulated price contract.
1978-1980
Art Gallery of Ontario, Renovations to Restaurant and Kitchen, Toronto (1979)
Actions:
AP018.S1.1979.PR02
Description:
This project series documents renovations to the restaurant, lobby, and offices at the Art Gallery of Ontario (AGO) in Toronto in 1979. The office identified the project number as 7902. The project consisted of renovations to the existing AGO Grange Court Restaurant and its kitchen including an increased seating capacity, additional shelving, acoustic improvements, and a larger waiting area. Although this project title, found in the materials, reflects only restaurant renovations, the project also consisted of renovations to the education offices and gallery lobby. Beginning in 1969, Parkin’s firm was hired as the head architects for the AGO’s massive expansion program that would span more than a decade. This is one project relating to the expansion of the art gallery. It should be noted that while AGO project contracts were originally given to John B. Parkin Associates, John C. Parkin continued the project under his new firm, Parkin Architects Planners, after parting ways with partner John B. Parkin in 1971. The project is recorded through restaurant drawings, restaurant photographs, and textual records dating from 1978-1980. The textual records consist of progress billing invoices for the restaurant and education offices, client correspondence, and a stipulated price contract.
Project
1978-1980
dessins
Quantité:
21 presentation drawing(s)
DR1995:0188:241-261
Description:
presentation drawings, possibly some for publication, including table of electrical and mechanical needs, perspective sketches, plans, sections with annotations, schematic sections of basic units and control systems for the Pilot Project, exterior perspective, plan, sections, axonometric drawings showing thermal and acoustic systems, site plan at Mill Meads, exterior views, structural details, site plan and flow chart for the Camden Town proposal, and site plans for a children's playground at Stratford E.15
Presentation drawings, possibly some for publication
Actions:
DR1995:0188:241-261
Description:
presentation drawings, possibly some for publication, including table of electrical and mechanical needs, perspective sketches, plans, sections with annotations, schematic sections of basic units and control systems for the Pilot Project, exterior perspective, plan, sections, axonometric drawings showing thermal and acoustic systems, site plan at Mill Meads, exterior views, structural details, site plan and flow chart for the Camden Town proposal, and site plans for a children's playground at Stratford E.15
dessins
Quantité:
21 presentation drawing(s)