photographies
AP056.S1.1988.PR04.058
circa 1994
Photographs of finished interiors, The Design Exchange, Toronto
Actions:
AP056.S1.1988.PR04.058
photographies
circa 1994
dessins
AP075.S1.1995.PR01.002
architecture de paysage
1997
Presentation drawings for the Rotman Residence, Toronto, Ontario
Actions:
AP075.S1.1995.PR01.002
dessins
1997
architecture de paysage
documents textuels
AP075.S1.1990.PR07.003
1990
documents textuels
1990
documents textuels
AP075.S1.1990.PR07.004
Description:
"research"
1990
Research for the Ballet Opera House, Toronto, Ontario
Actions:
AP075.S1.1990.PR07.004
Description:
"research"
documents textuels
1990
documents textuels
AP075.S1.1990.PR07.009
1990
documents textuels
1990
Projet
AP018.S1.1979.PR03
Description:
This project series documents the design and construction of the Bell Trinity Square Administration Building in Toronto from 1979-1984. The office identified this project as 7903. The building, commissioned by Bell Canada, was constructed at the corner of Bay Street and Albert Street. The building is made up of 2 towers joined by an atrium. The project also included construction of several tunnels to connect the building with neighbouring city hall and the Eaton Centre. The project is recorded through original drawings, reprographic copies, presentation boards, construction photographs, and textual records dating from 1978-1985. The textual records show client and consultant correspondence, technical specifications for contractors, site reports, meeting minutes, contemplated change orders for design and technical details, and project budgets and finances.
1978-1985
Bell Trinity Square Administration Building, Toronto (1979-1984)
Actions:
AP018.S1.1979.PR03
Description:
This project series documents the design and construction of the Bell Trinity Square Administration Building in Toronto from 1979-1984. The office identified this project as 7903. The building, commissioned by Bell Canada, was constructed at the corner of Bay Street and Albert Street. The building is made up of 2 towers joined by an atrium. The project also included construction of several tunnels to connect the building with neighbouring city hall and the Eaton Centre. The project is recorded through original drawings, reprographic copies, presentation boards, construction photographs, and textual records dating from 1978-1985. The textual records show client and consultant correspondence, technical specifications for contractors, site reports, meeting minutes, contemplated change orders for design and technical details, and project budgets and finances.
Project
1978-1985
DR1985:0728
ca. 1912
DR1985:0739
ca. 1912
DR1985:0741
ca. 1912
DR1985:0743
ca. 1912