PH1988:0426:098
1929
PH1988:0426:099
April 13, 1929
PH1988:0426:100
ca. 1934
PH1988:0426:101
1929-1930
PH1988:0426:102
ca. 1934
PH1988:0426:103
ca. 1934
PH1988:0426:104
ca. 1934
PH1988:0426:107
ca. 1934
PH1988:0426:108
1905
Projet
Rink
AP144.S2.D160
Description:
File documents a consultancy project related to the Channel Tunnel Rail Link (CTRL) running from London to Folkestone, England. Price was commissioned to work in conjunction with engineering and environmental teams to provide input to the aesthetic design of major structures located along the CTRL route. A significant part of the work done on the project relates to a proposal to use a bridge rather than a tunnel on the section of the link crossing the Thames. The bridge would have been built between Gravesend, Kent and Tilbury, Thurrock. Material in this file was produced between 1986 and 1997, but predominantly in 1992. File contains conceptual drawings and textual records.
1986-1997, predominant 1992
Rink
Actions:
AP144.S2.D160
Description:
File documents a consultancy project related to the Channel Tunnel Rail Link (CTRL) running from London to Folkestone, England. Price was commissioned to work in conjunction with engineering and environmental teams to provide input to the aesthetic design of major structures located along the CTRL route. A significant part of the work done on the project relates to a proposal to use a bridge rather than a tunnel on the section of the link crossing the Thames. The bridge would have been built between Gravesend, Kent and Tilbury, Thurrock. Material in this file was produced between 1986 and 1997, but predominantly in 1992. File contains conceptual drawings and textual records.
File 160
1986-1997, predominant 1992