dessins
DR1999:0045:037
circa 1989-1990
dessins
circa 1989-1990
dessins
DR1999:0045:038
circa 1989-1990
dessins
circa 1989-1990
dessins
DR1999:0045:039
circa 1989-1990
dessins
circa 1989-1990
dessins
Quantité:
24 working drawing(s)
ARCH253014
dessins
Quantité:
24 working drawing(s)
dessins
Quantité:
8 reprographic copy(ies)
ARCH194448
dessins
Quantité:
8 reprographic copy(ies)
livres
ARCH158359
1974
livres
1974
Projet
AP013.S1.D7
Description:
File documents an executed project for additions, alterations and subway to the Château Laurier Hotel for the Ottawa Terminal Railway Co. in Ottawa, Ontario. Material in this file was produced between 1910 and 1912. File contains working and design development drawings.
1910-1912
Additions, Alterations and Subway for the Château Laurier Hotel, Ottawa, Ontario
Actions:
AP013.S1.D7
Description:
File documents an executed project for additions, alterations and subway to the Château Laurier Hotel for the Ottawa Terminal Railway Co. in Ottawa, Ontario. Material in this file was produced between 1910 and 1912. File contains working and design development drawings.
Project
1910-1912
DR1974:0002:003:093
architecture
July 1854
Partial elevation and wall section for the principal façade indicating the form of the rough cut stone, Hôtel Soltykoff
Actions:
DR1974:0002:003:093
architecture
DR1974:0002:006:015
architecture
before 1 April 1861
Ground floor plan for the "pavillon nord", including a detail of the "plancher de l'office" for Hôtel Sauvage, Paris
Actions:
DR1974:0002:006:015
architecture
PH2019:0002:086
1925-1927