archives
Niveau de description archivistique:
Fonds
Fonds Gene Summers
AP114
Résumé:
The Gene Summers fonds documents primarily the later part of Gene Summers' career as an architect, developer, artist and art collector. Summer's early work with the Office of Mies van der Rohe and C.F. Murphy Associates is summarily represented by notes, sketches and photographs.
1957 - 2004
Fonds Gene Summers
Actions:
AP114
Résumé:
The Gene Summers fonds documents primarily the later part of Gene Summers' career as an architect, developer, artist and art collector. Summer's early work with the Office of Mies van der Rohe and C.F. Murphy Associates is summarily represented by notes, sketches and photographs.
archives
Niveau de description archivistique:
Fonds
1957 - 2004
DR1994:0009:012
architecture
1945
Principal elevation for the Field House, Gymnasium and Natatorium complex
Actions:
DR1994:0009:012
architecture
DR1994:0009:016
architecture
1945
Principal elevation for the Field House, Gymnasium and Natatorium complex
Actions:
DR1994:0009:016
architecture
DR1994:0009:017
architecture
1945
Principal elevation for the Field House, Gymnasium and Natatorium complex
Actions:
DR1994:0009:017
architecture
DR1994:0009:043
architecture
1945
architecture
DR1994:0009:055
architecture
1945
Notes and calculations for spectator areas for the Gymnasium and Natatorium
Actions:
DR1994:0009:055
architecture
DR1994:0009:056
architecture
1945
architecture
audio
Quantité:
13 Audio cassette
Audiocassette
DR2004:1372
Description:
Includes 12 audio cassettes: 'Profile' BBC Radio 4. 14/2/85 Larry Whitty Side A.; Norman Willis - Poetry - 8.12.86; Cedric Price - Technology is the Answer but what is the Q? Pidgeon Audio Visual; Broken Muse; Notes on Trafalgar Job 11 March + April 1982; E.B. - L.B.C. Broadcast, Norman Willis - White Room; AA/CP Summer Breeze; Crowded Hours BBC3 Cedric Price - Master Copy B; Norman Willis Tape; Some thought on CP Thesis Sheffield Dec 80; Maxwell Fry - Memorial Service, Westminster Abbey 24.11.87 (copy No. 1); Maxwell Fry - Memorial Service, Westminster Abbey 24.11.87 (copy No. 2); BBC Home Lee Valley Scheme - August 29 (One track 3³/4");
1977-1987
Audiocassette
Actions:
DR2004:1372
Description:
Includes 12 audio cassettes: 'Profile' BBC Radio 4. 14/2/85 Larry Whitty Side A.; Norman Willis - Poetry - 8.12.86; Cedric Price - Technology is the Answer but what is the Q? Pidgeon Audio Visual; Broken Muse; Notes on Trafalgar Job 11 March + April 1982; E.B. - L.B.C. Broadcast, Norman Willis - White Room; AA/CP Summer Breeze; Crowded Hours BBC3 Cedric Price - Master Copy B; Norman Willis Tape; Some thought on CP Thesis Sheffield Dec 80; Maxwell Fry - Memorial Service, Westminster Abbey 24.11.87 (copy No. 1); Maxwell Fry - Memorial Service, Westminster Abbey 24.11.87 (copy No. 2); BBC Home Lee Valley Scheme - August 29 (One track 3³/4");
audio
Quantité:
13 Audio cassette
1977-1987
Projet
AP178.S1.2003.PR04
Description:
This project series documents the Hospital de Toledo in Toledo, Spain. While the records were held in the office’s archives this project was assigned the number 57/00. The office assigned the date 2003 to this project. The project site is located in the Santa María de Benquerencia district on a 250 000 square meter site. The project was a collaboration with the architect Antonio Sánchez Horneros. The building included 800 hospital rooms, 600 beds, and 30 operating theaters. The design for the operating theaters [rooms?] accounts for potential future expansions to accomodate new technologies. The interior arrangement of the building was organized in collaboration with medical persone in order to design the space for their needs. In 2018, the hospital is presently in construction. Documenting this project are studies and plans. Textual documentation includes project documentation.
2003-2008
Hospital de Toledo [Toledo hospital], Toledo, Spain (2003)
Actions:
AP178.S1.2003.PR04
Description:
This project series documents the Hospital de Toledo in Toledo, Spain. While the records were held in the office’s archives this project was assigned the number 57/00. The office assigned the date 2003 to this project. The project site is located in the Santa María de Benquerencia district on a 250 000 square meter site. The project was a collaboration with the architect Antonio Sánchez Horneros. The building included 800 hospital rooms, 600 beds, and 30 operating theaters. The design for the operating theaters [rooms?] accounts for potential future expansions to accomodate new technologies. The interior arrangement of the building was organized in collaboration with medical persone in order to design the space for their needs. In 2018, the hospital is presently in construction. Documenting this project are studies and plans. Textual documentation includes project documentation.
Project
2003-2008
L'enseignement de… São Paulo
Angelo Bucci, architecte et professeur à l’Université de São Paulo au Brésil, aborde les questions de la violence et de l’environnement en évolution à São Paulo, en quête de nouvelles formes urbaines. À São Paulo, la violence peut être vue comme gâchant l’expérience de la ville et, par conséquent, sapant la raison d’être du travail de l’architecte. La conférence porte sur(...)
22 avril 2010
L'enseignement de… São Paulo
Actions:
Description:
Angelo Bucci, architecte et professeur à l’Université de São Paulo au Brésil, aborde les questions de la violence et de l’environnement en évolution à São Paulo, en quête de nouvelles formes urbaines. À São Paulo, la violence peut être vue comme gâchant l’expérience de la ville et, par conséquent, sapant la raison d’être du travail de l’architecte. La conférence porte sur(...)