1
1
Correspondence from F.C. Russel to all district managers and agents of H.H. Roberston Co. Building Products describing the construction photographs of the Goodyear-Zeppelin airship factory and dock in Akron, Ohio, United States
Correspondence from F.C. Russel to all district managers and agents of H.H. Roberston Co. Building Products describing the construction photographs of the Goodyear-Zeppelin airship factory and dock in Akron, Ohio, United States
Personnes et institutions:
  • Unknown (photographer)
Titre:

Correspondence from F.C. Russel to all district managers and agents of H.H. Roberston Co. Building Products describing the construction photographs of the Goodyear-Zeppelin airship factory and dock in Akron, Ohio, United States

Date:

August 9, 1929

Classification:
photographies
Quantité / Type d’objet:
1 photograph(s)
Technique et médium:

Correspondence

Dimensions:

sheet: 27.2 x 21 cm

Numéro de référence:

PH1991:0262:001

Inscriptions:

stamped - in black ink, u.c.: "HH BUILDING PRODUCTS / ROBERTSON CO BUILDING PRODUCTS / PITTSBURG, PA." stamped - in purple ink, u.r.: "HH ROBERTSON CO / PHILADELPHIA / REC'D AUG 19 1929 / Referred to ................ / Ans'd ....................." inscribed - typewritten in black ink: "August 9, 1929 / S. P. Bulletin No. 121 / TO ALL DISTRICT MANAGERS AND AGENTS: / Attached to this bulletin are five "progress" pictures of the work on / the Goodyear-Zeppelin Airship Factory and Dock at Akron. / This set of pictures will, we believe, help you to convey to interested / prospects and customers an idea of the size of this great project, and the extent / and importance of our participation in it. / The first two pictures (in fact, all five) will help you to visualize / the unique design and magnitude of the steel framework, and the unusual methods / and equipment used in erecting it. / Note the size of the locomotive cranes. These cranes are used to hoist / the steel members in place in building up the side sections of the arches, and in / assembling the center sections before they are hoisted and set in place on the / side sections. / The first picture shows the huge counter weights used in hoisting the / center sections. Each center section weights 320 tons. The four counter weights / used in hoisting a center section weigh, collectively, 260 tons. The additional / 60-ton weight needed to hoist a center section in place is supplied by utilizing / the lifting power of four of the locomotive cranes--one hoocked on at each corner / of the arch. / In the first picture, a center section is shown resting on the ground; / the counter weights can be seen near the tops of the side sections. In the second / photograph, the center section has been lifted into place, and the counter weights / can be seen on the ground. Note, in the first and second photographs, and the "bents" / which hold up the side sections until the center section has been erected in place. / As the third picture shows, the arches are built up in alternative bays. / The intermediate steel work is filled in when the arches at either side have been / completed. The intermediate steel framework is hoisted in place by means of the / "traveller" shown on top of the arches in the third picture. / The third, fourth, and fifth photographs show the progress in the appli- / cation of our V-Beam sheets, as of July 23. Several of us inspected our work at / this stage and all agreed that it was a beautiful job. The V-Beam sheets present / a wonderfully fine appearance. / We shall be sending you more of these "progress" pictures from time to / time, as the work advances. We suggest htat you keep them all together in a / single binder. / Yours very truly, / F. C. Russell / Sales Promotion Manager / FCR:MMW"

Mention de crédit:
Collection Centre Canadien d'Architecture/
Canadian Centre for Architecture, Montréal
1
1

Inscrivez-vous pour recevoir de nos nouvelles

Courriel
Prénom
Nom
En vous abonnant, vous acceptez de recevoir notre infolettre et communications au sujet des activités du CCA. Vous pouvez vous désabonner en tout temps. Pour plus d’information, consultez notre politique de confidentialité ou contactez-nous.

Merci. Vous êtes maintenant abonné. Vous recevrez bientôt nos courriels.

Pour le moment, notre système n’est pas capable de mettre à jour vos préférences. Veuillez réessayer plus tard.

Vous êtes déjà inscrit avec cette adresse électronique. Si vous souhaitez vous inscrire avec une autre adresse, merci de réessayer.

Cete adresse courriel a été définitivement supprimée de notre base de données. Si vous souhaitez vous réabonner avec cette adresse courriel, veuillez contactez-nous

Veuillez, s'il vous plaît, remplir le formulaire ci-dessous pour acheter:
[Title of the book, authors]
ISBN: [ISBN of the book]
Prix [Price of book]

Prénom
Nom de famille
Adresse (ligne 1)
Adresse (ligne 2) (optionnel)
Code postal
Ville
Pays
Province / État
Courriel
Téléphone (jour) (optionnel)
Notes

Merci d'avoir passé une commande. Nous vous contacterons sous peu.

Nous ne sommes pas en mesure de traiter votre demande pour le moment. Veuillez réessayer plus tard.

Classeur ()

Votre classeur est vide.

Adresse électronique:
Sujet:
Notes:
Veuillez remplir ce formulaire pour faire une demande de consultation. Une copie de cette liste vous sera également transmise.

Vos informations
Prénom:
Nom de famille:
Adresse électronique:
Numéro de téléphone:
Notes (optionnel):
Nous vous contacterons pour convenir d’un rendez-vous. Veuillez noter que des délais pour les rendez-vous sont à prévoir selon le type de matériel que vous souhaitez consulter, soit :"
  • — au moins 2 semaines pour les sources primaires (dessins et estampes, photographies, documents d’archives, etc.)
  • — au moins 48 heures pour les sources secondaires (livres, périodiques, dossiers documentaires, etc.)
...