PH1980:0498
architecture, ingénierie
1950
architecture, ingénierie
PH1979:0227:008
Le Rond. Les Travaux Publics de l'Amerique du Nord. Pont des marchands.
Actions:
PH1979:0227:008
PH1979:0227:004
Le Rond. Les Travaux Publics de l'Amerique Du Nord. Pont de Poughkeepsie.
Actions:
PH1979:0227:004
photographies
ARCH193294
Description:
Piers, concrete abutments, cofferdams, falsework, formwork, concrete work, winter housing, piles, employees; photos of official opening with political dignitaries (June 4, 1960).
entre avril 1958 et mars 1959
Album de photographies relatives au pont Hugh-John-Flemming, Hartland, Nouveau-Brunswick
Actions:
ARCH193294
Description:
Piers, concrete abutments, cofferdams, falsework, formwork, concrete work, winter housing, piles, employees; photos of official opening with political dignitaries (June 4, 1960).
photographies
entre avril 1958 et mars 1959
photographies
ARCH193302
Description:
Caisson drilling, cofferdam, concrete trucks, demolition of Johnson residence (Senneville), drill bits, churn drilling, falsework, test beams, piers, launchers, booms, beams, runways.
entre mars et août 1963
Album de photographies relatives au pont de l'Île-aux-Tourtes, Senneville, Québec
Actions:
ARCH193302
Description:
Caisson drilling, cofferdam, concrete trucks, demolition of Johnson residence (Senneville), drill bits, churn drilling, falsework, test beams, piers, launchers, booms, beams, runways.
photographies
entre mars et août 1963
photographies
ARCH193303
Description:
Lauches, girders (concrete pre-stress), formwork, cofferdams (41 piers on bridge), concreting scow, girder going into place, piers, pouring concrete.
entre août et octobre 1963
Album de photographies relatives au pont de l'Île-aux-Tourtes, Senneville, Québec
Actions:
ARCH193303
Description:
Lauches, girders (concrete pre-stress), formwork, cofferdams (41 piers on bridge), concreting scow, girder going into place, piers, pouring concrete.
photographies
entre août et octobre 1963
photographies
ARCH193304
Description:
Piers, cantilever, scows, launchers, blasting ice, cranes, inside photos of coffer dams, aerials of piers in place, construction of cantilever, bridge partially finished, beam or scow ready to be launched, beam being put into place.
entre octobre 1963 et janvier 1964, avril 1964
Album de photographies relatives au pont de l'Île-aux-Tourtes, Senneville, Québec
Actions:
ARCH193304
Description:
Piers, cantilever, scows, launchers, blasting ice, cranes, inside photos of coffer dams, aerials of piers in place, construction of cantilever, bridge partially finished, beam or scow ready to be launched, beam being put into place.
photographies
entre octobre 1963 et janvier 1964, avril 1964
photographies
ARCH193306
Description:
Cribs, employees, official visits; tunnel section built in place for 1500 ft.; end closed; removed cofferdam, flooded; floating the caissons, flooding progress, dikes, plug blasts, putting ballast in, pre-stress cables, scows, divers; Hydro Québec dredges, scows, cable and anchors (32,000 tons each), anchors, suspensions cables, divers, sand jetting equipment. Also: Design Program for Placing of Elements, Data on Engineering.
entre mai et septembre 1964
Album de photographies relatives au pont-tunnel Louis-Hippolyte-Lafontaine, Boucherville, Québec
Actions:
ARCH193306
Description:
Cribs, employees, official visits; tunnel section built in place for 1500 ft.; end closed; removed cofferdam, flooded; floating the caissons, flooding progress, dikes, plug blasts, putting ballast in, pre-stress cables, scows, divers; Hydro Québec dredges, scows, cable and anchors (32,000 tons each), anchors, suspensions cables, divers, sand jetting equipment. Also: Design Program for Placing of Elements, Data on Engineering.
photographies
entre mai et septembre 1964
photographies
ARCH193307
Description:
Cribs, employees, official visits; tunnel section built in place for 1500 ft.; end closed; removed cofferdam, flooded; floating the caissons, flooding progress, dikes, plug blasts, putting ballast in, pre-stress cables, scows, divers; Hydro Québec dredges, scows, cable and anchors (32,000 tons each), anchors, suspensions cables, divers, sand jetting equipment. Also: Design Program for Placing of Elements, Data on Engineering.
entre octobre 1964 à mai 1965
Album de photographies relatives au pont-tunnel Louis-Hippolyte-Lafontaine, Boucherville, Québec
Actions:
ARCH193307
Description:
Cribs, employees, official visits; tunnel section built in place for 1500 ft.; end closed; removed cofferdam, flooded; floating the caissons, flooding progress, dikes, plug blasts, putting ballast in, pre-stress cables, scows, divers; Hydro Québec dredges, scows, cable and anchors (32,000 tons each), anchors, suspensions cables, divers, sand jetting equipment. Also: Design Program for Placing of Elements, Data on Engineering.
photographies
entre octobre 1964 à mai 1965
photographies
ARCH193308
Description:
Cribs, employees, official visits; tunnel section built in place for 1500 ft.; end closed; removed cofferdam, flooded; floating the caissons, flooding progress, dikes, plug blasts, putting ballast in, pre-stress cables, scows, divers; Hydro Québec dredges, scows, cable and anchors (32,000 tons each), anchors, suspensions cables, divers, sand jetting equipment. Also: Design Program for Placing of Elements, Data on Engineering.
entre janvier et août 1965
Album de photographies relatives au pont-tunnel Louis-Hippolyte-Lafontaine, Boucherville, Québec
Actions:
ARCH193308
Description:
Cribs, employees, official visits; tunnel section built in place for 1500 ft.; end closed; removed cofferdam, flooded; floating the caissons, flooding progress, dikes, plug blasts, putting ballast in, pre-stress cables, scows, divers; Hydro Québec dredges, scows, cable and anchors (32,000 tons each), anchors, suspensions cables, divers, sand jetting equipment. Also: Design Program for Placing of Elements, Data on Engineering.
photographies
entre janvier et août 1965