dessins
ARCH268450
ca. 1990
dessins
ca. 1990
photographies
ARCH268637
ca. 1995
photographies
ca. 1995
photographies
PH1978:0179:016
printed 1888
photographies
printed 1888
photographies
PH1978:0179:036
printed 1888
photographies
printed 1888
photographies
PH1978:0179:044
printed 1888
photographies
printed 1888
maquettes
ARCH269171
1999
maquettes
1999
maquettes
ARCH269174
1988
maquettes
1988
documents textuels
ARCH269257
Description:
Includes photographs as well.
September 1992
Project description for the Centro Cultural, Cobeña, Spain
Actions:
ARCH269257
Description:
Includes photographs as well.
documents textuels
September 1992
Projet
AP164.S1.1997.D11
Description:
The project series documents the commission for the municipal hall and main square of the city of Colmenarejo. One of the objectives of the project was to “strengthen civic life” (ARCH270975). The main square, Plaza de la Constitución, was organized around elements to be preserved and the town hall was seen as an extension of the square. The project was built. The firm identified this project as number 112. The Abalos & Herreros worked with Ángel Jaramillo, David Franco, Carolina González and Juan Gómez. Documenting the project are conceptual, design development and working drawings, project descriptions, correspondence, notes, budgets, estimates, certifications, invoices, reports, contracts, and reference, graphic, photographic and digital materials.
1993-2000, predominant 1997
Sala municipal y plaza en Colmenarejo, Spain (1997)
Actions:
AP164.S1.1997.D11
Description:
The project series documents the commission for the municipal hall and main square of the city of Colmenarejo. One of the objectives of the project was to “strengthen civic life” (ARCH270975). The main square, Plaza de la Constitución, was organized around elements to be preserved and the town hall was seen as an extension of the square. The project was built. The firm identified this project as number 112. The Abalos & Herreros worked with Ángel Jaramillo, David Franco, Carolina González and Juan Gómez. Documenting the project are conceptual, design development and working drawings, project descriptions, correspondence, notes, budgets, estimates, certifications, invoices, reports, contracts, and reference, graphic, photographic and digital materials.
Project
1993-2000, predominant 1997
Projet
AP178.S1.2003.PR04
Description:
This project series documents the Hospital de Toledo in Toledo, Spain. While the records were held in the office’s archives this project was assigned the number 57/00. The office assigned the date 2003 to this project. The project site is located in the Santa María de Benquerencia district on a 250 000 square meter site. The project was a collaboration with the architect Antonio Sánchez Horneros. The building included 800 hospital rooms, 600 beds, and 30 operating theaters. The design for the operating theaters [rooms?] accounts for potential future expansions to accomodate new technologies. The interior arrangement of the building was organized in collaboration with medical persone in order to design the space for their needs. In 2018, the hospital is presently in construction. Documenting this project are studies and plans. Textual documentation includes project documentation.
2003-2008
Hospital de Toledo [Toledo hospital], Toledo, Spain (2003)
Actions:
AP178.S1.2003.PR04
Description:
This project series documents the Hospital de Toledo in Toledo, Spain. While the records were held in the office’s archives this project was assigned the number 57/00. The office assigned the date 2003 to this project. The project site is located in the Santa María de Benquerencia district on a 250 000 square meter site. The project was a collaboration with the architect Antonio Sánchez Horneros. The building included 800 hospital rooms, 600 beds, and 30 operating theaters. The design for the operating theaters [rooms?] accounts for potential future expansions to accomodate new technologies. The interior arrangement of the building was organized in collaboration with medical persone in order to design the space for their needs. In 2018, the hospital is presently in construction. Documenting this project are studies and plans. Textual documentation includes project documentation.
Project
2003-2008