ARCH400788
1966-1968
Projet
AP013.S1.D28
Description:
File documents an unexecuted project for an office building in Winnipeg, Manitoba on Garry Street. Material in this file was produced between 1912 and 1914. File contains a survey drawing, working drawings, detail drawings, mechanical drawings, and electrical drawings.
1912-1914
Prudential Trust Building, Winnipeg, Manitoba
Actions:
AP013.S1.D28
Description:
File documents an unexecuted project for an office building in Winnipeg, Manitoba on Garry Street. Material in this file was produced between 1912 and 1914. File contains a survey drawing, working drawings, detail drawings, mechanical drawings, and electrical drawings.
Project
1912-1914
City of The Pas, Manitoba
PH2009:0005:034
architecture
1960
architecture
Projet
AP013.S1.D18
Description:
File documents an executed project for a railway hotel in Winnipeg, Manitoba on 222 Broadway Avenue. Material in this file was produced between 1910 and 1914. File contains survey drawings, preliminary drawings, working and design development drawings, miscellaneous drawings, detail and design development drawings, miscellaneous and detail drawings, detail drawings, mechanical drawings, and textual documents.
1910-1914
Fort Garry Hotel, Winnipeg, Manitoba
Actions:
AP013.S1.D18
Description:
File documents an executed project for a railway hotel in Winnipeg, Manitoba on 222 Broadway Avenue. Material in this file was produced between 1910 and 1914. File contains survey drawings, preliminary drawings, working and design development drawings, miscellaneous drawings, detail and design development drawings, miscellaneous and detail drawings, detail drawings, mechanical drawings, and textual documents.
Project
1910-1914
PH2009:0005:043
architecture
1962
architecture
PH2009:0005:040
architecture
1960
architecture
Projet
AP027.S1.D33
Description:
The material in this project series contains racist language. Please take care when viewing this material and seek help from trusted sources if needed. This project series documents a study on the relocation of the First Nations community of South Indian Lake in Manitoba. The community was relocated due to planned flooding that would be caused by the diversion of the Churchill River for a hydroelectric development. Part of the hydro project included works on Nelson River which would flood the area around the southeast shore of Southern Indian Lake. The study assessed the relocation site for the community and included a proposed plan which outlined economic, social, and educational programmes to be integrated along with the physical development of the region. The proposed plan was not implemented.
urbanisme
1966-1968
South Indian Lake, Manitoba (1966-1968)
Actions:
AP027.S1.D33
Description:
The material in this project series contains racist language. Please take care when viewing this material and seek help from trusted sources if needed. This project series documents a study on the relocation of the First Nations community of South Indian Lake in Manitoba. The community was relocated due to planned flooding that would be caused by the diversion of the Churchill River for a hydroelectric development. Part of the hydro project included works on Nelson River which would flood the area around the southeast shore of Southern Indian Lake. The study assessed the relocation site for the community and included a proposed plan which outlined economic, social, and educational programmes to be integrated along with the physical development of the region. The proposed plan was not implemented.
File 33
1966-1968
urbanisme
PH2009:0005:030
architecture
1954
architecture
documents textuels
ARCH253655
Description:
working papers
n.d.
documents textuels
n.d.
PH1987:0817:003
architecture
1883
architecture