Cribs, employees, official visits; tunnel section built in place for 1500 ft.; end closed; removed cofferdam, flooded; floating the caissons, flooding progress, dikes, plug blasts, putting ballast in, pre-stress cables, scows, divers; Hydro Québec dredges, scows, cable and anchors (32,000 tons each), anchors, suspensions cables, divers, sand jetting equipment. Also: Design Program for Placing of Elements, Data on Engineering.
entre octobre 1964 à mai 1965
Album de photographies relatives au pont-tunnel Louis-Hippolyte-Lafontaine, Boucherville, Québec
Actions:
ARCH193307
Description:
Cribs, employees, official visits; tunnel section built in place for 1500 ft.; end closed; removed cofferdam, flooded; floating the caissons, flooding progress, dikes, plug blasts, putting ballast in, pre-stress cables, scows, divers; Hydro Québec dredges, scows, cable and anchors (32,000 tons each), anchors, suspensions cables, divers, sand jetting equipment. Also: Design Program for Placing of Elements, Data on Engineering.
photographies
entre octobre 1964 à mai 1965
photographies
ARCH193308
Description:
Cribs, employees, official visits; tunnel section built in place for 1500 ft.; end closed; removed cofferdam, flooded; floating the caissons, flooding progress, dikes, plug blasts, putting ballast in, pre-stress cables, scows, divers; Hydro Québec dredges, scows, cable and anchors (32,000 tons each), anchors, suspensions cables, divers, sand jetting equipment. Also: Design Program for Placing of Elements, Data on Engineering.
entre janvier et août 1965
Album de photographies relatives au pont-tunnel Louis-Hippolyte-Lafontaine, Boucherville, Québec
Actions:
ARCH193308
Description:
Cribs, employees, official visits; tunnel section built in place for 1500 ft.; end closed; removed cofferdam, flooded; floating the caissons, flooding progress, dikes, plug blasts, putting ballast in, pre-stress cables, scows, divers; Hydro Québec dredges, scows, cable and anchors (32,000 tons each), anchors, suspensions cables, divers, sand jetting equipment. Also: Design Program for Placing of Elements, Data on Engineering.
photographies
entre janvier et août 1965
photographies
ARCH193309
Description:
Cribs, employees, official visits; tunnel section built in place for 1500 ft.; end closed; removed cofferdam, flooded; floating the caissons, flooding progress, dikes, plug blasts, putting ballast in, pre-stress cables, scows, divers; Hydro Québec dredges, scows, cable and anchors (32,000 tons each), anchors, suspensions cables, divers, sand jetting equipment. Also: Design Program for Placing of Elements, Data on Engineering.
mai 1965
Album de photographies relatives au pont-tunnel Louis-Hippolyte-Lafontaine, Boucherville, Québec
Actions:
ARCH193309
Description:
Cribs, employees, official visits; tunnel section built in place for 1500 ft.; end closed; removed cofferdam, flooded; floating the caissons, flooding progress, dikes, plug blasts, putting ballast in, pre-stress cables, scows, divers; Hydro Québec dredges, scows, cable and anchors (32,000 tons each), anchors, suspensions cables, divers, sand jetting equipment. Also: Design Program for Placing of Elements, Data on Engineering.
photographies
mai 1965
photographies
ARCH193310
Description:
Cribs, employees, official visits; tunnel section built in place for 1500 ft.; end closed; removed cofferdam, flooded; floating the caissons, flooding progress, dikes, plug blasts, putting ballast in, pre-stress cables, scows, divers; Hydro Québec dredges, scows, cable and anchors (32,000 tons each), anchors, suspensions cables, divers, sand jetting equipment. Also: Design Program for Placing of Elements, Data on Engineering.
entre mai et juin 1965
Album de photographies relatives au pont-tunnel Louis-Hippolyte-Lafontaine, Boucherville, Québec
Actions:
ARCH193310
Description:
Cribs, employees, official visits; tunnel section built in place for 1500 ft.; end closed; removed cofferdam, flooded; floating the caissons, flooding progress, dikes, plug blasts, putting ballast in, pre-stress cables, scows, divers; Hydro Québec dredges, scows, cable and anchors (32,000 tons each), anchors, suspensions cables, divers, sand jetting equipment. Also: Design Program for Placing of Elements, Data on Engineering.
photographies
entre mai et juin 1965
photographies
ARCH193311
Description:
Cribs, employees, official visits; tunnel section built in place for 1500 ft.; end closed; removed cofferdam, flooded; floating the caissons, flooding progress, dikes, plug blasts, putting ballast in, pre-stress cables, scows, divers; Hydro Québec dredges, scows, cable and anchors (32,000 tons each), anchors, suspensions cables, divers, sand jetting equipment. Also: Design Program for Placing of Elements, Data on Engineering.
entre juillet et septembre 1965
Album de photographies relatives au pont-tunnel Louis-Hippolyte-Lafontaine, Boucherville, Québec
Actions:
ARCH193311
Description:
Cribs, employees, official visits; tunnel section built in place for 1500 ft.; end closed; removed cofferdam, flooded; floating the caissons, flooding progress, dikes, plug blasts, putting ballast in, pre-stress cables, scows, divers; Hydro Québec dredges, scows, cable and anchors (32,000 tons each), anchors, suspensions cables, divers, sand jetting equipment. Also: Design Program for Placing of Elements, Data on Engineering.
photographies
entre juillet et septembre 1965
photographies
ARCH193312
Description:
Cribs, employees, official visits; tunnel section built in place for 1500 ft.; end closed; removed cofferdam, flooded; floating the caissons, flooding progress, dikes, plug blasts, putting ballast in, pre-stress cables, scows, divers; Hydro Québec dredges, scows, cable and anchors (32,000 tons each), anchors, suspensions cables, divers, sand jetting equipment. Also: Design Program for Placing of Elements, Data on Engineering.
entre septembre et décembre 1965
Album de photographies relatives au pont-tunnel Louis-Hippolyte-Lafontaine, Boucherville, Québec
Actions:
ARCH193312
Description:
Cribs, employees, official visits; tunnel section built in place for 1500 ft.; end closed; removed cofferdam, flooded; floating the caissons, flooding progress, dikes, plug blasts, putting ballast in, pre-stress cables, scows, divers; Hydro Québec dredges, scows, cable and anchors (32,000 tons each), anchors, suspensions cables, divers, sand jetting equipment. Also: Design Program for Placing of Elements, Data on Engineering.
photographies
entre septembre et décembre 1965
photographies
AP115.S2.001
1985-1990
photographies
1985-1990
photographies
ARCH284140
Description:
Contient les négatifs sur nitrate numérotés 205 à 299.
1920s-1940s
Photographies d'œuvres d'art, d'œuvres par Cormier, de voyages à Venise et d'architecture
Actions:
ARCH284140
Description:
Contient les négatifs sur nitrate numérotés 205 à 299.
photographies
1920s-1940s
dessins
Quantité:
7 dessin(s)
ARCH167334
dessins
Quantité:
7 dessin(s)
dessins, documents textuels, photographies
ARCH165527
dessins, documents textuels, photographies