documents textuels
Quantité:
4 textual record(s)
ARCH267584
Description:
This group consists of a folder about the work progress of the Palais des Congrès de Montréal. There is also a press release about the visit of the minister to the Palais des Congrès and a copy of a text written on the occasion of its opening.
1981-1983
A folder about the work progress of the Palais des Congrès de Montréal
Actions:
ARCH267584
Description:
This group consists of a folder about the work progress of the Palais des Congrès de Montréal. There is also a press release about the visit of the minister to the Palais des Congrès and a copy of a text written on the occasion of its opening.
documents textuels
Quantité:
4 textual record(s)
1981-1983
19 septembre 2024, 12h à 14h
PH1988:0436.02:013
1963
View of road work on Barnstaple Long Bridge, Devon, United Kingdom
Actions:
PH1988:0436.02:013
DR1995:0281:062:002
1970s?
Document describing the "Heightshrinker FH 1600" mobile lifting and work platform
Actions:
DR1995:0281:062:002
PH1986:0897
ca. 1986
Silvestieri Company workshop, with molds and work tables, San Francisco, California
Actions:
PH1986:0897
ARCH216400
DR1998:0120:017
Description:
Numbered on verso.
1989
Painting for Berlin Night depicting Lion Tamer's House and Work Space
Actions:
DR1998:0120:017
Description:
Numbered on verso.
documents textuels
ARCH270767
1999
documents textuels
1999
documents textuels
AP075.S1.2008.PR02.017
Description:
Includes also reference material from Oberlander other project in Yellowknife for the Northwest Territories Legislative Assembly Building.
2008-2013
Scope of work, correspondence and documentation, Inuvik School, Inuvik, Northwest Territories
Actions:
AP075.S1.2008.PR02.017
Description:
Includes also reference material from Oberlander other project in Yellowknife for the Northwest Territories Legislative Assembly Building.
documents textuels
2008-2013
documents textuels
Quantité:
3 File
ARCH39250
Description:
specifications for mechanical and electrical work draughted for the addition to Trenton Exchange Building, 1956; 3 diazotypes for column schedule, 1st and 2nd floor structures; engineering brief
1956
Specifications for mechanical and electrical work draughted for the addition to Trenton Exchange Building
Actions:
ARCH39250
Description:
specifications for mechanical and electrical work draughted for the addition to Trenton Exchange Building, 1956; 3 diazotypes for column schedule, 1st and 2nd floor structures; engineering brief
documents textuels
Quantité:
3 File
1956