1
1

Southlands School Play Area, Vancouver, British Columbia (1969)

Southlands School Play Area, Vancouver, British Columbia (1969)

Part of

People

  • Cornelia Hahn Oberlander (landscape architect)
  • Cornelia Hahn Oberlander (archive creator)

Title

Southlands School Play Area, Vancouver, British Columbia (1969)

Dates of creation

1969

Level of archival description

Project

Extent and Medium

  • 0.02 l.m. of textual records
  • 6 photographs
  • 2 drawings (including 1 reprographic copy)

Scope and Content

Project series documents detailing of play area project for Southlands School, Vancouver, British Columbia. Cornelia Hahn Oberlander worked on this project in 1969. It contains general landscape plans and textual records related to project management and press coverage.

Reference Number

AP075.S1.1969.PR02

Arrangement

Material in this project series was kept in its original order when it was first processed upon its arrival at CCA.

Language of material

Documents are in English.

Inventory

Sort by: 

  • Actions:
    See more Close
    • Reference Number: AP075.S1.1969.PR02.001
    • Title: Correspondence and design development drawing, Southlands School Play Area, Vancouver, British Columbia
    • Dates of creation: 1969
    • Form: drawings, textual records, photographs
    • Catalogued items within this file 2

    People:

    • Cornelia Hahn Oberlander (archive creator)
    • Cornelia Hahn Oberlander (landscape architect)

    Description:

    Also includes prrogress reports on the work, a photograph of the playground and research material. Original folder entitled "SOUTHLANDS PLAYGROUND".

    Quantity / Object type:

    1 File

    Extent and Medium:

    • 0.01 l.m. of textual records
    • 1 photograph
    • 1 reprographic copy

    Credit line:

    Cornelia Hahn Oberlander fonds
    Collection Centre Canadien d'Architecture/
    Canadian Centre for Architecture, Montréal;
    Don de Cornelia Hahn Oberlander/
    Gift of Cornelia Hahn Oberlander

    Folder Number:

    075-029-007

    Objects that have been catalogued:

      • ARCH401935
      • Progress report for Southlands School Play Area, Vancouver, British Columbia
      • Form: textual records
      • Add to folder
      • ARCH401936
      • Thoughts of parents and teachers on proposal for Southlands School Play Area, Vancouver, British Columbia
      • Form: textual records
      • Add to folder
  • Actions:
    See more Close
    • Reference Number: AP075.S1.1969.PR02.002
    • Title: Photographs and correspondence, Southlands School Play Area, Vancouver, British Columbia
    • Dates of creation: 1969-1971
    • Form: textual records, photographs
    • Catalogued items within this file 5

    People:

    • Cornelia Hahn Oberlander (archive creator)
    • Cornelia Hahn Oberlander (landscape architect)

    Description:

    Also includes cost estimates and press on the project. Original folder entitled "SOUTHLANDS SCHOOL".

    Quantity / Object type:

    1 File

    Extent and Medium:

    • 5 photographs
    • 0.01 l.m. of textual records

    Credit line:

    Cornelia Hahn Oberlander fonds
    Collection Centre Canadien d'Architecture/
    Canadian Centre for Architecture, Montréal;
    Don de Cornelia Hahn Oberlander/
    Gift of Cornelia Hahn Oberlander

    Folder Number:

    075-029-008

    Objects that have been catalogued:

  • Actions:
    See more Close
    • Reference Number: AP075.S1.1969.PR02.003
    • Title: Design development drawing, Southlands School Play Area, Vancouver, British Columbia
    • Dates of creation: 1969
    • Form: drawings
    • Catalogued items within this file 1

    People:

    • Cornelia Hahn Oberlander (archive creator)
    • Cornelia Hahn Oberlander (landscape architect)

    Quantity / Object type:

    1 File

    Stage and Purpose:

    • landscape

    Extent and Medium:

    • 1 drawing

    Dimensions:

    sheet: 71 x 96 cm

    Credit line:

    Cornelia Hahn Oberlander fonds
    Collection Centre Canadien d'Architecture/
    Canadian Centre for Architecture, Montréal;
    Don de Cornelia Hahn Oberlander/
    Gift of Cornelia Hahn Oberlander

    Folder Number:

    075-011-003

    Objects that have been catalogued:

      • ARCH401942
      • Site plan and detail for sandbox for Southlands School Play Area, Vancouver, British Columbia
      • Form: drawings
      • Add to folder
1
1

Sign up to get news from us

Email address
First name
Last name
By signing up you agree to receive our newsletter and communications about CCA activities. You can unsubscribe at any time. For more information, consult our privacy policy or contact us.

Thank you for signing up. You'll begin to receive emails from us shortly.

We’re not able to update your preferences at the moment. Please try again later.

You’ve already subscribed with this email address. If you’d like to subscribe with another, please try again.

This email was permanently deleted from our database. If you’d like to resubscribe with this email, please contact us

Please complete the form below to buy:
[Title of the book, authors]
ISBN: [ISBN of the book]
Price [Price of book]

First name
Last name
Address (line 1)
Address (line 2) (optional)
Postal code
City
Country
Province/state
Email address
Phone (day) (optional)
Notes

Thank you for placing an order. We will contact you shortly.

We’re not able to process your request at the moment. Please try again later.

Folder ()

Your folder is empty.

Email:
Subject:
Notes:
Please complete this form to make a request for consultation. A copy of this list will also be forwarded to you.

Your contact information
First name:
Last name:
Email:
Phone number:
Notes (optional):
We will contact you to set up an appointment. Please keep in mind that your consultation date will be based on the type of material you wish to study. To prepare your visit, we'll need:
  • — At least 2 weeks for primary sources (prints and drawings, photographs, archival documents, etc.)
  • — At least 48 hours for secondary sources (books, periodicals, vertical files, etc.)
...