1
1

Centro Cultural de Sines [Sines Cultural Centre], Sines, Portugal (1982-1985)

Centro Cultural de Sines [Sines Cultural Centre], Sines, Portugal (1982-1985)

Inclus dans

Personnes et institutions

  • Álvaro Siza (archive creator)
  • Álvaro Siza (architect)

Titre

Centro Cultural de Sines [Sines Cultural Centre], Sines, Portugal (1982-1985)

Dates de création

1982-1985

Niveau de description archivistique

Project

Collation

  • 228 drawings (including 59 reprographic copies)
  • 79 photographic materials
  • 0.03 linear metres of textual records

Présentation du contenu

This project series document the Centro Cultural de Sines in Sines, Portugal. While the records were held in the office’s archives this project was assigned the number 15/80. The office assigned the dates 1982-1985 to this project.

The project was for the Sines Cultural Centre, which was divided into three buildings (A, B, and C). Building A included offices, an auditorium, meeting rooms and a bar, Building B held a museum, and Building C included a library on two floors. The project was not built.

Documenting this project are sketches, studies, design development drawings and plans. Textual materials include project documentation and correspondence. Photographic materials document the models.

Numéro de réference

AP178.S1.1982.PR04

Mode de classement

Material in this series was arranged by Álvaro Siza’s office and has been kept in this order.

Localisation

Sines Portugal

Mention de crédit

When citing the collection as a whole, use the citation: Álvaro Siza fonds, Collection Centre Canadien d’Architecture/Canadian Centre for Architecture, Montréal. When citing specific collection material, please refer to the object’s specific credit line.

Langue et écriture des documents

Portuguese

Inventaire

Trier par: 

  • Voir plus Fermer
    • Numéro de réference: AP178.S1.1982.PR04.001
    • Titre: Sketches, Centro Cultural de Sines, Sines
    • Dates de création: 1982-1985
    • Classification: dessins
    • Objets catalogués : 0

    Personnes et institutions:

    • Álvaro Siza (archive creator)

    Description:

    Original file title: Centro Cultura De Sine

    Quantité / Type d’objet:

    1 File

    Collation:

    • 39 ink drawings on paper

    Mention de crédit:

    Álvaro Siza fonds
    Collection Centre Canadien d'Architecture/
    Canadian Centre for Architecture, Montréal
    Don d’Álvaro Siza/
    Gift of Álvaro Siza

    Numéro de chemise:

    178-502-08

  • Voir plus Fermer
    • Numéro de réference: AP178.S1.1982.PR04.002.1
    • Titre: Studies, Centro Cultural de Sines, Sines (folder 1 of 2)
    • Dates de création: 1982-1985
    • Classification: dessins
    • Objets catalogués : 0

    Personnes et institutions:

    • Álvaro Siza (archive creator)

    Description:

    Original file title: Centro Cultura De Sines - Estudos Arq. Siza

    Nota: Desenho do projecto ver mesa

    Quantité / Type d’objet:

    1 File

    Collation:

    • 10 pencil and color pencils drawings on paper

    Dimensions:

    Sheet (largest): 38 x 48 cm|Sheet (smallest): 25 x 42 cm

    Mention de crédit:

    Álvaro Siza fonds
    Collection Centre Canadien d'Architecture/
    Canadian Centre for Architecture, Montréal
    Don d’Álvaro Siza/
    Gift of Álvaro Siza

    Numéro de chemise:

    178-461-09

  • Voir plus Fermer
    • Numéro de réference: AP178.S1.1982.PR04.002.2
    • Titre: Studies, Centro Cultural de Sines, Sines (folder 2 of 2)
    • Dates de création: 1982-1985
    • Classification: dessins
    • Objets catalogués : 2

    Personnes et institutions:

    • Álvaro Siza (archive creator)

    Description:

    Original file title: Centro Cultura De Sines - Estudos Arq. Siza

    Nota: Desenho do projecto ver mesa

    Reprographic copies feature sketches.

    Quantité / Type d’objet:

    1 File

    Collation:

    • 29 pencil and color pencils drawings on paper, 3 reprographic copies on paper

    Dimensions:

    Sheet (largest): 60 x 105 cm|Sheet (smallest): 42 x 60 cm

    Mention de crédit:

    Álvaro Siza fonds
    Collection Centre Canadien d'Architecture/
    Canadian Centre for Architecture, Montréal
    Don d’Álvaro Siza/
    Gift of Álvaro Siza

    Sources complémentaires:

    • This file is housed in two separate folders. The second portion of this file is found in folder AP178.S1.1982.PR04.002.1

    Numéro de chemise:

    178-491-05

    Objets catalogués:

  • Voir plus Fermer
    • Numéro de réference: AP178.S1.1982.PR04.003.1
    • Titre: Studies and design development drawings, Centro Cultural de Sines, Sines (folder 1 of 3)
    • Dates de création: 1982-1985
    • Classification: dessins
    • Objets catalogués : 1

    Personnes et institutions:

    • Álvaro Siza (archive creator)

    Quantité / Type d’objet:

    1 File

    Collation:

    • 8 pencil and color pencils drawings on paper

    Dimensions:

    Sheet (largest): 30 x 37 cm|Sheet (smallest): 18 x 24 cm

    Mention de crédit:

    Álvaro Siza fonds
    Collection Centre Canadien d'Architecture/
    Canadian Centre for Architecture, Montréal
    Don d’Álvaro Siza/
    Gift of Álvaro Siza

    Sources complémentaires:

    • This file is housed in three separate folders. The second and third portion of this file is housed in AP178.S1.1982.PR04.003.2 and AP178.S1.1982.PR04.003.3

    Numéro de chemise:

    178-404-09

    Objets catalogués:

  • Voir plus Fermer
    • Numéro de réference: AP178.S1.1982.PR04.003.2
    • Titre: Studies and design development drawings, Centro Cultural de Sines, Sines (folder 2 of 3)
    • Dates de création: 1982-1985
    • Classification: dessins
    • Objets catalogués : 2

    Personnes et institutions:

    • Álvaro Siza (archive creator)

    Description:

    Original file title: Centro Cultura De Sines - Estudos/Matrizes - Collaboradores

    Quantité / Type d’objet:

    1 File

    Collation:

    • 38 pencil and color pencils drawings on paper, 1 reprographic copy

    Mention de crédit:

    Álvaro Siza fonds
    Collection Centre Canadien d'Architecture/
    Canadian Centre for Architecture, Montréal
    Don d’Álvaro Siza/
    Gift of Álvaro Siza

    Sources complémentaires:

    • This file is housed in three separate folders. The second and third portion of this file is housed in AP178.S1.1982.PR04.003.1 and AP178.S1.1982.PR04.003.3

    Numéro de chemise:

    178-462-13

    Objets catalogués:

  • Voir plus Fermer
    • Numéro de réference: AP178.S1.1982.PR04.003.3
    • Titre: Studies and design development drawings, Centro Cultural de Sines, Sines (folder 3 of 3)
    • Dates de création: 1982-1985
    • Classification: dessins
    • Objets catalogués : 0

    Personnes et institutions:

    • Álvaro Siza (archive creator)

    Description:

    Original file title: Centro Cultura De Sines - Estudos/Matrizes - Collaboradores

    Quantité / Type d’objet:

    1 File

    Collation:

    • 24 pencil and color pencils drawings on paper, 3 reprographic copies

    Dimensions:

    Sheet (largest): 76 x 124 cm|Sheet (smallest): 20 x 74 cm

    Mention de crédit:

    Álvaro Siza fonds
    Collection Centre Canadien d'Architecture/
    Canadian Centre for Architecture, Montréal
    Don d’Álvaro Siza/
    Gift of Álvaro Siza

    Sources complémentaires:

    • This file is housed in three separate folders. The second and third portion of this file is housed in AP178.S1.1982.PR04.003.1 and AP178.S1.1982.PR04.003.2

    Numéro de chemise:

    178-491-06

  • Voir plus Fermer
    • Numéro de réference: AP178.S1.1982.PR04.004
    • Titre: Studies of the St-André cultural center, Centro Cultural de Sines, Sines
    • Dates de création: December 1982
    • Classification: dessins, documents textuels
    • Objets catalogués : 3

    Personnes et institutions:

    • Álvaro Siza (archive creator)

    Description:

    Original file title: Estudio previo de Actividades Culturais e Servicos de St. André - Dezembro '82

    Quantité / Type d’objet:

    1 File

    Collation:

    • 32 reprographic copies on paper, other materials

    Dimensions:

    Sheet: 30 x 42 cm

    Mention de crédit:

    Álvaro Siza fonds
    Collection Centre Canadien d'Architecture/
    Canadian Centre for Architecture, Montréal
    Don d’Álvaro Siza/
    Gift of Álvaro Siza

    Numéro de chemise:

    178-461-08

    Objets catalogués:

  • Voir plus Fermer
    • Numéro de réference: AP178.S1.1982.PR04.005
    • Titre: Floor plans and sections, Centro Cultural de Sines, Sines
    • Dates de création: 1981-1986
    • Classification: dessins
    • Objets catalogués : 0

    Personnes et institutions:

    • Álvaro Siza (archive creator)

    Description:

    Original file title: Centro Cultura De Sines GOP

    Quantité / Type d’objet:

    1 File

    Collation:

    • 7 reprographic copies

    Dimensions:

    Sheet: 21 x 30 cm

    Mention de crédit:

    Álvaro Siza fonds
    Collection Centre Canadien d'Architecture/
    Canadian Centre for Architecture, Montréal
    Don d’Álvaro Siza/
    Gift of Álvaro Siza

    Numéro de chemise:

    178-086-002

  • Voir plus Fermer
    • Numéro de réference: AP178.S1.1982.PR04.006
    • Titre: Photographs of models, Centro Cultural de Sines, Sines
    • Dates de création: 1981-1986
    • Classification: photographies
    • Objets catalogués : 0

    Personnes et institutions:

    • Álvaro Siza (archive creator)

    Description:

    Original file title: Centro Cultura De Sines repetidas - Stampe Bianco nero maquete de Sines

    Quantité / Type d’objet:

    1 File

    Collation:

    • 20 photographs

    Dimensions:

    Photograph (largest): 40 x 60 cm|Photograph (smallest): 15 x 23 cm

    Mention de crédit:

    Álvaro Siza fonds
    Collection Centre Canadien d'Architecture/
    Canadian Centre for Architecture, Montréal
    Don d’Álvaro Siza/
    Gift of Álvaro Siza

    Numéro de chemise:

    178-352-15

  • Voir plus Fermer
    • Numéro de réference: AP178.S1.1982.PR04.007.1
    • Titre: Project documentation, correspondence, and plans, Centro Cultural de Sines, Sines (folder 1 of 2)
    • Dates de création: 1981-1986
    • Classification: dessins, documents textuels
    • Objets catalogués : 0

    Personnes et institutions:

    • Álvaro Siza (archive creator)

    Description:

    Original file title: Centro Cultura De Sines

    Quantité / Type d’objet:

    1 File

    Collation:

    • 8 reprographic copies, other materials

    Dimensions:

    Sheet: 21 x 30 cm

    Caractéristiques matérielles et contraintes techniques:

    Reprographic copies are folded

    Mention de crédit:

    Álvaro Siza fonds
    Collection Centre Canadien d'Architecture/
    Canadian Centre for Architecture, Montréal
    Don d’Álvaro Siza/
    Gift of Álvaro Siza

    Sources complémentaires:

    • This file is housed in two separate folders. The second portion of this file is found in folder AP178.S1.1982.PR04.007.2

    Numéro de chemise:

    178-085-015

  • Voir plus Fermer
    • Numéro de réference: AP178.S1.1982.PR04.007.2
    • Titre: Project documentation, correspondence, and plans, Centro Cultural de Sines, Sines (folder 2 of 2)
    • Dates de création: 1981-1986
    • Classification: dessins, documents textuels
    • Objets catalogués : 0

    Personnes et institutions:

    • Álvaro Siza (archive creator)

    Description:

    Original file title: Centro Cultura De Sines

    Quantité / Type d’objet:

    1 File

    Collation:

    • 3 reprographic copies, other materials

    Dimensions:

    Sheet: 21 x 30 cm

    Mention de crédit:

    Álvaro Siza fonds
    Collection Centre Canadien d'Architecture/
    Canadian Centre for Architecture, Montréal
    Don d’Álvaro Siza/
    Gift of Álvaro Siza

    Sources complémentaires:

    • This file is housed in two separate folders. The second portion of this file is found in folder AP178.S1.1982.PR04.007.1

    Numéro de chemise:

    178-086-001

  • Voir plus Fermer
    • Numéro de réference: AP178.S1.1982.PR04.008.1
    • Titre: Floor plans, sections, elevations, and details, Centro Cultural de Sines, Sines (folder 1 of 2)
    • Dates de création: 1982-1985
    • Classification: dessins
    • Objets catalogués : 3

    Personnes et institutions:

    • Álvaro Siza (archive creator)

    Description:

    Original file title: Centro Cultura De Sines - 1982-1985

    Nota: Ver tambem A3.4

    Quantité / Type d’objet:

    1 File

    Collation:

    • 11 ink drawings on translucent paper, 2 reprographic copies on paper

    Dimensions:

    Sheet (largest): 62 x 96 cm|Sheet (smallest): 30 x 61 cm

    Mention de crédit:

    Álvaro Siza fonds
    Collection Centre Canadien d'Architecture/
    Canadian Centre for Architecture, Montréal
    Don d’Álvaro Siza/
    Gift of Álvaro Siza

    Sources complémentaires:

    • This file is housed in two separate folders. The second portion of this file is found in folder AP178.S1.1982.PR04.008.2

    Numéro de chemise:

    178-519-04

    Objets catalogués:

  • Voir plus Fermer
    • Numéro de réference: AP178.S1.1982.PR04.008.2
    • Titre: Floor plans, sections, elevations, and details, Centro Cultural de Sines, Sines (folder 2 of 2)
    • Dates de création: 1982-1985
    • Classification: dessins
    • Objets catalogués : 9

    Personnes et institutions:

    • Álvaro Siza (archive creator)

    Description:

    Original file title: Centro Cultura De Sines - 1982-1985

    Nota: Ver tambem A3.4

    Quantité / Type d’objet:

    1 File

    Collation:

    • 10 ink drawings on translucent paper

    Dimensions:

    Sheet: 64 x 136 cm

    Mention de crédit:

    Álvaro Siza fonds
    Collection Centre Canadien d'Architecture/
    Canadian Centre for Architecture, Montréal
    Don d’Álvaro Siza/
    Gift of Álvaro Siza

    Sources complémentaires:

    • This file is housed in two separate folders. The second portion of this file is found in folder AP178.S1.1982.PR04.008.1

    Numéro de chemise:

    178-2018-520 XL

    Objets catalogués:

  • Voir plus Fermer
    • Numéro de réference: AP178.S1.1982.PR04.009
    • Titre: Negatives of models, Centro Cultural de Sines, Sines
    • Dates de création: 1981-1986
    • Classification: photographies
    • Objets catalogués : 0

    Personnes et institutions:

    • Álvaro Siza (archive creator)

    Description:

    Original file title: Centro Cultura De Sines - Sines

    1) Nota: contem um negativos da Casa Bahia 17/80
    2) Nota: existem dois negativos de Sines no projecto 17/80 Casa Mario Bahia

    Siza's office numbered photographs in this file CCS001-CCS010

    Quantité / Type d’objet:

    1 File

    Collation:

    • 5 35mm negative strips

    Mention de crédit:

    Álvaro Siza fonds
    Collection Centre Canadien d'Architecture/
    Canadian Centre for Architecture, Montréal
    Don d’Álvaro Siza/
    Gift of Álvaro Siza

    Numéro de chemise:

    178-556-01

  • Voir plus Fermer
    • Numéro de réference: AP178.S1.1982.PR04.010
    • Titre: Negatives of models, Centro Cultural de Sines, Sines
    • Dates de création: 1981-1986
    • Classification: photographies
    • Objets catalogués : 0

    Personnes et institutions:

    • Álvaro Siza (archive creator)

    Description:

    Original file title: Centro Cultura De Sines - Sines - © Teresa Siza

    Siza's office numbered photographs in this file CCS001a, CCS007a-CCS010a, CCS013-CCS014

    Quantité / Type d’objet:

    1 File

    Collation:

    • 12 120mm negative strips

    Mention de crédit:

    Álvaro Siza fonds
    Collection Centre Canadien d'Architecture/
    Canadian Centre for Architecture, Montréal
    Don d’Álvaro Siza/
    Gift of Álvaro Siza

    Numéro de chemise:

    178-556-02

  • Voir plus Fermer
    • Numéro de réference: AP178.S1.1982.PR04.011
    • Titre: Photographs and negatives of project site, Centro Cultural de Sines, Sines
    • Dates de création: 1981-1986
    • Classification: photographies
    • Objets catalogués : 0

    Personnes et institutions:

    • Álvaro Siza (archive creator)

    Description:

    Original file title: Centro Cultura De Sines - Levantamento fotografico do existente

    Nota: não digitalizado

    Quantité / Type d’objet:

    1 File

    Collation:

    • 32 photographs, 10 35mm negative strips

    Mention de crédit:

    Álvaro Siza fonds
    Collection Centre Canadien d'Architecture/
    Canadian Centre for Architecture, Montréal
    Don d’Álvaro Siza/
    Gift of Álvaro Siza

    Numéro de chemise:

    178-556-03

1
1

Inscrivez-vous pour recevoir de nos nouvelles

Courriel
Prénom
Nom
En vous abonnant, vous acceptez de recevoir notre infolettre et communications au sujet des activités du CCA. Vous pouvez vous désabonner en tout temps. Pour plus d’information, consultez notre politique de confidentialité ou contactez-nous.

Merci. Vous êtes maintenant abonné. Vous recevrez bientôt nos courriels.

Pour le moment, notre système n’est pas capable de mettre à jour vos préférences. Veuillez réessayer plus tard.

Vous êtes déjà inscrit avec cette adresse électronique. Si vous souhaitez vous inscrire avec une autre adresse, merci de réessayer.

Cete adresse courriel a été définitivement supprimée de notre base de données. Si vous souhaitez vous réabonner avec cette adresse courriel, veuillez contactez-nous

Veuillez, s'il vous plaît, remplir le formulaire ci-dessous pour acheter:
[Title of the book, authors]
ISBN: [ISBN of the book]
Prix [Price of book]

Prénom
Nom de famille
Adresse (ligne 1)
Adresse (ligne 2) (optionnel)
Code postal
Ville
Pays
Province / État
Courriel
Téléphone (jour) (optionnel)
Notes

Merci d'avoir passé une commande. Nous vous contacterons sous peu.

Nous ne sommes pas en mesure de traiter votre demande pour le moment. Veuillez réessayer plus tard.

Classeur ()

Votre classeur est vide.

Adresse électronique:
Sujet:
Notes:
Veuillez remplir ce formulaire pour faire une demande de consultation. Une copie de cette liste vous sera également transmise.

Vos informations
Prénom:
Nom de famille:
Adresse électronique:
Numéro de téléphone:
Notes (optionnel):
Nous vous contacterons pour convenir d’un rendez-vous. Veuillez noter que des délais pour les rendez-vous sont à prévoir selon le type de matériel que vous souhaitez consulter, soit :"
  • — au moins 2 semaines pour les sources primaires (dessins et estampes, photographies, documents d’archives, etc.)
  • — au moins 48 heures pour les sources secondaires (livres, périodiques, dossiers documentaires, etc.)
...